Division Websites

Personnel Menu

HINT: Press CTRL-D to add this page to your Favorites / Bookmarks.

A Standard Form 330 – Architect-Engineer Qualifications (SF 330) is required.
SF 330, Part I – Contract-Specific Qualifications (MUST BE IN RESPONSE TO EACH INDIVIDUAL REQUIREMENT)
SF 330, Part II – General Qualifications – HIGHLY SUGGEST you place SF 330, Part II in Online Representations and Certifications Application (ORCA)
SF 330 Form available on-line at: http://www.gsa.gov/forms.
SF 330 software packages are available from a variety of vendors.

Help Hints & Reminders when filling out the SF 330:

1. Both prime and sub consultants must sign and date the SF 330
2. Prime consults must verify their sub consultants when submitting their package.
3. Separate DUNS and CAGE codes are required for each office or new Joint/Venture when submitting your package.

Corps of Engineers' pamphlet on Competing for Architect-Engineer Contracts (EP 715-1-4)
Architect-Engineer Contracting Guide - Hazardous, Toxic, Radioactive Waste (HTRW) Contracting EP 715-1-5)
A-E contracting process (EP 715-1-7)