PA08-24 Corps expands work area at Zoar - 25 Mar 08
HUNTINGTON, WV... The U.S. Army Corps of Engineers is continuing its interim risk reduction measures on the Zoar Levee. TAB Construction, contractor for the Corps, is 60% complete with the initial filter placement.
HyperLink Disclaimer:The appearance of hyperlinks does not constitute endorsement by the U.S. Army of this Web site or the information, products or services contained therein. For other than authorized activities such as military exchanges and Morale, Welfare and Recreation sites, the U.S. Army does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD Web site.