Notice No. |
Date Issued |
Description |
08-48 |
November 24, 2008 |
Removal of Abandoned De-Energized Transmission Wires By Duquesne Light Company Crossing the Beaver River at Approximate Mile 4.0 |
08-47 |
November 13, 2008 |
Temporary Drawn Down of Navigation Pool and Boating Safety Zone at Lock and Dam 6, Allegheny River Mile 36.3
|
08-46 |
November 10, 2008 |
Installation of 138 kV Aerial Power Line By Duquesne Light Company
Crossing the Allegheny River, Mile 15.9
|
08-45 |
November 4, 2008 |
FirstEnergy (Ohio Edison) Sammis Plant Upgrading and Modifications Ohio River, Mile 54.0
|
08-44 |
October 27, 2008 |
Temporary Lowering of Pools for Remote Operating Vehicle (ROV) Dam Inspections at
Lock and Dam 8, Allegheny River, Mile 52.6 and Lock and Dam 9, Allegheny River Mile 62.2
|
08-43 |
October 14, 2008 |
Removal of Mooring Cell Monongahela River, Maxwell
Locks and Dam Pool, Between River Miles 61.2 & 62
|
08-42 |
October 03, 2008 |
Installation of 138 kV Aerial Power Line by
Duquesne Light Company, Crossing the Allegheny River, Mile 15.9 |
08-41 |
October 01, 2008 |
Seasonal Lock Closings and
Schedule
of Lock Operation for Monongahela River |
08-40 |
October 01, 2008 |
Seasonal Lock Closings and
Schedule of Operations for Allegheny River |
08-39 |
October 01, 2008 |
Removal of Small Boat Warning Signs and
Buoys Allegheny, Monongahela, and Ohio Rivers |
08-38 |
October 01, 2008 |
Temporary Lowering of Pools for Dive Inspections and Sounding Surveys
Lock and Dam 5, Allegheny River, Mile 30.4 and
Lock and Dam 6, Allegheny River Mile 36.3
|
08-37 |
September 25, 2008 |
Removal of Flashboards
Lock and Dam No. 9, Allegheny River, Mile 62.2 |
08-36 |
September 10, 2008 |
Dashields
Locks and Dam, Ohio River, Mile 13.3
3-Day Closure of the Auxiliary 56 ft x 360 ft Lock Chamber |
08-35 |
September 10, 2008 |
Dashields
Locks and Dam, Ohio River, Mile 13.3
6-Day Closure of the Main 110 ft x 600 ft Lock Chamber |
08-34 |
September 9, 2008 |
10-HOUR CLOSURE
LOCK CLOSURE AT NEW CUMBERLAND LOCKS
FirstEnergy (Ohio Edison) Sammis Plant, Barge Roll-off Operations Ohio
River, Mile 54.6 |
08-33 |
September 5, 2008 |
Installation of 138 kV
Aerial Power Line
By Duquesne Light Company
Crossing the Allegheny River, Mile 15.9 |
08-32 |
September 5, 2008 |
Construction of
Limestone Unloading and Empty Barge Storage Area
By Monongahela Power Company
Monongahela River, Left Bank, Mile 91.7-92.7 |
08-31 |
August 21, 2008 |
Montgomery
Locks and Dam, Ohio River, Mile 31.7, 3-day closure of the Large 110-ft x
600-ft Lock Chamber Repair Upstream Middle Wall Lock Gate and Upstream
Emergency Dam |
08-30 |
August 13, 2008 |
CANCELLED
Opekiska L/D, Monongahela River, Mile 115.4 Renovate River Wall Filling and
Emptying Valves |
08-28 |
July 22, 2008 |
Maxwell
Locks and Dam, Monongahela River
Damaged Mooring Cell at
Monongahela River Mile 62 |
08-29 |
August 4, 2008 |
10-HOUR CLOSURE LOCK CLOSURE AT NEW
CUMBERLAND LOCKS
FirstEnergy (Ohio Edison) Sammis Plant, Barge Roll-off OperationsOhio River,
Mile 54.6 |
08-28 |
July 22, 2008 |
Maxwell
Locks and Dam, Monongahela River
Damaged Mooring Cell at
Monongahela River Mile 62 |
08-27 |
June 30, 2008 |
Braddock Locks and Dam,
Monongahela River
Mile 11.31-Day Closure of the Large 110-ft x 720-ft Lock Chamber |
08-26 |
July 16, 2008 |
6-HOUR CLOSURES
MONTGOMERY L/D
OHIO RIVER
MILE 31.7 |
08-25 |
June 30, 2008 |
LOCK
CLOSURE AT NEW
CUMBERLAND LOCKS FirstEnergy (Ohio Edison) Sammis Plant,
Barge Roll-off Operations
Ohio River, Mile 54.6 |
08-24 |
June 20, 2008 |
Notice is given that GAL
Construction, contractor for Matt Canestrale Contracting, Inc., will be
dismantling a raw coal conveyor suspension bridge over the Monongahela River
at Mile 63.16 near LaBelle, Pennsylvania. |
08-23 |
June 6, 2008 |
Removal of Overhead
Transmission Conductors Crossing the Allegheny River, Mile 15.9
By Duquesne Light Company |
08-22 |
June 5, 2008 |
New Cumberland L/D, Ohio
River, Mile 54.3 Replace Middle Wall Emptying Valve and Renovate Operating
Machinery in the Large 110-ft x 1200-ft Lock Chamber |
08-21 |
May 21, 2008 |
LOCK
CLOSURE AT NEW
CUMBERLAND LOCKS FirstEnergy (Ohio Edison) Sammis Plant,
Barge Roll-off Operations
Ohio River, Mile 54.6 |
08-20 |
May 16, 2008 |
Removal of Overhead Transmission Conductors
Crossing the Allegheny River, Mile 15.9
By Duquesne Light Company |
08-19 |
May 21, 2008 |
REVISED
6-Hour Closure
Montgomery L/D, Ohio River
Mile 31.7 |
08-18 |
May 7, 2008 |
6-Hour Closure
Montgomery L/D, Ohio River Mile 31.7 |
08-17 |
May 7, 2008 |
Braddock L/D, Monongahela River, Mile 11.2
Replace Middle Wall Filling Valve and Renovate the Operating Machinery |
08-16 |
May 7, 2008 |
Braddock L/D, Monongahela
River, Mile 11.2
15 Day Closure of the Large 110' x 720' Lock Chamber |
08-15 |
May 8, 2008 |
Construction
of Two Mooring Cells
Monongahela River, Right Descending Bank
Between River Miles 40 & 41 |
08-14 |
April 22, 2008 |
New Mainline Pennsylvania
Turnpike Highway
Bridge Construction
Allegheny River, Mile 14.14 |
08-13 |
April 30, 2008 |
Installation of
Flashboards
Lock & Dam 9, Allegheny
River, Mile 62.2 |
08-11 |
April 18, 2008 |
Lock 4, Allegheny River,
Mile 24.2
Replace Filling and Emptying Valves |
08-12 |
April 17, 2008 |
Dam Warning Buoys
Allegheny, Monongahela, and Ohio Rivers |
08-10 |
April 14, 2008 |
LOCK CLOSURE AT NEW
CUMBERLAND LOCKS FirstEnergy (Ohio Edison) Sammis Plant, Barge Roll-off
Operations Ohio River, Mile 54.6 |
08-09 |
April 10, 2008 |
Repairs to CSX Railroad Bridge
Crossing the
Ohio River at Mile 25.7 |
08-08 |
March 28, 2008 |
Cancellation:
LOCK CLOSURE AT NEW
CUMBERLAND LOCKS FirstEnergy (Ohio Edison) Sammis Plant, Barge Roll-off
Operations Ohio River, Mile 54.6 |
08-07 |
March 28, 2008 |
Installation of 12.5 KV
Aerial Power Line By Allegheny Power Company
Crossing the Monongahela
River, Mile 96.2 |
08-06 |
March 7, 2008 |
Lock 2, Allegheny River,
Mile 6.7 Replace Land Wall Emptying Valve and Renovate Operating
Machinery in the Single 56-ft x 360-ft Lock Chamber |
08-05 |
February 29, 2008 |
Schedule of Operations for 2008
Allegheny River Locks |
08-04 |
February 29, 2008 |
Schedule of Operations
for 2008
Monongahela River Locks |
08-03 |
February 12, 2008 |
Hildebrand Lock and Dam,
Monongahela River, Mile 108.0 26-Day Closure of the Single 84-ft x 600-ft
Lock Chamber Inspect/Repair Lock Gates, Sills and Anchorages |
08-02 |
February 11, 2008 |
LOCK CLOSURE AT NEW
CUMBERLAND LOCKS
FirstEnergy (Ohio Edison) Sammis Plant, Barge Roll-off Operations Ohio
River, Mile 54.6 |
08-01 |
January 17, 2008 |
Locks and Dam 3, Monongahela
River, Mile 23.8, 19-Day Closure of the 56-ft x 360-ft River Lock Chamber to
Replace the Extended Chamber Lock Gates, to Renovate the Upstream and
Intermediate Lock Gates and to Renovate the Emptying and Filling Valve
Operating Machinery |
07-34 |
November 6, 2007 |
Repair/Maintenance Schedule for 2008 |
07-33 |
November 2, 2007 |
Winter Season Lock Closings
and Schedule of Lock Operation for Monongahela River |
07-32 |
November 2, 2007 |
Schedule of Operations - Allegheny River Locks |
07-31 |
November 1, 2007 |
Construction of Mooring
Cells Monongahela River, Between River Miles 40 & 41 |
07-30 |
October 11, 2007 |
Columbia Gas Submarine
Transmission Line Repairs Ohio River, Mile 46.9 |
07-29 |
October 5, 2007 |
Removal
of Small Boat Warning Signs and Buoys Allegheny, Monongahela, and Ohio
Rivers |
07-28 |
September 28, 2007 |
Pike Island L/D, Ohio River,
Mile 84.2 Replace Land Wall Filling Valve and Renovate Operating Machinery
in the 110-ft x 600-ft Land Lock Chamber |
07-27 |
September 27, 2007 |
Removal of Flashboards Lock and Dam No. 9,
Allegheny River, Mile 62.2 |
07-26 |
September 24, 2007 |
Braddock Locks and Dams,
Monongahela River, Mile 11.3, Closure of the Large 110' x 720' Lock Chamber,
Set Maintenance Bulk Heads |
07-25 |
September 7, 2007 |
Montgomery Locks and Dam,
Ohio River, Mile 31.7 Replace Land Wall Filling and Emptying Valves and
Renovate Operating Machinery in the 110-ft x 600-ft Lock Chamber |
07-24 |
August 13, 2007 |
Emsworth L/D, Ohio River,
Mile 6.2
33-Day Closure of the 56-ft x 360-ft River Lock Chamber |
07-23 |
August 10, 2007 |
REVISED
Emsworth Locks and Dams,
Ohio River, Mile 6.25-Day Closure of the Large 110-ft x 600-ft Lock Chamber
Repair Downstream Middle Wall Lock Gate |
07-22 |
July 20, 2007 |
EnviroScience, Inc., Diving
OperationsAllegheny River, Miles 37.0 to 40.25 |
07-21 |
July 10, 2007 |
Braddock Locks and Dam,
Monongahela River, Mile 11.3 Scheduled Closure of Main (110-ft x 720-ft)
Lock Chamber |
07-20 |
July 3, 2007 |
Lock and Dam 4, Allegheny River, Mile 24.2
- Special Draft Limitations During Low Water
|
07-19 |
July 3, 2007 |
Lock and Dam 4,
Monongahela River, Mile 41.5
Special Draft Limitations
During Low Water |
07-18 |
June 4, 2007 |
Gas Transmission Pipeline Replacement
Ohio River, River Mile
24.5
|
07-17 |
May 30, 2007 |
FirstEnergy (Ohio
Edison) Sammis Plant Upgrading and Modifications Ohio River, Mile 54.0 |
07-16 |
May 16, 2007 |
East Brady Highway Bridge
Demolition
Allegheny River, River Mile 69.4 |
07-15 |
May 7, 2007 |
Hannibal L/D, Ohio River, Mile 126.4, 40-Day Closure of the
110-ft x 1200-ft River Lock Chamber, Repair Lock Gate, Seals and Anchorages
|
07-14 |
May 3, 2007 |
Dam Warning Buoys
Allegheny,
Monongahela, and Ohio Rivers
|
07-13 |
May 8, 2007 |
REVISED
Installation of Flashboards - Lock & Dam 9, Allegheny River, Mile 62.2 |
07-12 |
April 10, 2007 |
FirstEnergy (Ohio Edison)
Sammis Plant, Upgrading and Modifications - Ohio River, Mile 54.0 |
07-11 |
April 5, 2007 |
Emsworth L/D, Ohio
River, Mile 6.2, 2-Day Closure of the 56-ft x 360-ft River Lock Chamber |
07-10 |
April 5, 2007 |
Braddock Locks and Dam,
Monongahela River, Mile 11.3; Scheduled Closures of Main (110-ft x 720-ft)
Lock Chamber |
07-09 |
March 30, 2007 |
Hannibal L/D, Ohio River, Mile 126.4,12-Hour
Closures of the 110-ft x 600-ft Land Lock Chamber Inspection of Upstream
Emergency Bulkheads
|
07-08 |
March 30, 2007 |
Schedule of Operations for
2007Monongahela
River Locks |
07-07 |
March 27, 2007 |
Schedule of Operations for 2007
Allegheny River Locks
|
07-06 |
March 7, 2007 |
Locks and Dam 3,
Monongahela River, Mile 23.8 10-Day Closure of the 56’ x 720’ Land Lock
Chamber to Renovate the Downstream Lock Gates and Repair the Emptying Valve
Operating Machinery |
07-05 |
March 12, 2007 |
FirstEnergy (Ohio Edison)
Sammis Plant, Upgrading and Modifications, Ohio River, Mile 54.0 |
07-04 |
February 12, 2007 |
Lock 4, Monongahela River,
Mile 41.5; Replace Middle Wall Emptying Valve and Renovate Operating
Machinery in the 56' x 720' Land Lock Chamber |
07-03 |
February 9, 2007 |
Lock and Dam 4, Monongahela River, Mile 41.5
3-Day Closure of the
Single, 56-ft X 720-ft, Lock Chamber to Replace the Upstream Miter Gates
|
07-02 |
January 12, 2007 |
C.W. Bill Young Lock and Dam, Allegheny River,
Mile 14.5,
Repair the Land Wall 8-ft x 10-ft Filling Valve and Repair
Deteriorated Hydraulic Pipeline Segments
|
07-01 |
January 5, 2007 |
Repair/Maintenance Schedule for 2007 |
06-39 |
October 27, 2006 |
Installation of 12-Inch Pipeline, By the City of
Wheeling,Crossing the Ohio River, Mile 90.0 |
06-38 |
October 20, 2006 |
Schedule of Operations
Allegheny River Locks |
06-37 |
October 11, 2006 |
Removal of Small Boat Warning Signs and Buoys on Allegheny,
Monongahela, and Ohio Rivers |
06-36 |
October 11, 2006 |
!!Cancelled!!
Lock 4, Monongahela River,
Mile 41.5 Replace Middle Wall Emptying Valve and Renovate Operating
Machinery in the 56-ft x 720-ft Land Lock Chamber |
06-35 |
September 28, 2006 |
Braddock L/D, Monongahela
River, Mile 11.3, Five 8-Hour Closures of Main (110-ft x 720-ft) Lock
Chamber |
06-34 |
November 10, 2006 |
REVISED:
Removal of
Flashboards; L/D No. 9,
Allegheny River, Mile 62.2 |
06-33 |
September 13, 2006 |
!! Cancelled!!
Lock and Dam 4, Monongahela River, Mile 41.5, 3-Day Closure
of the Single, 56-ft X 720-ft, Lock Chamber to Replace the Upstream Miter
Gates
|
06-32 |
August 23, 2006 |
Braddock L/D, Monongahela River, Mile 11.3, Two
8-hour Closures of 110'x 720' Lock Chamber |
06-31 |
August 17, 2006 |
New Cumberland L/D, Ohio River, Mile 54.3,
Repairs to the River Wall Emptying Valve in the 110' x 1200' River Lock
Chamber |
06-30 |
July 17, 2006 |
Locks 5, 6, 7 and 8,
Allegheny River, Additional Days and Hours of Operation |
06-29 |
July 17, 2006 |
Morgantown, Hildebrand, and
Opekiska L/D, Monongahela River, Additional Days and Hours of Operation |
06-28 |
July 13, 2006 |
Braddock L/D, Mile
11.3, Monongahela River, Two 8.5-Hour Closures |
06-27 |
July 13, 2006 |
Braddock Locks and Dam,
Monongahela River, Mile 11.3, Scheduled Closures of Main (110’x720’) Lock
Chamber |
06-26 |
June 26, 2006 |
Major League Baseball, All-Star Game Week
Security Zone near PNC Park, Allegheny River River Mile 0.25 (Ft. Duquesne
Bridge) to River Mile 0.70 (7th Street Bridge) |
06-25 |
June 8, 2006 |
Braddock Locks and
Dam, Monongahela River, Mile 11.3, Coordination of Lockages with
Construction Activities In Upstream Approach to Lock |
06-24 |
June 2, 2006 |
Emergency Dam Stabilization, Locks and Dam 3, Monongahela
River, Mile 23.8 |
06-23 |
May 30, 2006 |
Pennsylvania Turnpike
Highway Bridge River Bottom Inspection, Allegheny River, River Mile 14.14 |
06-22 |
May 15, 2006 |
Locks and Dam 3, Monongahela
River, Mile 23.8, 39-Day Closure of the 56’ x 720’ Land Lock Chamber to
Dewater the Chamber and Renovate the Filling and Emptying Valves |
06-21 |
April 26 |
Hildebrand Lock and Dam
5 Day Closure of Small Chamber |
06-20 |
April 26 |
Hildebrand Lock and Dam
Cancellation of 32 Day Closure - Small Chamber |
06-19 |
April 24 |
Installation of Flashboards
Lock & Dam 9, Allegheny River, Mile 62.2 |
06-18 |
April 19 |
Dam Warning Buoys - Allegheny,
Monongahela, and Ohio Rivers
|
06-17 |
April 5, 2006 |
Revised Schedule
of Operations Monongahela River Locks |
06-16 |
April 3, 2006 |
Schedule of Operations Allegheny
River |
06-15 |
March 31, 2006 |
Schedule of Operations
Monongahela River |
06-09 |
March 29, 2006 |
Fort Duquesne Highway Bridge Inspection,
Allegheny River, River Mile 0.25 |
06-08 |
March 3, 2006 |
Hildebrand L/D, Monongahela River, Mile 108.0, 32-Day Closure
of the Single 84' x 600' Lock Chamber, Repair Lock Gates, Sills and
Anchorages |
06-07 |
February 22, 2006 |
Installation of Mooring Cells By C&C Marine Maintenance
Company, Ohio River, Right and Left Banks, Mile 38.05 |
06-06 |
February 6, 2006 |
Emsworth Locks and Dam, Ohio River, Mile 6.2, 5-Day Closure
of the Large 110' x 600' Lock Chamber |
06-05 |
January 26,
2006 |
Montgomery Locks and Dam, Ohio River, Mile 31.7, Repair Operating Machinery on the Land Wall
Emptying Valve |
06-04 |
January 26,
2006 |
Montgomery Locks and Dam, Ohio River, Mile 31.73-Day
, Closure of the Large 110-ft x 600-ft Lock Chamber, Repair Upstream Lock
Gates |
06-03 |
January 17, 2006 |
Repair/Maintenance Schedule for 2006
|
06-02 |
January 13, 2006 |
Marion County
Highway Bridge Demolition, Monongahela River, River Mile 127.1 |
06-01 |
January 6, 2006 |
Dashields L/D, Ohio River, Mile 13.3, 10-Day Closure of the
Large 110' x 600' Lock Chamber Repair Downstream Lock Gate Anchorages |
05-43 |
December 23, 2005 |
Drilling Project, Mile 11.9, Monongahela River |
05-42 |
December 14, 2005 |
Operation Fleet Sweep, Monongahela, Allegheny, and Ohio
Rivers |
05-41 |
December 7, 2005 |
Special Barge Unloading Operations, Ohio River, Left Bank, Mile 30.5 |
05-39 |
November
4, 2005 |
Captina Bank Stabilization and Restoration, Ohio River, Left
Bank, Mile 107.7, Marshall County, WV |
05-38 |
November
2, 2005 |
Emergency Repairs to Lock Gates in 110' x 1200' Lock Chamber
and Replace Land Wall Emptying Valve in the 110' x 600' Land Lock Chamber at
Hannibal L/D, Ohio River, Mile 126.4 |
05-37 |
October
19, 2005 |
Maintenance Dredging in the Downstream Lock Approach at New
Cumberland L/D, Ohio River, Mile 54.3; Pike Island L/D, Ohio River, Mile
84.4; and Hannibal L/D, Ohio River, Mile 126.4 |
05-36 |
October
14, 2005 |
Winter Season Lock Closings and Schedule of Lock Operation
for Monongahela River |
05-35 |
October
14, 2005 |
L/D 4, Monongahela River, Mile 41.5, 3-Day Closure of the
Single, 56' x 720' Lock Chamber to Replace the Downstream Gates |
05-34 |
October
14, 2005 |
Removal of Small Boat Warning Signs and Buoys on the
Allegheny, Monongahela and Ohio Rivers |
05-33 |
October
13, 2005 |
Schedule of Operations at Allegheny River Locks |
05-32 |
October
13, 2005 |
Hannibal Locks and Dam, Ohio River, Mile 126.4 - Replace Land Wall Emptying
Valve in the 110' x 600' Land Lock Chamber & Repair Gates in the
110' x 1200' Lock Chamber |
05-31 |
September
27, 2005 |
Emergency Underwater Utility Line Repairs, Monongahela River,
Mile 80.2 |
05-30 |
September
19, 2005 |
Removal of Flashboards L/D No. 9, Allegheny River, Mile 62.2 |
05-29 |
September
16, 2005 |
Hannibal Locks and Dam, Ohio River, Mile 126.4 - Emergency Closing of the
110' x 1200' River Lock Chamber |
05-28 |
September
14, 2005 |
Maintenance Dredging of the Navigation Channel, Monongahela
River, Mile 19.6 |
05-27 |
September 8, 2005 |
Ohio River Lock
Chamber Fish Surveys |
05-26 |
September 8, 2005 |
Pike Island L/D
Repairs, Ohio River, Mile 84.2 |
05-25 |
August 11, 2005 |
Hannibal L/D, Ohio River, Mile
126.4; Repairs to Land Lock Chamber |
05-24 |
July 29, 2005 |
L/D 3, Monongahela River, Mile
23.8, 8 Hour Lock Closures for Repairs |
05-23 |
July 15, 2005 |
Dismantle Pipeline on Port Perry
Railroad Bridge Above Lock 2, Mile 11.7, Monongahela River |
05-22 |
July 8, 2005 |
Pike Island L/D, Ohio River, Mile
84.2, Repairs to River Lock Chamber |
05-21 |
July 8, 2005 |
Junior Bassmasters Priority
Lockage Hours at Lock 7 and Extended Lock Hours at Locks 5-9, Allegheny
River |
05-20 |
July 8, 2005 |
Bassmasters Priority Lockage
Hours During Bassmaster Classic |
05-19 |
July 1, 2005 |
Low River Flows in the Pittsburgh
District |
05-18 |
June 30, 2005 |
Allegheny River, Locks 6 & 7,
Additional Hours of Operation |
05-17 |
June 30, 2005 |
Hildebrand and Opekiska L/D,
Monongahela River, Additional Hours of Operation |
05-16 |
June 20, 2005 |
New Cumberland L/D, Ohio River,
Mile 54.3, Drilling and Sampling |
05-15 |
June 20, 2005 |
Hannibal L/D, Ohio River, Mile
126.4, Drilling and Sampling |
05-14 |
June 20, 2005 |
Pike Island L/D, Ohio River, Mile
84.2, Drilling and Sampling |
05-13 |
June 20, 2005 |
Peters Creek, Monongahela River,
Mile 19.6, Drilling and Sampling |
05-12 |
June 6, 2005 |
New Cumberland L/D, Ohio River,
Mile 54.3, Closure of the Small 110' x 600' Lock Chamber |
05-11 |
May 18, 2005 |
Painting Pipeline on Port Perry
Railroad Bridge, Mile 11.7, Monongahela River |
05-10 |
May 6, 2005 |
Installation of Flashboards, L/D
9, Allegheny River, Mile 62.2 |
05-09 |
May 2, 2005 |
New Cumberland L/D, Ohio River,
Mile 54.3, Temporary Closure of the 110' x 600' Lock Chamber for Repairs |
05-08 |
April 19, 2005 |
Installation of Flashboards on
L/D 9, Allegheny River, Mile 62.2 |
05-07 |
April 12, 2005 |
Dam Warning Buoys; Allegheny,
Monongahela, and Ohio Rivers |
05-06 |
March 24, 2005 |
Revised Schedule of Operations
for the Allegheny River Locks |
05-05 |
March 21, 2005 |
Schedule of Operations on the
Allegheny River |
05-04 |
March 21, 2005 |
Schedule of Operations on the
Monongahela River |
05-03 |
March 2, 2005 |
New Cumberland L/D, Ohio River,
Mile 54.4, Emergency Closure of 110' x 1200' River Lock Chamber |
05-02 |
February 28,
2005 |
Maxwell L/D, Monongahela River,
Mile 61.2, 45- Day Closure of the 84' x 720' River Lock Chamber |
05-01 |
February 3,
2005 |
Point Marion L/D, Monongahela
River, Mile 90.8, 14 Day Closure of the Single 84' x 720' Lock Chamber
Repair Lock Gates, Sills, and Miter Block Seals |
04-56 |
November18,
2004 |
Sunken Motor Vessel Chickasaw
Mile 0.0, Left Descending Bank, Ohio River |
04-54 |
December 22,
2004 |
Repair/Maintenance Schedule for 2005 |
04-53 |
November 15,
2004 |
Monongahela
River, Schedule of Winter Lock Operations and Seasonal Lock Closings |
04-52 |
November 10,
2004 |
L/D 5,
Allegheny River, Mile 30.4, 3-Day Closure of the Single, 56' x 360' Lock
Chamber |
04-51 |
November 9,
2004 |
Seasonal Lock
Closings and Winter Schedule of Lock Operation for Monongahela River |
04-50 |
October 29,
2004 |
Hannibal L/D,
Ohio River, Mile 126.4, Repairs to 110' x 1200' River Lock Chamber |
04-49 |
October 4, 2004 |
L/D 4,
Monongahela River, Mile 41.5, Mooring of Vessels on the Land Wall |
04-48 |
September 29,
2004 |
Seasonal Lock
Closings, Locks 5 and 6, Allegheny River |
04-47 |
September 16,
2004 |
Removal of
Small Boat Warning Signs and Buoys on the Allegheny, Monongahela and Ohio
Rivers |
04-46 |
September 16,
2004 |
Schedule of
Operations for Allegheny River Locks |
04-45 |
September 10,
2004 |
Warning to
Recreational Boaters |
04-44 |
September 15,
2004 |
Hannibal L/D,
Ohio River, Mile 126.4, Repairs to River Lock Chamber |
04-43 |
September 8,
2004 |
New Cumberland
L/D, Ohio River Mile, 54.3, Repairs to the Land Wall Emptying Valve in the
110' x 600' Land Lock Chamber |
04-42 |
August 24, 2004 |
Temporary Dock
Placement on the Ohio River, Mile 90.5 for the Sternwheeler Festival |
04-41 |
August 13, 2004 |
Lock Chamber
Fish Sampling, Ohio River |
04-40 |
August 9, 2004 |
Operations of
Locks 5 thru 9, Allegheny River for September 10, 11, 12, and 18, 2004 |
04-39 |
July 21, 2004 |
Maintenance
Dredging, Ohio River, Mile 111 |
04-38 |
July 19, 2004 |
Availability of
Navigation Charts |
04-37 |
July 12, 2004 |
Emsworth L/D,
Ohio River, Mile 6.2, 32-Day Closure of the 56' x 360' River Lock Chamber,
105' Tow Width Restriction to 110' x 600' Land Lock Chamber |
04-36 |
July 9, 2004 |
8-Hour Lock
Closure at Hannibal L/D, Mile 126.4, Ohio River |
04-35 |
June 9, 2004 |
C.W. Bill Young
L/D, Allegheny River, Mile 14.5, Replace River Wall Emptying Valve and
Renovate Operating Machinery in the Single 56' x 360' Lock Chamber |
04-34 |
June 9, 2004 |
Temporary
Barges, Monongahela River, Right Bank, Mile 10.7 |
04-33 |
June 7, 2004 |
Montgomery
Locks and Dam, Ohio River, Mile 31.7, 26- Day Closure of the Small 56' x
360' River Lock Chamber |
04-32 |
May 24, 2004 |
Warning to Recreational Boaters |
04-31 |
May 24, 2004 |
Installation of Flashboards L/D 9, Allegheny River, Mile 62.2 |
04-30 |
May 19, 2004 |
Elimination of Haulage Assisted Triple Lockages on the Allegheny River |
04-29 |
May 14, 2004 |
Installation of Pipeline on Port Perry Railroad Bridge Above Lock 2, Mile
11.7, Monongahela River |
04-28 |
May 13, 2004 |
Installation of Flashboards at L/D 9, Allegheny River, Mile 62.2 |
04-27 |
May 13, 2004 |
Survey Activities and Geotechnical Investigations in Ohio River, Mile 112 |
04-26 |
May 11, 2004 |
Principal Data Sheet - Navigation Locks and Dams for the Pittsburgh District |
04-25 |
May 11, 2004 |
L/D 2, Monongahela River, Mile 11.2, New Interim Normal Upper Pool |
04-24 |
April 30, 2004 |
Installation of Flashboards L/D 9, Allegheny River, Mile 62.2 |
04-23 |
April 29, 2004 |
Bathymetric Survey on Ohio River, Mile 112 |
04-22 |
April 22, 2004 |
Dam Warning Buoys Allegheny, Monongahela, and Ohio Rivers |
04-21 |
April 22, 2004 |
Core Drilling from Barge on Ohio River, Mile 50 |
04-20 |
April 19, 2004 |
Installation of Flashboards, L/D 9, Allegheny River, Mile 62.2 |
04-19 |
April 1, 2004 |
Morgantown L/D, Monongahela River, Mile 102.0, Replace River Wall Filling
Valve and Renovate Operating Machinery Revised Starting and Completion Date |
04-18 |
April 1, 2004 |
Opekiska L/D, Monongahela River, Mile 115.4, 8-hour Closure of 84' x 600'
Lock Chamber to Inspect and Repair the Upstream Emergency Bulkheads AND
25-Day Closure of the Single 84' x 600' Lock Chamber to Repair Downstream
Lock Gates, Sill, and Miter Blocks |
04-17 |
April 1, 2004 |
Hildebrand L/D, Monongahela River, Mile 108.0, Cancellation of Maintenance
Closures of 84' x 600' Lock Chamber |
04-16 |
March 30, 2004 |
L/D 4, Monongahela River, Mile 41.5, Permanent Closure of River Lock Chamber
and 24-Hour Closures of Land Lock Chamber |
04-15 |
March 26, 2004 |
Schedule of Lock Operation, Monongahela River |
04-14 |
March 23, 2004 |
Construction Activities on Fort Duquesne Bridge, Allegheny River, Mile 0.2 |
04-13 |
March 16, 2004 |
Revised L/D 2, Monongahela River, Mile 11.2, Removal of Existing Fixed Crest
Dam |
04-12 |
March 16, 2004 |
Schedule of Operations for Allegheny River Locks |
04-11 |
March 12, 2004 |
Hildebrand L/D, Monongahela River, Mile 108.0, 25-Day Lock Closure of the
Single 84' x 600' Lock Chamber, Repair Lock Gates, Sills and Floating
Mooring Bitts |
04-10 |
March 2, 2004 |
Locks and Dam 2, Monongahela River, Mile 11.2, Removal of Existing Fixed
Crest Dam |
04-09 |
February18,
2004 |
Hildebrand L/D, Monongahela River, Mile 108.0 8-Hour Closure of Single 84' x
600' Lock Chamber to Inspect and Repair the Upstream Emergency Bulkhead |
04-08 |
February 18,
2004 |
Bulkheads Removed from Land Lock Chamber at New Cumberland L/D, Mile 54.4,
Ohio River and Hannibal L/D, Mile 126.4, Ohio River |
04-07 |
February
5, 2004 |
Bulkheads Set For Ice Skimming at Hannibal L/D, Mile 126.4, Ohio River |
04-06 |
February 2,
2004 |
Bulkheads Set For Ice Skimming at New Cumberland L/D, Mile 54.4, Ohio River |
04-05 |
January 23,
2004 |
Morgantown L/D, Monongahela River, Mile 102.0, Replace Land Wall Filling
Valve and Renovate Operating Machinery |
04-04 |
January 20,
2004 |
Dashields L/D, Ohio River, Mile 13.3, Repair Upstream Miter Gate in 110' x
600' Lock Chamber |
04-03 |
January 16,
2004 |
Dashields L/D, Ohio River, Mile 13.3, Renovations for 110' x 600' Lock
Chamber |
04-02 |
January 16,
2004 |
Hildebrand L/D, Monongahela River, Mile 108.0, Maintenance Dredging Lock
Chamber and Upstream Approach |
04-01 |
January 5, 2004 |
Bulkheads Set for Skimming of Debris at Hannibal L/D |
03-57 |
December 16,
2003 |
Principal Data Sheet - Navigation Locks and Dams for the Pittsburgh District |
03-56 |
December 8,
2003 |
Repair/Maintenance Schedule for 2004 |
03-19 |
May 5, 2003 |
Availability of Navigation Charts |
03-01 |
January 16,
2003 |
New Cumberland L/D, Ohio River, Mile 54.4, Service Bridge Lift Span is Out
of Operation |
02-32 |
June 26, 2002 |
Pike Island
Locks and Dam, Ohio River Damaged Mooring Cell at Ohio River Mile 83.2 |