Kathy Gately
CESWF-OD-WA
U.S. Army Corps of Engineers
Fort Worth District
3801 Zoo Park Road
Waco, Texas 76708
Phone: 254-756-5359
The documents on this page require the Adobe PDF Reader. Click here to download the reader.
The original master plan for Waco Lake (Brazos River Basin, Texas, Design Memorandum No.10B, Master Plan for Waco Reservoir, Bosque River, Texas) was approved in 1962. In February 1970, the master plan was updated (Brazos River Basin, Texas, Design Memorandum No.10C, Updated Master Plan for Waco Reservoir, Bosque River, Texas) and approved in September 1970. Since 1970, considerable changes have occurred regarding Corps management and stewardship philosophies and the Corps Master Planning requirements concerning land classification.
In 2003, the Waco Lake Pool Raise permanently raised the conservation pool elevation from 455 to 462 feet National Geodetic Vertical Datum (NGVD) and increased the surface acreage of the conservation pool from approximately 7,200 to 8,900 acres. A total of 47,500 acre-feet of flood control storage was re-allocated to water supply storage as a result. Prior to the pool raise, an environmental assessment was completed in May 2000 and a Finding of No Significant Impact (FONSI) was signed by the District Commander on 27 July 2000. In August 2003, the Supplemental Environmental Assessment (SEA) was published and the FONSI was replaced with a mitigated FONSI, signed by the District Engineer on August 17, 2003, to incorporate changes that were made to the Mitigation Plan since the signing of the original FONSI. Detailed information regarding mitigation land and its operations and maintenance may be found in the Mitigation and Operations and Maintenance Plan for the Waco Lake Pool Raise (Appendix B). Other information related to the pool raise, including hydrology and geotechnical considerations of the project are contained in the Waco Lake Pool Raise Design Report, dated April 2001.
- Waco Lake Master Plan Supplement
- Plates
- Plate 0 - Park Plate Master
- Plate 1 - Airport Total
- Plate 2 - Airport Beach
- Plate 3 - Airport 1
- Plate 4 - Airport 2
- Plate 5 - Airport Entrance
- Plate 6 - Airport Flatrock
- Plate 7 - Harbour Texas Marina
- Plate 8 - Speegleville Park
- Plate 9 - Speegleville Camp
- Plate 10 - Reynolds Total
- Plate 11 - Reynolds 1
- Plate 12 - Reynolds 2
- Plate 13 - Lacy
- Plate 14 - Lacy Boatramp
- Plate 15 - Twin Total
- Plate 16 - Twin Day Use
- Plate 17 - Twin Waco Outgrant
- Plate 18 - Midway Total
- Plate 19 - Midway Zoom
- Plate 20 - Koehne
- Plate 21 - Bosque Total
- Plate 22 - Bosque Park
- Plate 23 - Bosque Soccer
- Plate 24 - Hike and Bike
- Plate 25 - Woodway Total
- Plate 26 - Waco Marina
- Plate 27 - Yacht
- Plate 28 - Land Class Final Master
- Plate 29 - Land Class Final Mitigation
- Plate 30 - Land Class Final Mitigation North
- Plate 31 - Land Class Final Mitigation South
- Plate 32 - Land Class Final ESA
- Plate 33 - Land Class Final North Bosque
- Plate 34 - Land Class Final Airport ESA
- Plate 35 - Land Class Final Bosque ESA
- Plate 36 - Land Class Final East Shoreline ESA
- Plate 37 - Land Class Final South Bosque River ESA
- Plate 38 - Land Class Final Reynolds Speegleville ESA
- Plate 39 - Land Class Final Multiple Project Operations
- Plate 40 - Land Class Final Multiple Project Operations North
- Plate 41 - Land Class Final Multiple Project Operations South
- Plate 42 - Utilility Corridor Final
- Plate 43 - Utilility Corridor Final North
- Plate 44 - Utilility Corridor Final South