The Corps of Engineer's Regulatory Guidance Letter 3 August 2006, Minimum Monitoring Requirements for Compensatory Mitigation Projects Involving the Creation, Restoration, and/or Enhancement of Aquatic Resources outlines minimum monitoring requirements to ensure projects designed to replace lost wetlands are meeting their goals. The guidance outlines standardized procedures, time frames, and standards that managers need to follow in submitting annual monitoring reports for projects designed to mitigate wetlands lost to dredging and filling activities permitted under Section 404 of the Clean Water Act.