Table of Contents header. U.S. Department of Transportation

Budget in Brief Table of Contents | DOT.gov

U.S. Department of Transportation
Fiscal Year 2009 Budget In Brief

FEDERAL TRANSIT ADMINISTRATION

Overview: The Federal Transit Administration (FTA) provides leadership, technical assistance, and financial resources for safe, technologically advanced public transportation that enhances mobility and accessibility, reduces congestion, improves America’s communities, preserves the natural environment, advances economic growth, and ensures that transit systems are prepared to function during and after criminal or terrorist attacks. Transit systems safely and efficiently move tens of millions of people every day connecting people to their jobs and communities. The FY 2009 budget request includes $10.1 billion for Federal transit programs, which maintains the Federal commitment to transit, and when combined with State and local funding, will reduce congestion, improve mobility and accessibility, address critical safety and security requirements, and advance the President’s Management Agenda.

Federal Transit Administration Budget
(Dollars in Millions)
  2007
Actual
2008
Enacted
2009
Request
Formula and Bus Grants 8,240 1/ 7,768 2/ 8,361
Capital Investment Grants 1,566 1,569 1,621
Formula Grants 35 3/ 0 0
Research & University Research Centers 61 65 60
Administrative Expenses 85 89 94
Total 9,987 9,492 10,135
1/ Includes $977 million in net flex funding transfers from FHWA.
2/ The FY 2008 obligation limitation is $7,768 million, accounting for the $105 million rescission of contract authority from the $7,873 million authorization level in SAFETEA-LU.
3/ Includes U.S. Troop Readiness, Veterans’ Care, Katrina Recovery, and Iraq Accountability Appropriations Act, 2007, Chapter 8 of Title IV - Additional Hurricane Disaster Relief and Recovery. Pub. L. 110-28.

Summary of FTA FY 2009 Increases and Decreases
(Dollars in Millions)
  Formula
and
Bus Grants
Capital
Investment
Grants
Research
&
URCs
Admin.
Expenses
Total
FY 2008 Base 7,768 1,569 65 89 9,492
Pay Inflation Adjustments 0 0 0 2 2
Non-Pay Inflation Adjustments 0 0 0 1 1
Annualization of FY 2008 Initiatives 0 0 0 0 0
Non-recurring Costs or Savings 0 0 0 0 0
Base Re-engineering, Reductions or Adjustments 593 52 -5 0 640
FY 2009 Current Services Levels 8,361 1,621 60 92 10,134
Program Initiatives 0 0 0 2 2
FY 2009 Request 8,361 1,621 60 94 10,135
FY 2009 Budget

In FY 2009, the Federal Transit Administration (FTA) requests $10.1 billion in budget authority, $644 million above the FY 2008 enacted level. This record level of funding will continue to provide stable, predictable formula funds to urbanized areas; significantly increase funding for underserved rural communities; honor multi-year funding commitments under the New Starts program; and improve services to the elderly, low income, and persons with disabilities through coordinated planning and predictable funding.

Formula and Bus Grants: FTA requests $8.4 billion for transit services, including security, planning, bus and railcar purchases and maintenance, facility repair and construction, and where eligible, operating expenses. The program includes grants specifically targeted to urbanized areas and, through States, to non-urbanized areas and to transportation providers that address the special transportation needs of the elderly, people with low incomes, and persons with disabilities. In addition, funds proposed for the Formula and Bus Grants program include $8.8 million to improve the accessibility of over-the-road buses, $25 million for alternatives analysis for projects, and $3.5 million for the National Transit Database. The following summary describes the major programs within this account:

Train station Train platform

Research and University Research: FTA requests $59.6 million for transit research programs. This includes $39 million for National Research and Technology Programs to develop solutions that improve public transportation, $9.3 million for the Transit Cooperative Research Program, $4.3 million for the National Transit Institute training programs, and $7 million for the University Centers Program. Approximately $44.7 million of this request contributes to the Department’s goal of reducing congestion. FTA also requests $3.3 million for the clean fuels and electric drive bus deployment (hybrid-electric) program to promote environmental stewardship by increasing the deployment of new low-emission technology.

Capital Investment Grants: $1.6 billion is proposed in FY 2009 for the construction of new fixed guideway and non-fixed guideway corridor systems, and extensions to existing systems. SAFETEA-LU expands the New Starts program to make new non-fixed guideway transportation corridor projects eligible for funding, and encourages project sponsors to consider cost-effective transit options that may not require a fixed guideway. The request fully funds the annual cost of existing and proposed Full Funding Grant Agreements (FFGAs), which are multi-year contractual agreements between FTA and grantees. These projects include commuter rail, light rail, heavy rail, and bus rapid transit. The “Small Starts” program, requested at $200 million, will fund existing and proposed projects that cost less than $250 million.

Transit Security: $48.3 million is requested to support transit security, which remains a high priority in FY 2009. Most transit security funding is in the Formula and Bus Grants account, including the one percent of Urbanized Formula Grant funding that is required to be spent on security initiatives. Through its technical assistance and other programs, FTA emphasizes security training for transit system employees, emergency preparedness and response, and public awareness efforts.

Project and Financial Management Oversight: To provide oversight of FTA grants, $80.6 million ($64 million from Formula and Bus Grants, $16.2 million from Capital Investment Grants, and $0.4 million from the National Research program) is requested in FY 2009. Project and financial management oversight are core management responsibilities of FTA and are essential to good stewardship of Federal taxpayers’ dollars.

Trolley bus

Federal Transit Administration
Proposed FY 2009 Section 5309 New Starts/Small Starts 1/
(Dollars in Millions)
A. Existing Full Funding Grant Agreements (FFGAs) FY 2009
Pres. Bud.
AZ Central Phoenix/East Valley Light Rail Phoenix 91.8
CA Metro Gold Line Eastside Extension Los Angeles 74.6
CO Southeast Corridor LRT Denver 1.0
DC Largo Metrorail Extension Washington 34.7
IL Ravenswood Line Extension Chicago 30.5
MN Northstar Corridor Rail Minneapolis-Big Lake 71.2
NJ Hudson-Bergen MOS-2 Northern NJ 1.1
NY Long Island Rail Road East Side Access New York 219.3
NY Second Avenue Subway Phase I New York 277.7
OR South Corridor I-205/Portland Mall LRT Portland 81.6
PA North Shore LRT Connector Pittsburgh 0.7
TX Northwest/Southeast LRT MOS Dallas 88.0
UT Weber County to Salt Lake City Commuter Rail Salt Lake City 81.6
VA Norfolk LRT Norfolk 57.1
WA Central Link Initial Segment Seattle 28.8
Subtotal Existing FFGAs 1,139.6
 
B. Pending Full Funding Grant Agreements
CO West Corridor LRT Denver 60.0
WA University Link LRT Extension Seattle 100.0
Subtotal Pending FFGAs 160.0
 
C. Final Design 85.0
 
D. Small Starts Project Development
AZ Mountain Links BRT Flagstaff 6.2
CA Livermore-Amador BRT Livermore 8.0
CA Metro Rapid Bus System Gap Closure Los Angeles 0.3
CA Wilshire Blvd Bus-Only Lane Los Angeles 10.9
CA Perris Valley Line Riverside 50.0
CA Mid-City Rapid San Diego 21.7
CO Mason Corridor BRT Fort Collins 11.2
MA Commuter Rail Improvements Fitchburg 30.0
MO Troost Corridor BRT Kansas City 0.1
OR Streetcar Loop Portland 50.0
OR Pioneer Parkway EmX BRT Springfield 0.3
WA Bellevue-Redmond BRT King County 11.0
WA Pacific Highway South BRT King County 0.3
Subtotal Small Starts 200.0
 
E. Other Funding
Oversight Activities (1%) 16.2
Ferry Capital Projects (AK or HI) 15.0
Denali Commission 5.0
 
GRAND TOTAL 1,620.8
1/ Totals may not add due to rounding.