GENERAL DECISION: OH20080035 12/05/2008 OH35 Date: December 5, 2008 General Decision Number: OH20080035 12/05/2008 Superseded General Decision Number: OH20070035 State: Ohio Construction Type: Building County: Ashtabula County in Ohio. BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 02/08/2008 1 06/06/2008 2 07/04/2008 3 08/01/2008 4 11/07/2008 5 12/05/2008 BOIL0744-008 07/01/2008 Rates Fringes BOILERMAKER......................$ 35.34 17.48 ---------------------------------------------------------------- BROH0016-003 10/01/2008 Rates Fringes BRICKLAYER.......................$ 29.11 10.88 ---------------------------------------------------------------- CARP0254-005 05/01/2008 Rates Fringes CARPENTER (Including concrete forms; Excluding metal building erection and overhead door installation)......$ 29.50 11.17 ---------------------------------------------------------------- * ELEC0573-001 12/01/2008 Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships Rates Fringes ELECTRICIAN Excluding Phone Line Installation................$ 30.00 12.40 ---------------------------------------------------------------- ELEC0673-001 06/02/2008 Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships Rates Fringes Electricians: (Excluding Phone Line Installation) Cable splicer...............$ 30.15 15.00 Electrician.................$ 29.90 15.00 ---------------------------------------------------------------- IRON0017-007 08/01/2008 North of Route #6, starting at the Geauga County line, proceeding east to State Route 45 Rates Fringes IRONWORKER Structural, excluding metal building erection, & REINFORCING.................$ 28.35 17.83 ---------------------------------------------------------------- IRON0207-002 06/01/2008 LAWRENCE, MERCER, AND VENANGO COUNTIES Rates Fringes IRONWORKER.......................$ 26.31 16.03 ---------------------------------------------------------------- IRON0348-005 08/01/2003 ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships) Rates Fringes IRONWORKER Structural, excluding metal building erection & Reinforcing.................$ 22.17 13.35 ---------------------------------------------------------------- PLUM0055-001 05/01/2008 Rates Fringes PLUMBER Work on Water Lines, Gas Lines, Sewer Lines, etc. from the building to the street......................$ 21.57 7.78 All Other Work - Excluding HVAC........................$ 31.50 17.75 ---------------------------------------------------------------- PLUM0120-006 05/01/2008 Rates Fringes PIPEFITTER Including HVAC Work.........$ 33.17 16.10 ---------------------------------------------------------------- ROOF0044-002 05/01/2008 Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 26.95 14.30 ---------------------------------------------------------------- SHEE0033-028 05/01/2008 Rates Fringes Sheet Metal Mechanic HVAC Duct & Siding and Decking Work Only...........$ 32.51 14.34 ---------------------------------------------------------------- SUOH2001-005 03/09/2001 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 15.01 IRONWORKER Metal Building Erection Only........................$ 16.26 Laborer, Unskilled...............$ 14.95 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION