GENERAL DECISION: PA20080029 10/10/2008 PA29 Date: October 10, 2008 General Decision Number: PA20080029 10/10/2008 Superseded General Decision Number: PA20070029 State: Pennsylvania Construction Type: Building County: Monroe County in Pennsylvania. INCLUDING TOBYHANNA ARMY DEPOT BUILDING AND FOUNDATION CONSTRUCTION PROJECTS, BUILDING ERECTION AND FOUNDATION EXCAVATION PROJECTS, (does consisting of single family homes and apartments up to and including 4 stories), EXCLUDING SEWAGE AND WATER TREATMENT PLANT PROJECTS Modification Number Publication Date 0 02/08/2008 1 03/21/2008 2 06/20/2008 3 06/27/2008 4 07/18/2008 5 08/08/2008 6 09/19/2008 7 10/10/2008 BRPA0005-024 04/30/2008 Tobyhanna Depot Rates Fringes BRICKLAYER.......................$ 27.99 13.15 ---------------------------------------------------------------- BRPA0005-041 05/04/2008 EXCEPT TOBYHANNA Rates Fringes BRICKLAYER.......................$ 27.99 13.15 ---------------------------------------------------------------- CARP0261-007 06/01/2008 Rates Fringes CARPENTER (Including Drywall Hanging and Metal Stud Installation)....................$ 24.90 9.55 ---------------------------------------------------------------- ELEC0081-008 06/01/2008 BARRETT, COOLBAUGH, PARADISE & PRICE TOWNSHIPS Rates Fringes ELECTRICIAN......................$ 27.97 18.11 ---------------------------------------------------------------- ELEC0102-011 06/02/2008 REMAINDER OF COUNTY Rates Fringes ELECTRICIAN......................$ 45.52 23.22 ---------------------------------------------------------------- IRON0036-007 07/01/2008 REMAINDER OF COUNTY Rates Fringes Ironworkers: Projects over 25 million....$ 30.80 29.03 Projects under 25 milion....$ 30.30 29.03 ---------------------------------------------------------------- * IRON0489-003 07/01/2008 TOBYHANNA ARMY DEPOT Rates Fringes IRONWORKER, STRUCTURAL...........$ 28.57 22.25 ---------------------------------------------------------------- LABO1174-002 05/01/2008 Rates Fringes Laborers: Brick Mason Tenders.........$ 23.40 11.13 Unskilled...................$ 22.05 11.13 ---------------------------------------------------------------- PLUM0524-001 06/01/2008 Rates Fringes Plumbers and Pipefitters (Including HVAC pipe work)......$ 35.00 15.51 ---------------------------------------------------------------- SHEE0044-007 05/01/2007 Rates Fringes Sheet metal worker (Including HVAC Duct Work).................$ 26.50 14.64 ---------------------------------------------------------------- SUPA1999-003 08/10/1999 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 17.13 1.57 Painters: Brush & Roller..............$ 15.00 Spray.......................$ 16.00 Power equipment operators: Backhoe.....................$ 22.20 6.14 Bulldozer...................$ 22.70 6.14 Loader, Roller..............$ 26.05 2.10 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). ---------------------------------------------------------------- In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION