The operationally available capacity posted is an estimate of available capacity for
the gas day and cycle referenced. Due to the dynamic nature of the pipeline operations,
these capacities are subject to change without notice. Accordingly, there are no guarantees
expressed or implied that these capacities will be available for service. The operational
capacity may be limited by group and/or point constraints. Further, depending on the receipt
and delivery point combinations nominated and scheduled, the operational capacity may be
less than the design capacity and greater or less than the long-term sustainable capacity.
Because of the grid nature of Northern�s pipeline system, the operating conditions of the
pipeline and the specific receipt and delivery points nominated and scheduled Northern
may schedule quantities that are greater than the operationally available capacity posted
for the nomination cycle.
Due to storage field operational considerations, the "Storage Injections/Withdrawals
Nominations Group" may list operational capacity less than the contracted firm entitlement.
However, in such instances, firm nominations will be scheduled regardless of
the operational capacity posted, except in the instance of a force majeure or an outage.
For more specific storage availability see Northern's
Capacity > Storage.
Location scheduled quantities represent timely cycle volumes for the Oakland and Ogden groups
including operational requirements.
*The combination of TBPL, REX and Northern's Field to Demarc points are constrained by the
Demarc Group capacity.
The Demarc Group includes both receipt and delivery activities for allocation purposes;
therefore, the LocQty & LocPurp fields are blank.
|