HOMEPAGE   WHO WE ARE   MISSIONS   HISTORY RELATED LINKS
USACE Sacramento District Photo Sacramento District Relevant, Ready, Responsive, Reliable


Sacramento River Bank Protection Project

All documents are in PDF Format.
Download a free Adobe Acrobat Reader.


TO ALL INTERESTED PARTIES:

13 Critical Erosion Sites
Sacramento River at river miles (RM) 16.8L, 42.7R, 49.7R, 52.3L, 53.5R, 55.2L, 77.2L, and 177.8R.
Lower American River at RM 0.3L and 2.8L.
Feather River at RM 28.5R.
Steamboat Slough at RM 16.6R
Cache Slough at RM 21.8R
Public Meeting 29 May 2008
View PDF 1.8mb

Availabiltiy of Final EA/IS Letter to Public WO Enclosure (PDF format 70KB)-- The public review period for the draft EA ended on June 9, 2008. All comments received on the draft EA/IS were incorporated into the final document, as appropriate. Construction is anticipated to begin in July 2008 and be completed by the end of November 2008.

* Finding Of No Significant Impact (PDF format 82KB)
* Final Environmental Assessment/Initial Study (PDF format 2MB)
* Final Environmental Assessment/Initial Study Appendices:
--Appendix Cover
--Appendix A(2) Xsections
--Appendix C Figures:
---- Fig C-1
---- Fig C-2
---- Fig C-3
---- Fig C-4
---- Fig C-5
---- Fig C-6
---- Fig C-7
-------Fig C-7a
---- Fig C-8
---- Fig C-9
-------Fig C-9a
---- Fig C-10
---- Fig C-11
---- Fig C-12
---- Fig C-13
--Appendix B Photographs
--Appendix D Tree Survey
--Appendix E Plants
--Appendix F Wildlife
--Appendix G Special Status Species
--Appendix H Elderberry
--Appendix I SAM
--Appendix J 401
--Appendix K 404
--Appendix L Air Quality Modeling Results
--Appendix M Response to Public Comments on Draft EA/IS

* Proposed Mitigated Negative Declaration (PDF format 30KB)

 

TO ALL INTERESTED PARTIES:

Lower American River Mile 0.5 Mitigation Site Sacramento River Bank Protection Project

  • Complete Lower American River Draft EAIS with FONSI  --  Dec. 12 2007
  • All Interested Parties Letter



    14 Critical Erosion Sites(Sacramento River at river miles (RM) 16.9L, 33.0R, 33.3R, 43.7R, 44.7R, 47.0L, 47.9R, 48.2R, 62.5R, 68.9L, and 78.0L.  Three critically eroding sites are along Steamboat Slough at RM 19.0R, 19.4R, and 22.7R.)

    Availability of Final EA letter to Public WO Enclosure -- The public review period for the draft EA ended on Dec 15, 2006. All comments received by that date have been addressed and incorporated into the final document, as appropriate. The EA and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in January 2007 and be completed by the end of November 2007.


    5 Critical Erosion Sites (River Miles 26.9, 34.5, 72.2, 99.3, and 123.5)

    Availability of Final EAIS letter to Public WO Enclosure -- The public review period for the draft EA/IS ended on June 5, 2006. All comments received by that date were addressed and incorporated into the final document, as appropriate. The final EA/IS and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in July 2006 and be completed by the end of November 2006.


    Pocket Erosion Sites (River Miles 49.6, 49.9, 50.2, 50.4, 50.8, 51.5, 52.4, and 53.1)

    Availability of Final EAIS letter to Public WO Enclosure -- The public review period for the draft EA/IS ended on May 7, 2006. All comments received by that date were addressed and incorporated into the final document, as appropriate. The final EA/IS and FONSI have been prepared in accordance with National Environmental Policy Act guidelines. Construction is anticipated to begin in July 2006 and be completed by the end of November 2006.

  •  

     

     

    Top of Page

    USACE Website Location. USACE Sacramento District USACE Home Page USACE South Pacific Division
    How to submit a Freedom of Information Act (FOIA) request
    Privacy and Security Notice

    Points of Contact:
    Public Affairs Office: CESPK-PA spk-pao@usace.army.mil
    Contact Us

    US Army Corps of Engineers, Sacramento District Home Page