Combined License Applications for New Reactors
Location of Projected New Nuclear Power Reactors
Applications Received
Bell Bend Unit 1
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
Nine Mile Point Unit 3
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Virgil C. Summer Nuclear Site, Units 2 and 3 Application

Virgil C. Summer Nuclear Site
Who:   South Carolina Electric & Gas (SCE&G)

What:   Application for a combined license (COL) for two Westinghouse Advanced Passive 1000 (AP1000) Pressurized Water Reactors (PWR) designated as V.C. Summer Nuclear Station Units 2 and 3.

When:   March 27, 2008 (date of application submittal)

Where:  

SCE&G's V.C. Summer Nuclear Station site near Fairfield County, South Carolina

On this page:

Some links on this page are to documents in our our Agencywide Documents Access and Management System (ADAMS). For additional information, see our Plugins, Viewers, and Other Tools.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Date Description
03/27/08 SCE&G's transmittal letter for Virgil C. Summer Nuclear Station Units 2 & 3 COLA
  • Part 0 - Cover Letter, Affidavits
  • Part 1 - Administrative and Financial Information
  • Part 2 - Final Safety Analysis Report (FSAR)
  • Part 3 - Environmental Report
  • Part 4 - Technical Specifications
  • Part 5 - Emergency Plan
  • Part 6 - [Not Used. Reserved for applicants requesting Limited Work Authorization (LWA)]
  • Part 7 - Departure and Exemption Requests
  • Part 8 - [This Part contains safeguards information which is with-held from public availability]
  • Part 9 - [This Part contains other information which is with-held from public availability]
  • Part 10 - Licensee Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITTAC)
  • Part 11 - COLA Enclosure 1
  • Part 12 - COLA Enclosure 2
  • Part 13 - COLA Enclosure 3

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 03/27/08 - A
Acceptance Review
Acceptance Review Start
06/02/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
07/31/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
09/26/08 - A
Safety Review
Phase 1 - Requests for Additional Information (RAIs) and Supplemental RAIs
09/10/09 - T
Phase 2 - Advance Final safety evaluation report (SER) without Open Items
08/13/10 - T
Phase 3 - ACRS Review of Advance Final SER
12/27/10 - T
Phase 4 - Final SER
02/18/11 - T
Environmental Review
Phase 1 - Scoping
06/24/09 - T
Phase 2 - Draft Environmental Impact Statement (DEIS)
03/24/10 - T
Phase 3 - DEIS Comment Period
08/24/10 - T
Phase 4 - Final Environmental Impact Statement
02/03/11 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found on the Hearing Opportunities page.

To top of page

NRC Documents

Date Description
10/10/08 Notice of Hearing and Petition for Leave to Intervene
07/31/08 Notification of Docketing and Federal Register Notice
06/26/08 Acknowledgment of Receipt of Application and Federal Register Notice

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 09/04/08 RAI Letter No. 1 SRP Section 2.5.2 10/02/08
09/19/08 RAI Letter No. 2 SRP Section 2.5.2 10/17/08
10/23/08 RAI Letter No. 3 SRP Section 15.00.03 11/19/08 - Non-Public
11/18/08 RAI Letter No. 4 SRP Section 07.05  
12/01/08 RAI Letter No. 5 SRP Section 09.05.01  
12/01/08 RAI Letter No. 6 SRP Section 09.05.01  
12/02/08 RAI Letter No. 7 SRP Section 13.3  

To top of page

Public Meetings

Date Description
06/12/08 Site Orientation Meeting
08/28/07 Public Outreach

To top of page

Contacts

Contacts for the Virgil C. Summer Nuclear Site COL Application
Safety Project Manager Ravindra Joshi
Environmental Project Manager Mark Notich
Contact a Public Affairs Officer