Title 10--Energy

CHAPTER I--NUCLEAR REGULATORY COMMISSION (CONTINUED)

PART 63--DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA


TEXT PDF63.1 Purpose and scope.
TEXT PDF63.2 Definitions.
TEXT PDF63.3 License required.
TEXT PDF63.4 Communications and records.
TEXT PDF63.5 Interpretations.
TEXT PDF63.6 Exemptions.
TEXT PDF63.7 License not required for certain preliminary activities.
TEXT PDF63.8 Information collection requirements: OMB approval.
TEXT PDF63.9 Employee protection.
TEXT PDF63.10 Completeness and accuracy of information.
TEXT PDF63.11 Deliberate misconduct.
TEXT PDF63.15 Site characterization.
TEXT PDF63.16 Review of site characterization activities.
TEXT PDF63.21 Content of application.
TEXT PDF63.22 Filing and distribution of application.
TEXT PDF63.23 Elimination of repetition.
TEXT PDF63.24 Updating of application and environmental impact statement.
TEXT PDF63.31 Construction authorization.
TEXT PDF63.32 Conditions of construction authorization.
TEXT PDF63.33 Amendment of construction authorization.
TEXT PDF63.41 Standards for issuance of a license.
TEXT PDF63.42 Conditions of license.
TEXT PDF63.43 License specification.
TEXT PDF63.44 Changes, tests, and experiments.
TEXT PDF63.45 Amendment of license.
TEXT PDF63.46 Particular activities requiring license amendment.
TEXT PDF63.51 License amendment for permanent closure.
TEXT PDF63.52 Termination of license.
TEXT PDF63.61 Provision of information.
TEXT PDF63.62 Site review.
TEXT PDF63.63 Participation in license reviews.
TEXT PDF63.64 Notice to State.
TEXT PDF63.65 Representation.
TEXT PDF63.71 Records and reports.
TEXT PDF63.72 Construction records.
TEXT PDF63.73 Reports of deficiencies.
TEXT PDF63.74 Tests.
TEXT PDF63.75 Inspections.
TEXT PDF63.78 Material control and accounting records and reports.
TEXT PDF63.101 Purpose and nature of findings.
TEXT PDF63.102 Concepts.
TEXT PDF63.111 Performance objectives for the geologic repository operations area through permanent closure.
TEXT PDF63.112 Requirements for preclosure safety analysis of the geologic repository operations area.
TEXT PDF63.113 Performance objectives for the geologic repository after permanent closure.
TEXT PDF63.114 Requirements for performance assessment.
TEXT PDF63.115 Requirements for multiple barriers.
TEXT PDF63.121 Requirements for ownership and control of interests in land.
TEXT PDF63.131 General requirements.
TEXT PDF63.132 Confirmation of geotechnical and design parameters.
TEXT PDF63.133 Design testing.
TEXT PDF63.134 Monitoring and testing waste packages.
TEXT PDF63.141 Scope.
TEXT PDF63.142 Quality assurance criteria.
TEXT PDF63.143 Implementation.
TEXT PDF63.144 Quality assurance program change.
TEXT PDF63.151 General requirements.
TEXT PDF63.152 Training and certification program.
TEXT PDF63.153 Physical requirements.
TEXT PDF63.161 Emergency plan for the geologic repository operations area through permanent closure.
TEXT PDF63.171 Violations.
TEXT PDF63.172 Criminal penalties.
TEXT PDF63.201 Purpose and scope.
TEXT PDF63.202 Definitions for Subpart K.
TEXT PDF63.203 Implementation of Subpart K.
TEXT PDF63.204 Preclosure standard.
TEXT PDF63.301 Purpose and scope.
TEXT PDF63.302 Definitions for Subpart L.
TEXT PDF63.303 Implementation of Subpart L.
TEXT PDF63.304 Reasonable expectation.
TEXT PDF63.305 Required characteristics of the reference biosphere.
TEXT PDF63.311 Individual protection standard after permanent closure.
TEXT PDF63.312 Required characteristics of the reasonably maximally exposed individual.
TEXT PDF63.321 Individual protection standard for human intrusion.
TEXT PDF63.322 Human intrusion scenario.
TEXT PDF63.331 Separate standards for protection of ground water.
TEXT PDF63.332 Representative volume.
TEXT PDF63.341 Projections of peak dose.
TEXT PDF63.342 Limits on performance assessments.
TEXT PDF63.343 Severability of individual protection and ground-water protection standards.


---------------------------------------------------------------------
-----------

[BACK ][BACK ]