Reports and papers listed by document number

Search in library for  

Number Title sort
 

Videos

Brochures: Pocket Guide, Dam Guide, Field Guide, Power Generation Map

Independent Science libraries: IEAB, ISAB, ISRP

Newsletters: Monthly Spotlight, Council Quarterly, Northwest Energy News (archive)

Major reports: 5th Power Plan, Fish and Wildlife Program, Subbasin Plans, 20 Years of Progress

Budgets and Annual reports

  Directory of Columbia River Basin Tribes (updated Nov 2007)
  Directory of Organizations (updated Oct 2007)
  2008
2008-13 Preliminary Draft Fuel Prices for the Sixth Power Plan
2008-12 Draft 2008 Annual Report to Congress
2008-11 Draft Amendments to the Columbia River Basin Fish and Wildlife Program
2008-10 Fiscal Year 2010 Budget and Fiscal Year 2009 Revisions
2008-09 Comments on Recommendations to Amend the Columbia River Basin Fish and Wildlife Program
2008-08 Marginal Carbon Dioxide Production Rates of the Northwest Power System
Comment on F&W High Level Indicators
2008-07 Final Resource Adequacy Standard for the Northwest
2008-06 Recommendations to Amend the Columbia River Basin Fish and Wildlife Program
2008-05 Final Interim Wholesale Power Price Forecast
2008-04 Draft Fiscal Year 2010 budget and Fiscal Year 2009 revisions
2008-03 Seventh Annual Report to the Northwest Governors On Expenditures of the Bonneville Power Administration
2008-02 Fiscal Year 2007 Annual Report to Congress
2008-01 Draft Resource Adequacy Standard For the Northwest (draft, replaced by 2008-07)
  2007
2007-22 Issues for the Sixth Pacific Northwest Power and Conservation Plan
2007-21 Best Practices for Reporting Location and Time Related Data
2007-20 Interim Wholesale Power Price Forecast (draft, replaced by 2008-05)
2007-19 6th Annual Report on BPA F&W Expenditures
2007-17 Request for Recommendations to Amend the Fish and Wildlife Program
2007-16 Draft Annual Report to Congress
2007-15 Carbon Dioxide Footprint of the Northwest Power System
2007-14 Revised Fuel Price Forecasts
2007-13 Achievable Savings: A Retrospective Look at the Council’s Conservation Planning Assumptions
2007-11 FY 2009 budget & 2008 revisions
2007-10 Draft Revised Fuel Price Forecasts
2007-9 Pacific Northwest Resource Adequacy Assessment: 2010 and 2012
2007-8 6th Annual Report on BPA F&W Expenditures (draft, replaced by 2007-19)
2007-7 Achievable Savings: A Retrospective Look at the Council’s Conservation Planning Assumptions (draft, replaced by 2007-13)
2007-6 FY 2009 budget & 2008 revisions (draft, replaced by 2007-11)
2007-5 Directory of Columbia River Basin Tribes
2007-4 Biennial Monitoring Report on the Fifth Power Plan (replaces draft 2007-3)
2007-2 Fiscal Year 2006 Annual Report to Congress
WIF 2007-1 Northwest Wind Integration Action Plan
2007-1 Council Briefing Book
  2006
2006-23 A Pilot Capacity Adequacy Standard For the Pacific Northwest
2006-22 Pacific Northwest Resource Adequacy Warning Implementation Plan
2006-21

Three Step Review Process

2006-20 Summary of Components of the “Best of the Region” Standard for New Non-Residential Building Proposal: Invitation to Comment
2006-19 The role of renewable resources in the Fifth Power Plan
2006-18 A Pilot Capacity Adequacy Standard for the Pacific Northwest (draft, replaced by 2006-23)
2006-17 Pacific Northwest Resource Adequacy Implementation Plan (draft)
2006-16 FY 2007-2009 Draft Council Recommendations
2006-15 Proposal to add Province-level biological objectives
2006-14 Draft Fiscal Year 2006 Annual Report to Congress (draft, replaced by 2007-2)
2006-13 FY 2008 budget & 2007 revisions
2006-11 Fifth Annual Report to Northwest Governors on Expenditures of the Bonneville Power Administration
2006-10 Electricity Generation for the Pacific Northwest: Map brochure
2006-9 Fifth Annual Report to Northwest Governors on Expenditures of the Bonneville Power Administration (draft, replaced by 2006-11)
2006-8 International Columbia River Basin Center of Knowledge proposal
2006-7 Columbia Basin Data Center proposal
2006-6 FY 2008 budget & 2007 revisions (draft, replaced by 2006-13)
2006-5 A Resource Adequacy Standard for the Pacific Northwest
2006-4 Draft Guidance for Developing Monitoring and Evaluation as a Program Element of the Fish and Wildlife Program
2006-3 Columbia River Basin Research Plan
2006-2 FY 2005 Annual Report to Congress
2006-1 A Resource Adequacy Standard for the Pacific Northwest (draft, replaced by 2006-5)
  2005
2005-13 Subbasin Plan Amendments: Findings and Responses to Comments
2005-12 Draft FY 2005 Annual Report to Congress
2005-11 APRE Report to Congress
2005-10 Fiscal Year 2007 budget and Fiscal Year 2006 revisions
2005-9 Fourth Annual Report to Northwest Governors on Expenditures of the Bonneville Power Administration
2005-7 Fifth Power Plan: Publication version
2005-6 Discussion of the Effects of the Administration’s Proposal to Count Third-Party Debt under Bonneville’s Borrowing Authorization
2005-5 Draft Fourth Annual Report to Northwest Governors on Expenditures of the Bonneville Power Administration
2005-4 Sekokini Springs Natural Rearing Facility and Educational Center Master Plan
2005-3 Klickitat Subbasin Anadromous Fishery Master Plan
2005-2 Fiscal Year 2004 Annual Report to Congress
2005-1 Council Briefing Book
  2004
  Chief Joseph Master Plan
2004-18 Fifth Power Plan: Pre-publication version
2004-17 Artificial Production Review and Evaluation Basin-Level Report (replaces 2003-17)
2004-16 Pocket Guide to the Columbia River Basin (2005 Edition)
2004-15 Guide for the Northwest's Energy Future (brochure on the Draft 5th Power Plan)
2004-13 Draft Columbia River Basin Research Plan
2004-12 Draft Fifth Power Plan
2004-11 Fiscal Year 2006 budget and 2005 revisions
2004-10 Draft Fiscal Year 2004 Annual Report to Congress (replaced by 2005-2)
2004-9 Chief Joseph Dam Hatchery Master Plan
2004-8 Artificial Production Review and Evaluation Issue Paper
2004-7 Guide to Subbasin Planning (2.7m PDF)
2004-5 Council Recommendations for the Future Role of the Bonneville Power Administration in Power Supply (replaces 2004-2)
2004-4 Fiscal Year 2003 Annual Report to Congress (replaces 2003-16)
2004-3 Third Annual Report to the Northwest Governors On Expenditures of the Bonneville Power Administration
2004-2 Council Recommendations for the Future Role of the Bonneville Power Administration in Power Supply (draft, replaced by 2004-5)
2004-1 Guide to Major Hydropower Dams of the Columbia River Basin
  2003
2003-23 Transmission Issues
2003-20 20 Years of Progress
2003-19 Council By-Laws, revised Oct 2003 (replaces 2003-10 & 2002-2)
2003-18 The Future Role of the Bonneville Power Administration in Power Supply
2003-17 Artificial Production Review and Evaluation (APRE) Draft Basin-Level Report (draft, replaced by 2004-17)
2003-16 Draft Fiscal Year 2003 Annual Report to Congress
2003-14 Field Guide
2003-13 Directory of Organizations (replaced by 2007-18)
2003-12 Fiscal Year 2005 budget and 2004 revisions (replaces draft 2003-5)
2003-11 Mainstem amendments to the 2000 Columbia River Basin Fish and Wildlife Program, Final
2003-10 Draft Council By-Laws
2003-9 Power Project Financing Assumptions for the Fifth Power Plan
2003-8 Discount Rate for the Fifth Power Plan
  4 governors' recommendations for protecting and restoring Columbia River fish and wildlife and preserving the benefits of the Columbia River power system
2003-7 Revised Draft Fuel Price Forecasts for the Fifth Power Plan
2003-6 Revised Draft Forecast of Electricity Demand for the Fifth Power Plan
2003-5 Fiscal Year 2005 budget and 2004 revisions (draft, replaced by 2003-12)
2003-4 Mainstem amendments to the 2000 Fish and Wildlife Program
2003-3 Coeur d’Alene Tribe Trout Production Facility Master Plan
2003-2 Council Briefing Book
2003-1 Fiscal Year 2002 Annual Report to Congress (replaces draft report 2002-10)
  2002
  Multi-Species Framework Approach for the Columbia River Basin (Feb)
2002-20 Forecasting Electricity Demand of the Region's Aluminum Plants
2002-19 Recommendations on Future Role of Bonneville in Power Supply (replaces draft report 2002-17)
2002-18 Demand Response Issue Paper for the Fifth Power Plan  
2002-17 Draft Recommendations on the Future Role of Bonneville
2002-16 Draft Amendments to the Fish and Wildlife Program
2002-15 Fuel Price Forecasts for the Fifth Power Plan (replaces draft report 2002-7)
2002-13 Second Annual Report to the Northwest Governors On Expenditures of the Bonneville Power Administration

2002-12

Fiscal Year 2004 Budget and 2003 Revisions (replaces 2002-8)
2002-11 Draft Forecast of Electricity Demand for Fifth Power Plan
2002-10 Draft Fiscal Year 2002 Annual Report to Congress

2002-8

Fiscal Year 2004 Budget and 2003 Revisions (draft, 890k PDF, replaced by 2002-12)
2002-7 Fuel Price Forecasts for the Fifth Power Plan (draft, replaced by 2002-15)
2002-6 Fiscal Year 2003 federal agency appropriations recommendations
2002-5 Request for comment on proposed alternative project selection process
2002-4 Briefing Book: Columbia Basin Tribes (2002) (160k PDF, replaces 2000-11)
2002-3 Mainstem Passage Strategies in the Columbia River System: Transportation, Spill, and Flow Augmentation, aka "Giorgi Report"
2002-2 Bylaws of the Pacific Northwest Electric and Conservation Planning Council
2002-1 Request for comment: Issues for the Fifth Northwest Power Plan
  2001
2001-29 Three Step Review Process
2001-28 Analysis of Winter 2001-2002 Power Supply Adequacy Report (330k PDF)
2001-27 Electrical Generation Units to Serve System Load (3mb PDF)
2001-26 An Efficiency Power Plant in Three Years: An Interim Goal for the Northwest
2001-24 and
2001-25
Fiscal Year 2001 Annual Implementation Work Plan
2001-23 Economic and electricity demand analysis and comparison of Council's 1995 forecast to current data
2001-22 Fiscal Year 2003 Budget and FY 2002 Revisions (replaces draft report 2001-10)
2001-21a Fiscal Year 2001 Annual Report to Congress (replaces draft report 2001-21)
2001-20 Technical Guide for Subbasin Planners
2001-19 Subbasin Planning Overview
2001-18 Summary of Hydrosystem Operations as specified in the FCRPS 2000 Biological Opinion (50k PDF)
2001-17 Direct Use of Natural Gas Policy: Issue Paper
2001-16 Recommendations on developing a Mainstem Plan for the 2000 Fish and Wildlife Program
2001-14 Analysis of Federal Columbia River Power System Operations on Fish Survival During Summer 2001
2001-13 Council Demand Forecasting Issues
2001-12 Findings on the Year 2000 Recommendations for Amendments to the 2000 Fish and Wildlife Program
2001-11 Pacific Intertie: The California Connection on the Electron Superhighway (175k PDF)
2001-9 Effects of 2001 Mid-Columbia Hydropower Operations on Fish: Addendum to the Federal Columbia River Power System Issue Paper (40k PDF)
2001-7 Analysis of 2001-2002 Power Supply Outlook
2001-6 Recommendations on 2001 Federal Columbia River Power System Operations on Fish Survival
2001-5 Northwest Electricity Markets in 2001: Status and Proposed Actions
2001-4 Request for Recommendations on Fish and Wildlife Program Mainstem Plan
2001-3 Fiscal Year 2000 Annual Report to Congress
2001-2 Inaugural Annual Report of the Columbia Basin Fish and Wildlife Program, 1978-1999
2001-1 Briefing Book
  2000
2000-19 2000 Columbia River Basin Fish and Wildlife Program
2000-18 Study of Western Power market Prices: Summer 2000, Summary of Final Report (360k PDF)
2000-17 Fiscal Year 2000 Annual Report to Congress (360k PDF, draft, replaced by 2001-3)
2000-16 The Northern Pikeminnow Management Program: An Independent Review of Program Justification, Performance and Cost-Effectiveness (120k PDF)
2000-15 Fiscal Year 2002 Budget and Fiscal Year 2001 Revisions
2000-14 2000 Columbia River Basin Fish and Wildlife Program (draft, replaced by 2000-19)
2000-12 Return to the River
2000-11 Briefing Book: Columbia Basin Tribes (175k PDF, replaced by 2002-4, see above)
2000-8 Master Plan for Northeast Oregon Hatchery Project
2000-7 Form for Recommendations to Amend the F&W Program (110k PDF)
2000-6 Fiscal Year 2000 Annual Implementation Work Plan
2000-5 Human Effects Analysis of the Multi-Species Framework Alternatives
2000-4
2000-4a
Northwest Power Supply: Adequacy/Reliability Study Phase I Report (380k PDF)
plus Appendices (110k PDF)
2000-3 Recommendations to the Bonneville Power Administration Regarding Conservation Acquisition 2002–2006
2000-2 Fish and Wildlife Program/Framework Concept: Strawman
2000-1 Amendment Process: Columbia River Basin Fish and Wildlife Program
(brochure) The Year of Decision
  1999
99-18 Issue paper on Bonneville Conservation Acquisition 2002 – 2006
   also see recommendations document 2000-3
99-15 Artificial Production Review
99-14 19th Annual Report to Congress (replaces 99-12)
99-12 19th Annual Report to Congress (draft, replaced by 99-14)
99-9 Report to Congress: Review of BPA Reimbursable Account Programs
99-6 Review of BPA Reimbursable Account Programs
99-5 Report and Recommendations upon Review of Corps of Engineers
99-4 Review of Artificial Production of Anadromous and Resident Fish
99-3 Review of the Corps Columbia River Fish Mitigation Program
99-2 APR Production Policy Statement on Hatcheries
99-1 Regional Technical Forum and BPA's Conservation and Renewable Resource Discount - How Should the RTF Be Structured
(brochure) 7 steps to saving salmon (and other fish and wildlife)
  1998
98-33 Review of Salmonid Artificial Production by SRT/ISAB
98-31 Annual Implementation Work Plan for FY 1999
98-29 18th Annual Report to Congress (replaces 98-20)
98-28 Artificial Production Meeting Sep 14, 1998
98-26 Artificial Production Meeting Aug 10, 1998
98-25 Discussion of Issues Raised by the ISRP Report
98-24 Response to Comments on 4th Power Plan
98-23 Addendum to the 1996 Power Plan
98-22 Revised Fourth Power Plan (replaces 96-5)
98-21 Artificial Production Meeting July 1998
98-20 18th Annual Report to Congress (draft, replaced by 98-29)
98-19 Solar Energy Systems
98-18 Draft Proposal for Initiating the Regional Technical Forum (RTF)
98-16 Development of Regional Framework
98-12 Artificial Production Meeting June 1998
98-11 Analysis of BPA Future Costs
98-10 Briefing Book (replaced by 2001-1, see above)
98-9 Artificial Production Meeting May 1998
98-8 Role of the NWPPC
98-6 Mainstem Capital Construction
98-5 Artificial Production Meeting April 1998
98-4 Artificial Production Meeting February 1998
98-3 Transmission System Impacts of Drawing Down John Day Dam
98-2 Artificial Production Meeting January 1998
98-1 Review of Contracting Processes
CR 98-2 Cost Review of the Columbia River Power System (replaces draft CR 98-1)
CR 98-1 Cost Review of the Columbia River Power System (draft replaced by CR 98-2)
(paper) Toward Ecosystem-Based Management in the Upper Columbia River Basin: Workshop Summary Report
(statement) Chairman's statement on dam breaching
  1997
97-18 Corps Capital Construction Draft Scoping Document
97-17 Artificial Production Review Draft Scoping Document
97-15 Downstream Passage for Salmon at Hydroelectric Projects
97-12 Methods of Economic Analysis for Salmon Recovery Programs
97-10 180-Day Review of Fish and Wildlife Governance
97-7 Addendum to the Fourth Power Plan
97-6 Consideration of Ocean Conditions
(paper) Energy issue papers
(paper) FY 1998 Annual Implementation Work Plan: Policy issues and recommendations
(paper) Fish and wildlife recovery in the Pacific Northwest: Breaking the Deadlock
(brochure) River Future
  1996
96-10 180-Day Review of Fish and Wildlife Governance (see introductory document 97-10)
96-6 ISG Return to the River Report (replaced by 2000 version)
96-5 Fourth Power Plan (replaced by 98-22)
96-2 The Green Book
CR 96-26 Comprehensive Review Final Report
(paper) Multiyear Implementation Planning
  1994
94-55 1994 Columbia River Basin Fish and Wildlife Program
94-41 Direct Use of Natural Gas: Analysis and Policy Options
  Opportunities for Energy Efficiency in the Northwest Microelectronics Industry (1.5mb PDF)
  1992
92-21 Strategy for Salmon
  1986
  Compilation of Information on Salmon and Steelhead Losses in the Columbia River Basin
  1985
  Compilation of Information on Salmon and Steelhead Total Run Size, Catch and Hydropower Related Losses in the Upper Columbia River Basin, Above Grand Coulee Dam [UCUT report, but hosted on Council's site]
  1982
(paper) The Path Along the Ridge: Regional Planning in the Face of Uncertainty
  Northwest Power Act
Get Acrobat Reader Documents in Acrobat PDF format
require the Acrobat reader plugin