DESTINATION MOON: A History of the Lunar Orbiter Program
-
TABLE OF CONTENTS
-
Preface
.
I.
Unmanned Lunar Exploration and the Need for a Lunar Orbiter.
-
The call for a program of exploration
.
-
Mustering for the challenge of space
.
II.
Toward a Lightweight Lunar Orbiter.
-
The Surveyor program
.
-
Early Apollo impact on lunar orbiter planning
.
-
The Centaur rocket program
.
-
The search for a lightweight orbiter
.
-
OSS-OMSF cooperative planning
.
-
The Scherer group's report
.
-
Problems at JPL
.
-
Langley enters the picture
.
-
Establishing management arrangements
.
-
Langley develops the request for proposal document
.
-
Stipulations of the request for proposal document
.
III.
Beginning the Lunar Orbiter Program.
-
Congress questions NASA on orbiter
.
-
The lunar orbiter project office is established
.
-
Preparing for contract bids
.
-
The Langley source evaluation board.
-
The lunar orbiter proposals
.
-
The Boeing lunar orbiter proposal
.
-
The Eastman Kodak photographic system
.
-
Selecting the lunar orbiter contractor
.
IV.
NASA and Boeing Negotiate a Contract.
-
Early Boeing preparations
.
-
NASA preparations for contract negotiations
.
-
Congressional criticism of contractor choice
.
-
No duplication of effort
.
-
NASA solely responsible for photographic data
.
-
Langley-JPL working relations
.
V.
Implementing the Program.
-
Early funding considerations
.
-
Boeing negotiations with subcontractors
.
-
NASA cost-reduction efforts
.
VI.
The Lunar Orbiter Spacecraft.
-
A general description.
-
Early design, fabrication, and testing problems
.
VII.
Building the Spacecraft: Problems and Resolutions.
-
Experiments for lunar orbiter
.
-
Other potential experiments
.
-
Preliminary mission planning activities
.
-
Testing procedures and program reviews
.
-
Problem areas: Last quarter 1964 to first half 1965
.
VIII.
Lunar Orbiter Mission Objectives and Apollo Requirements.
-
OSSA and OMSF Planning Activities
.
-
Developing mission designs
.
-
The ad hoc Surveyor/Orbiter utilization committee (SOUC)
.
-
Presentation of mission A
.
-
Funding and technical problems - 1965
.
-
The status of the Boeing contract
.
-
Spacecraft compatibility with launch and tracking facilities
.
-
Flight recording equipment
.
-
A change in delivery incentive
.
IX.
Missions I, II, and III: Apollo-Site Search and Verification.
-
Preparations for the first launch
.
-
The first launch
.
-
Results of the first mission
.
-
Prelude to mission II
.
-
The plan for mission II
.
-
The second mission
.
-
The third orbiter mission
.
X.
Missions IV and V: The Lunar Surface Explored
.
-
Preparing for the fourth mission
.
-
The fourth orbiter mission
.
-
Preparations for the fifth mission
.
-
Lunar orbiter V mission objectives
.
-
The final mission
.
-
The end of the operational phase
.
XI.
Conclusions: Lunar Orbiter's Contribution to Space Exploration.
-
A sixth orbiter mission?
-
Apollo mission planning and lunar orbiter data
.
-
Results of non-photographic lunar orbiter experiments
.
-
A meaning for the lunar orbiter achievements
.
XII.
Lunar Orbiter Photography
.
Appendix A
: Glossary.
Appendix B
: Organization Charts.
Appendix C
: Record of Unmanned Lunar Probes, 1958-1968.
References
.
Source notes
.
Author