This is the accessible text file for GAO report number GAO-06-431 
entitled 'National Park Service: Major Operations Funding Trends and 
How Selected Park Units Responded to Those Trends for Fiscal Years 2001 
through 2005' which was released on April 5, 2006. 

This text file was formatted by the U.S. Government Accountability 
Office (GAO) to be accessible to users with visual impairments, as part 
of a longer term project to improve GAO products' accessibility. Every 
attempt has been made to maintain the structural and data integrity of 
the original printed product. Accessibility features, such as text 
descriptions of tables, consecutively numbered footnotes placed at the 
end of the file, and the text of agency comment letters, are provided 
but may not exactly duplicate the presentation or format of the printed 
version. The portable document format (PDF) file is an exact electronic 
replica of the printed version. We welcome your feedback. Please E-mail 
your comments regarding the contents or accessibility features of this 
document to Webmaster@gao.gov. 

This is a work of the U.S. government and is not subject to copyright 
protection in the United States. It may be reproduced and distributed 
in its entirety without further permission from GAO. Because this work 
may contain copyrighted images or other material, permission from the 
copyright holder may be necessary if you wish to reproduce this 
material separately. 

Report to Congressional Requesters: 

March 2006: 

National Park Service: 

Major Operations Funding Trends and How Selected Park Units Responded 
to Those Trends for Fiscal Years 2001 through 2005: 

[Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-06-431]: 

GAO Highlights: 

Highlights of GAO-06-431, a report to congressional requesters: 

Why GAO Did This Study: 

In recent years, some reports prepared by advocacy groups have raised 
issues concerning the adequacy of the Park Service’s financial 
resources needed to effectively operate the park units. 

GAO was asked to identify (1) funding trends for Park Service 
operations and visitor fees for fiscal years 2001-2005; (2) specific 
funding trends for 12 selected high visitation park units and how, if 
at all, the funding trends have affected operations; and (3) recent 
management initiatives the Park Service has undertaken to address 
fiscal performance and accountability of park units. 

What GAO Found: 

Overall, amounts appropriated to the National Park Service (Park 
Service) in the Operation of the National Park System account increased 
from 2001 to 2005. In inflation-adjusted terms, amounts allocated by 
the Park Service to park units from this appropriation for daily 
operations declined while project-related allocations increased. 
Project-related allocations increased primarily in (1) cyclic 
maintenance and repair and rehabilitation programs to reflect an 
emphasis on reducing the estimated $5 billion maintenance backlog and 
(2) the inventory and monitoring program to protect natural resources 
through the Natural Resource Challenge initiative. Also, on an average 
annual basis, visitor fees collected increased about 1 percent, a 2 
percent decline when adjusted for inflation. 

All park units we visited received project-related allocations but most 
of the park units experienced declines in inflation-adjusted terms in 
their allocations for daily operations. Each of the 12 park units 
reported their daily operations allocations were not sufficient to 
address increases in operating costs, such as salaries and new Park 
Service requirements. In response, officials reported that they either 
eliminated or reduced services, or relied on other authorized sources 
to pay operating expenses that have historically been paid with 
allocations for daily operations. Also, implementing important Park 
Service policies, without additional allocations, has placed additional 
demands on the park units and reduced their flexibility. For example, 
the Park Service has directed its park units to spend most of their 
visitor fees on deferred maintenance projects. While the Park Service 
may use visitor fees to pay salaries for permanent staff that 
administer projects funded with these fees, it has a policy prohibiting 
such use. To alleviate the pressure on daily operations allocations, we 
believe it would be appropriate to use visitor fees to pay the salaries 
of employees working on visitor fee-funded projects. Interior believes 
that while employment levels at individual park units may have 
fluctuated for many reasons, employment servicewide was stable, 
including both seasonal and permanent employees. 

GAO identified three initiatives--Business Plan, Core Operations 
Analysis, and Park Scorecard--to address park units’ fiscal performance 
and operational condition. Of the park units we visited with a business 
plan, officials stated that the plans, among other things, have helped 
them better identify future budget needs. Due to its early development 
stage, only a few park units have participated in the Core Operations 
Analysis; for those we visited who have, officials said that they are 
better able to determine where operational efficiencies might accrue. 
Park Service headquarters used the Scorecard to validate and approve 
increases in funding for daily operations for fiscal year 2005. 

What GAO Recommends: 

GAO recommends that Interior allow park units to use visitor fee 
revenues to pay the costs of permanent employees administering projects 
funded by visitor fees. 

In commenting on the draft report, Interior suggested the 
recommendation be modified to dictate that visitor fee revenue be used 
to fund only a limited number of employees and to specific projects. 
GAO believes its recommendation, as written, provides the latitude 
sought. 

Interior also commented that it believes the report creates a 
misleading impression of the state of park operations. 

www.gao.gov/cgi-bin/getrpt?GAO-06-431. 

To view the full product, including the scope and methodology, click on 
the link above. For more information, contact Robin Nazzaro at (202) 
512-3841 or nazzaror@gao.gov. 

[End of section] 

Contents: 

Letter: 

Results in Brief: 

Background: 

Appropriations for the Operation of the National Park System Account 
Increased Overall from Fiscal Years 2001 to 2005; the Total Allocation 
for Daily Operations Declined Overall and the Total Allocation for 
Projects Increased Overall When Adjusted For Inflation: 

Allocation Trends for Projects and Daily Operations at 12 High- 
Visitation Park Units Varied, but All 12 Parks Reported Reduced 
Services and an Increasing Reliance on Other Authorized Sources to 
Supplement Daily Operations Allocations: 

The Park Service Has Undertaken Three Management Initiatives to Address 
Fiscal Performance and Accountability of Park Units: 

Conclusions: 

Recommendation for Executive Action: 

Agency Comments and Our Response: 

Appendixes: 

Appendix I: Scope and Methodology: 

Appendix II: Operation of the National Park System Account and Visitor 
Fee Revenue, Fiscal Years 2001 through 2005: 

Appendix III: Summary of Funding and Personnel Trends for 12 Selected 
Park Units: 

Appendix IV: Recreation Visitation Trends for the Park Service and 12 
Selected Park Units, Fiscal Years 2001 through 2005: 

Appendix V: Comments from the Department of the Interior: 

GAO Comments: 

Appendix VI: GAO Contacts and Staff Acknowledgments: 

Related GAO Products: 

Tables: 

Table 1: Number and Percentage of Park Units with Overall Declines or 
Increases in Allocations for Daily Operations when Adjusted for 
Inflation Based on Average Recreation Visits from Fiscal Years 2001 
through 2005: 

Table 2: Allocations for Cyclic Maintenance, Repair and Rehabilitation, 
and Inventory and Monitoring Programs from Fiscal Years 2001 through 
2005: 

Table 3: Project Allocations for 12 Selected Park Units, Fiscal Years 
2001 through 2005: 

Table 4: Daily Operations Allocations at Selected Park Units from 
Fiscal Years 2001 through 2005 in Nominal Dollars: 

Table 5: Daily Operations Allocations at Selected Parks Units from 
Fiscal Years 2001 through 2005 in Inflation-Adjusted Dollars: 

Table 6: Average Annual Change in Personnel Expenditures and Personnel 
Funded with Allocations from Daily Operations from Fiscal Years 2001 
through 2005 in Inflation-Adjusted Dollars: 

Table 7: Percentage of Allocations for Daily Operations Spent on 
Personnel from Fiscal Years 2001 through 2005: 

Table 8: Other Funding Source Amounts from Fiscal Years 2001 through 
2005 in Nominal Dollars: 

Table 9: Park Service Management Initiatives to Address Park Units' 
Fiscal Performance and Accountability: 

Table 10: Park Service Units that GAO Visited: 

Table 11: Operation of the National Park System Account and Visitor Fee 
Revenue, in Nominal Dollars, Fiscal Years 2001 through 2005: 

Table 12: Operation of the National Park System Account and Visitor Fee 
Revenue, in Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Table 13: Total Personnel Expenditures at 12 Selected Park Units, in 
Nominal Dollars, Fiscal Years 2001 through 2005: 

Table 14: Total Personnel Expenditures at 12 Selected Park Units, in 
Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Table 15: Personnel (Full Time Equivalent) by Funding Source at 12 
Selected Park Units, Fiscal Years 2001 through 2005 60: 

Table 16: Employee Numbers and Nominal Personnel Costs Per Retirement 
System at 12 Selected Park Units, Fiscal Years 2001 through 2005: 

Table 17: Employee Numbers and Inflation-Adjusted Personnel Costs Per 
Retirement System at 12 Selected Park Units, Fiscal Years 2001 through 
2005: 

Table 18: Other Authorized Funding Source Amounts for 12 Selected Park 
Units, in Nominal Dollars, Fiscal Years 2001 through 2005: 

Table 19: Other Authorized Funding Source Amounts for 12 Selected Park 
Units, in Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Table 20: Recreation Visitation Trends for the Park Service and 12 
Selected Park Units, Fiscal Years 2001 through 2005: 

Figures: 

Figure 1: Principal Operations Funding Sources for National Park Units: 

Figure 2: Appropriations for the Operation of the National Park System 
Account from Fiscal Years 2001 through 2005: 

Figure 3: Overall Allocations for Daily Operations for Park Units from 
Fiscal Years 2001 through 2005: 

Figure 4: Number of Park Units for Different Average Annual Percent 
Changes in Inflation-Adjusted Terms in Allocations for Daily Operations 
from Fiscal Years 2001 through 2005: 

Figure 5: Project and Other Support Program Allocations from Fiscal 
Years 2001 through 2005: 

Figure 6: Park Service Allocations for Daily Operations as a Percent of 
the Operation of the National Park System Account from Fiscal Years 
2001 through 2005: 

Figure 7: Park Service Visitor Fee Revenue from Fiscal Years 2001 
through 2005: 

Abbreviations: 

BCP: Budget Cost Projection: 

BPI: Business Plan Initiative: 

COA: Core Operations Analysis: 

CSRS: Civil Service Retirement System: 

FERS: Federal Employee Retirement System: 

FMSS: Facility Maintenance Software System: 

FTE: Full Time Equivalent: 

GDP: Gross Domestic Product: 

ONPS: Operation of the National Park System: 

Letter March 31, 2006: 

The Honorable Charles Taylor: 
Chairman, Subcommittee on Interior, Environment, and Related Agencies: 
Committee on Appropriations: 
House of Representatives: 

The Honorable Norman Dicks Ranking Member, Subcommittee on Interior, 
Environment, and Related Agencies: 
Committee on Appropriations: 
House of Representatives: 

The National Park Service (Park Service) manages 390 park units 
covering over 84 million acres that provide recreational and 
educational opportunities--and numerous other benefits--to millions of 
visitors each year. From 2001 to 2005, park units averaged a total of 
about 274 million recreation visits per year. Visitors come to the park 
units to experience such features as grand waterfalls, mountain vistas, 
canyons and gorges, giant redwood trees, wildlife, historical landmarks 
such as Revolutionary and Civil War battlefields, Native American 
dwellings and artifacts, and memorials honoring veterans. Within its 
mandate to conserve park resources and to provide for their enjoyment 
in a manner that leaves them unimpaired for future generations, the 
Park Service provides a variety of visitor services such as 
interpretative education films, guided tours, and information centers 
where visitors can learn about the unique features of the park units. 

Congress provides funding for the Park Service through a number of 
appropriations accounts; the largest is the Operation of the National 
Park System (ONPS), which funds the management, operations, and 
maintenance of park areas and facilities and the general administration 
of the Park Service.[Footnote 1] Congress has made additional funding 
available by permitting the Park Service to charge and retain 
recreation fees, referred to in this report as "visitor fees." The Park 
Service also has, among other things, authority to charge and retain 
concessions fees and to accept donations and voluntary services. As 
with any federal program, the Park Service is expected to manage within 
whatever level of funding is provided and to allocate resources to its 
park units in a way that is both efficient and effective in delivering 
services. The Park Service has chosen to allocate funds to its park 
units in two categories--for daily operations, and for specific, non- 
recurring projects. Park managers use funding for daily operations to 
pay for visitor and resource protection, interpretation and education, 
and facilities operations, among other things. About eighty percent or 
more of the park units' daily operations funds pay for salaries and 
benefits for staff to carry out these mission components, while the 
remainder is used for overhead expenses such as utilities, supplies, 
and training. The project-related portion provides funds for non- 
recurring projects such as replacing roofs on park facilities or 
rehabilitating campgrounds. Park managers generally use these project 
funds to pay temporary employees or contractors to complete these 
projects. 

In addition to providing the funding for daily operations and projects, 
the Congress has enacted legislation authorizing park units to collect 
visitor fees to provide additional funds to use for specified park 
operations. Visitor fees have been used, for example, to construct 
roadside exhibits and to rehabilitate boat launch facilities. The Park 
Service has recently set a goal to spend the majority of its visitor 
fees on reducing its estimated $5 billion deferred maintenance backlog. 
The Congress also authorizes the Park Service to receive revenues from 
other sources to assist it in performing its mission. These can include 
fees from concessionaires under contract to perform services at park 
units, such as operating a lodge, and cash or non-monetary donations 
from non-profit organizations or individuals, among others. 

In recent years, concerns over the deteriorating condition of the 
national parks have received increasing attention. Some reports 
prepared by advocacy groups cite a lack of sufficient staff and 
financial resources necessary to effectively operate park units. They 
report problems such as dwindling visitor services, crumbling 
buildings, and threatened resources at many park units including the 
Everglades, Gettysburg, Great Smoky Mountains, Olympic, Yellowstone, 
and others. Some of these reports argue that the purchasing power of 
the park units' funding has been weakened due to inflation and required 
employee pay and benefit increases that were not accounted for in their 
daily operations funding. Some contend that other funds, such as 
donations, are being used to fund operational activities that they 
believe should be paid with funding for daily operations. However, the 
Department of the Interior stated that the Park Service's operating 
funds have increased significantly from 1980 through 2005, particularly 
when compared to other domestic federal agencies. 

To gain a better understanding of funding issues and their effects on 
the park units, you asked us to identify (1) funding trends for Park 
Service operations and visitor fees for fiscal years 2001 through 2005; 
(2) specific funding trends for several high-visitation park units and 
how, if at all, these funding trends have affected operations, 
including the park units' ability to provide services, for fiscal years 
2001 through 2005; and (3) recent management initiatives the Park 
Service has undertaken to address the fiscal performance and 
accountability of park units. 

To identify funding trends for Park Service operations and visitor fees 
from fiscal years 2001 through 2005, we obtained and analyzed 
appropriations legislation, data on the Park Service's allocation of 
funds from the ONPS Account, and data on visitor fees. We analyzed the 
data in both nominal (actual) and real (adjusted for inflation) 
terms.[Footnote 2] A "nominal dollar" is the value of a dollar in the 
prices of the current year, or for purposes of this analysis, the year 
in which a dollar is appropriated. A "real dollar" is a dollar that has 
been adjusted to remove the effects of inflation by dividing the 
nominal dollar by a price index. Appropriations are made in nominal, or 
current-year, dollars. The purpose of showing dollars in inflation-
adjusted terms is to permit comparisons of purchasing power. To 
determine funding trends for selected individual park units and how 
these trends affected the park units' ability to provide services to 
visitors, we selected 12 park units based on visitation, regional 
diversity, and preliminary data on allocations for daily operations. We 
visited the 12 park units, gathered and analyzed nominal and real 
funding and cost data and interviewed park officials to determine 
allocation trends and their impact on operations (including visitor 
services). Our analysis represents our findings at these 12 parks units 
and the results may or may not be representative of the individual 
experiences of other park units or the experience of the National Park 
System as a whole. To identify recent management initiatives the Park 
Service has under way to address fiscal performance and accountability 
for fiscal years 2001 to 2005, we gathered and reviewed documentation 
on several management initiatives and interviewed Park Service 
headquarters, regional office, and individual park unit officials. We 
assessed the reliability of the data by reviewing the methods of data 
collection for relevant Park Service databases. We also sent uniform 
data requests to the 12 park units, provided uniform guidance, and 
interactively worked with park officials to compile the data. We 
determined that the data are sufficiently reliable for the purposes of 
this report. A more detailed description of our scope and methodology 
is presented in appendix I. We performed our work from January 2005 to 
March 2006 in accordance with generally accepted government auditing 
standards. 

Results in Brief: 

Overall, amounts appropriated to the Park Service in the Operation of 
the National Park System account increased from fiscal years 2001 
through 2005. The amounts appropriated rose from about $1.4 billion in 
fiscal year 2001 to almost $1.7 billion in fiscal year 2005--an average 
annual increase of about 5 percent, or about 1 percent when adjusted 
for inflation. The Park Service makes this appropriation available to 
park units by allocating amounts for daily operations and for projects. 
In inflation-adjusted terms, the Park Service's allocation for daily 
operations declined slightly while the project-related allocations 
increased. The amount the Park Service allocated for daily operations 
for park units rose from about $903 million in fiscal year 2001 to 
almost $1.03 billion in fiscal year 2005--an average annual increase of 
about 3 percent, but a slight decline of 0.3 percent when adjusted for 
inflation. The fiscal year 2005 appropriation for the Operation of the 
National Park System Account included an additional $37.5 million over 
the amounts proposed by the House and Senate for the Operation of the 
National Park System Account, to be used for daily operations. The 
conference report accompanying the appropriation stated that the 
additional amount was to be used for (1) a service-wide increase of $25 
million and (2) $12.5 million for visitor services programs at specific 
park units. Allocations for daily operations varied across parks. 
Allocations to 212 of the 380 units fell in inflation-adjusted terms by 
an average of about 2 percent annually while the other 168 remained 
level or increased. In allocating resources to park units, the Park 
Service increased funding for project-related activities at a higher 
rate than for park daily operations. Project-related allocations 
increased overall in both nominal and inflation-adjusted dollars. Total 
project-related allocations rose from $478 million in 2001 to $641 
million in 2005, an average annual increase of about 8 percent, or 
about 4 percent in inflation-adjusted dollars. Three programs that 
provide project funding for individual park units--Cyclic Maintenance, 
Repair and Rehabilitation, and Inventory and Monitoring--account for 
over half of the increase for the project and support program 
allocations. Increases in cyclic maintenance and repair and 
rehabilitation programs reflect an emphasis on the effort for the Park 
Service to reduce its estimated $5 billion deferred maintenance 
backlog. Increases in inventory and monitoring program reflect an 
emphasis to protect natural resources primarily through an initiative 
called the Natural Resource Challenge. In addition to this funding, the 
Park Service collected a total of about $717 million in visitor fees 
from fiscal years 2001 through 2005--or about $670 million when 
adjusted for inflation. On an average annual basis, visitor fees 
collected increased about 1 percent, a 2 percent decline in inflation-
adjusted dollars. 

All park units that we visited received project-related allocations 
between fiscal years 2001 through 2005 but for most park units the 
allocations for daily operations fell in inflation-adjusted terms. 
Allocations of project-related funds at the 12 high-visitation park 
units we visited varied from year-to-year. For example, at Grand Canyon 
National Park allocations increased (in nominal dollars) from $824,000 
in 2001 to $1.9 million in 2004, and then declined to $914,000 in 2005. 
Although funds allocated for daily operations increased from 2001 
through 2005 at all 12 park units we visited, 8 of the 12 experienced a 
decline, and 4 experienced an increase, in daily operations allocations 
when adjusted for inflation. Park managers at all 12 reported their 
allocations were not sufficient to address increases in operating 
costs, such as salary and benefit increases and rising utility costs; 
and new Park Service requirements directed at reducing its deferred 
maintenance needs, implementing its asset management strategy, and 
maintaining law enforcement levels. Officials also stated that these 
factors reduced their management flexibility. As a result, park unit 
managers reported that, to varying degrees, they made trade-offs among 
the operational activities which, in some cases, resulted in reducing 
services in areas such as education, visitor and resource protection, 
and maintenance activities; managers also increasingly relied on 
volunteers and other authorized funding sources to provide operations 
and services that were previously paid with allocations for daily 
operations. In commenting on a draft of this report, the Department of 
Interior said that the report creates a misleading impression 
concerning the state of park operations in that (1) record high levels 
of funds are being invested to staff and improve parks, and (2) the 
report does not examine the results achieved with these inputs. The 
department also believes that while employment levels at individual 
park units may have fluctuated for many reasons, employment servicewide 
was stable, including both seasonal and permanent employees. We 
believe, however, that the report provides a detailed analysis of the 
major funding trends affecting Park Service operations, including those 
at the 12 park units we visited, as well as Interior's initiatives and 
efforts to achieve results. 

In an effort to reduce its estimated $5 billion maintenance backlog, 
the Park Service set a goal to spend a majority of its visitor fees on 
deferred maintenance projects. While the Park Service could use visitor 
fees to pay salaries for permanent staff that manage and administer 
projects funded with visitor fees, it has a policy prohibiting such 
use. Instead, these salaries are paid using allocations for daily 
operations, which reduces the amount of the allocation available for 
visitor services and other activities and limits the park units' 
ability to maintain these services and activities. Park Service 
headquarters officials recognize the strain that its policy has had on 
daily operations funding. Park Service headquarters officials said that 
its policy was first established under the original visitor fee program 
because the authority was temporary and it did not want park units to 
hire more permanent staff than were needed. In addition, officials 
stated that it wanted visitor fees to go towards projects that provided 
visible results rather than permanent staff. However, given that 
Congress has recently provided longer-term authority (10 years) for 
collecting visitor fees, headquarters officials stated that they are 
considering changing this policy. To alleviate the pressure on 
allocations for daily operations, we believe it would be appropriate 
for the Park Service to follow through with revising this policy. In 
commenting on a draft of this report, the Department of the Interior 
suggested the recommendation be modified to clearly dictate that fee 
revenues be used to fund only a limited number of permanent employees 
and be specifically defined for the sole purpose of executing projects 
funded from fee revenues. We believe that the recommendation, as 
written, provides sufficient latitude for the department to define how 
to implement the recommendation. 

In response to daily operations allocation trends, increased costs, and 
new policy requirements, parks reported that they either eliminated or 
reduced services, or relied on other authorized funding sources to pay 
operating expenses that have historically been paid for from the 
allocations for daily operations. Because allocations for daily 
operations did not increase commensurately with rising costs, officials 
at the park units we visited stated that they absorbed these additional 
costs by reducing spending on personnel and other expenditures. Since 
personnel costs account for a large percentage of a park's daily 
operations budget, officials told us they have refrained from filling 
vacant positions or have filled them with lower-graded or seasonal 
employees. Park officials also told us that they reduced services 
including, reducing visitor center hours, educational programs, basic 
custodial duties, and law enforcement operations, such as back-country 
patrolling. Officials at park units also stated that they increasingly 
relied on volunteers and nonprofit partner organizations to provide 
information and educational programs to visitors; traditionally these 
activities were offered by park rangers. For example, at Badlands 
National Park, officials stated that approximately 65 percent of 
visitor contacts in 2004 were provided by employees of the park's 
nonprofit partner--the Badlands Natural History Association--compared 
to 45 percent in 2001. Park unit officials explained, however, that 
relying on volunteers and other authorized funding sources such as 
donations can be problematic because there is no guarantee that funds 
and staff from these sources will be available in the future, and 
partner priorities could change from year to year. 

We identified three management initiatives that the Park Service has 
undertaken to address fiscal performance and accountability and to 
better manage within their available resources: the Business Plan 
Initiative (BPI), the Core Operations Analysis (COA), and the Park 
Scorecard. These initiatives are in varying stages of development and 
implementation. Specifically: 

* Through the BPI process, park unit managers--with the help of outside 
business interns--identify all sources and uses of park funding to 
determine levels needed to operate and manage their park units. Using 
this information, park unit managers develop a business plan to address 
any gaps between available funds and park unit needs. The Park Service 
does not require park units to participate, but about 25 percent of all 
park units have participated in the process. All 12 of the park units 
we visited have completed a business plan, and many officials stated 
that the plans are useful, by helping them better identify future 
budget needs. Park Service officials stated that they are still 
refining their processes for developing these plans. 

* The COA was developed in 2004 to assist park unit managers in 
identifying efficiencies for carrying out their core mission. Through a 
step-by-step process, park unit, regional, and headquarters officials 
evaluate the park unit's core mission, and identify essential park unit 
activities and associated funding levels. Although the COA is in the 
early stages of development, the Park Service plans to have all units 
complete an analysis by the end of fiscal year 2011. Three of the 12 
park units we visited have completed--or are in the process of 
completing--a COA. Park unit officials noted that the preliminary 
results have helped them better determine where efficiencies in 
operations might accrue, but it is too early to determine what benefits 
their park units will realize from the process. 

* Park Service headquarters developed the Park Scorecard in 2004 to 
provide an overarching summary of each park unit's fiscal and 
operational condition and managerial performance. The Park Scorecard 
analyzes individual park units by comparing them to one another based 
on broad financial-, organizational-, recreational-, and resource- 
management criteria. Although it is still being developed, the Park 
Service budget office stated that the Park Scorecard played a role in 
allocating the $12.5 million that the conference report accompanying 
the fiscal year 2005 ONPS Account had directed at visitor service 
programs. The Park Service plans to refine the Park Scorecard to better 
identify, evaluate, and support future budget increases for park units. 

Background: 

The Park Service is the caretaker of many of the nation's most precious 
natural and cultural resources. Today, more than 130 years after the 
first national park was created, the National Park System has grown to 
include 390 units covering over 84 million acres in 49 states, the 
District of Columbia, American Samoa, Guam, Puerto Rico, Saipan, and 
the Virgin Islands. The Park Service manages its responsibilities 
through headquarters, seven regional offices, and its individual park 
units. These units include a diverse mix of sites--now in more than 20 
different categories. These include (1) national parks, such as 
Yellowstone in Idaho, Montana, and Wyoming; Yosemite in California; and 
Grand Canyon in Arizona; (2) national historical parks, such as 
Harper's Ferry in Maryland, Virginia, and West Virginia; and Valley 
Forge in Pennsylvania; (3) national battlefields, such as Antietam in 
Maryland; (4) national historic sites such as Ford's Theatre in 
Washington, D.C; and Carl Sandburg's home in North Carolina; (5) 
national monuments, such as Fort Sumter in South Carolina; and the 
Statue of Liberty in New York and New Jersey; (6) national preserves, 
such as Yukon-Charley Rivers in Alaska; and (7) national recreation 
areas, such as Lake Mead in Arizona and Nevada. Some of these park 
units, such as Yellowstone, cover millions of acres and employ hundreds 
of employees. Other units, such as Ford's Theatre which encompasses two 
historic structures, are small and have few employees. 

The Park Service's mission is to preserve unimpaired the natural and 
cultural resources of the National Park System for the enjoyment of 
this and future generations. Its objectives include providing for the 
use of the park units by supplying appropriate visitor services and 
infrastructure (e.g., roads and facilities) to support these services. 
In addition, the Park Service protects its natural and cultural 
resources (e.g., preserving wildlife habitat and Native American sites) 
so that they will be unimpaired for the enjoyment of future 
generations. Due to the complexity of its mission, large land area, and 
the number and diversity of its park units, the Park Service faces many 
challenges--including a deteriorating infrastructure (due in part to an 
estimated $5 billion maintenance backlog), threats to preserving 
natural and cultural resources, and challenges to maintaining visitor 
services. Moreover, despite fiscal constraints facing all federal 
agencies, the number of park units continues to expand--12 units, 
mostly small units, have been authorized since fiscal year 2001. 

The Park Service receives its main source of funds to operate park 
units through appropriations from the ONPS account. The Park Service 
chooses to allocate funds to its park units in two categories-- 
allocations for daily operations, and allocations for specific, non- 
recurring projects. Daily operations allocation levels for individual 
park units are built on park units' allocation level for the prior 
year. Park units receive an increased allocation for required pay 
increases and request specific increases for new or higher levels of 
ongoing operating responsibilities, such as adding additional law 
enforcement rangers for increased homeland security protection. Park 
Service headquarters takes the initiative in requesting the funding for 
all required employee pay increases on a service wide basis. However, 
for park-specific increases, once funding is appropriated, park units 
compete against one another through their regional office and 
headquarters for the available funds. 

As is true for other government operations, the cost of operating park 
units will increase each year due to required pay increases, the rising 
costs of benefits for federal employees, and rising overhead expenses 
such as utilities. The Park Service may provide additional allocations 
for daily operations to cover all or part of these cost increases. If 
the continuation of operations at the previous year's level would 
require more funds than are available, park units must adjust either by 
identifying efficiencies within the park unit, use other authorized 
funding sources such as fees or donations to fund the activity, or 
reduce services. Upon receiving their allocations for daily operations 
each year, park unit managers exercise a great deal of discretion in 
setting operational priorities. Typically, these decisions involve 
trade-offs among four categories of spending: (1) visitor services 
(e.g., opening a campground or adding law enforcement staff), (2) 
resource management (e.g., monitoring the condition of threatened 
species or water quality), (3) maintenance needs (e.g., repairing a 
trail), and (4) park administration and support (e.g., updating 
computer systems or attending training). Generally, about 80 percent of 
each park unit's allocation for daily operations is used to pay the 
salaries and benefits of permanent employees (personnel costs). Park 
units use the remainder of their allocations for daily operations for 
overhead expenses such as utilities, supplies, and training, among 
other things. 

In addition to daily operations funding, the Park Service also 
allocates project-related funding to park units for specific purposes 
to support its mission. For example, activities completed with Cyclic 
Maintenance and Repair and Rehabilitation funds include re-roofing or 
re-painting buildings, overhauling engines, refinishing hardwood 
floors, replacing sewer lines, repairing building foundations, and 
rehabilitating campgrounds and trails. Park units compete for project 
allocations by submitting requests to their respective regional office 
and headquarters. Regional and headquarters officials determine which 
projects to fund. While an individual park unit may receive funding for 
several projects in one year, it may receive none the next. 

Park units may also receive revenue from outside sources such as 
visitor fees and donations--although there are often limitations on how 
these revenues may be used. Since 1996, the Congress has provided the 
park units with authority to collect fees from visitors and retain 
these funds for use on projects to enhance recreation and visitor 
enjoyment, among other things.[Footnote 3] Since 2002, the Park Service 
has required park units to spend the majority of their visitor fees on 
deferred maintenance projects, such as road or building repair. The 
Park Service also receives revenue from concessionaires under contract 
to perform services at park units--such as operating a lodge--and cash 
or non-monetary donations from non-profit organizations or individuals, 
among others. For example, as we reported in July 2003, about 200 
cooperating associations and "friends groups" helped support 347 park 
units, contributing over $200 million from 1997 to 2001.[Footnote 4] 
These funds may vary from year to year and, in the case of donations, 
may be accompanied by stipulations on how the funds may be used. 

Figure 1 illustrates the principal funding sources used by park units 
to perform operations. 

Figure 1: Principal Operations Funding Sources for National Park Units: 

[See PDF for image] 

Note: Offsetting collections, such as the fees that park units collect 
and retain, reimbursables, and the gift authority authorizing the park 
units to retain donations and contributions, are a form of 
appropriation. 

[End of figure] 

Appropriations for the Operation of the National Park System Account 
Increased Overall from Fiscal Years 2001 to 2005; the Total Allocation 
for Daily Operations Declined Overall and the Total Allocation for 
Projects Increased Overall When Adjusted For Inflation: 

Total appropriations for the ONPS account increased overall in both 
nominal and inflation-adjusted dollars from fiscal year 2001 through 
2005. However, the agency allocated funds such that, in inflation-
adjusted terms, the total allocation for daily operations from these 
appropriations fell slightly overall, while the total allocation for 
projects increased overall. About 56 percent of the individual park 
units and about 74 percent of the more highly visited parks experienced 
an overall decline in their allocation for daily operations when 
adjusted for inflation during this period. The agency allocated funding 
for projects at a higher rate than for daily operations. 

Appropriations for the Operation of the National Park System Account 
Increased Overall from Fiscal Years 2001 to 2005: 

As shown in figure 2, overall appropriations for the ONPS account-- 
including the amounts the Park Service allocated for daily operations 
and projects--rose in both nominal and inflation-adjusted dollars 
overall from fiscal years 2001 through 2005. Nominal dollars increased 
from about $1.4 billion in fiscal year 2001 to almost $1.7 billion in 
fiscal year 2005, an average annual increase of about 4.9 percent 
(i.e., about $68 million per year). After adjusting these amounts for 
inflation, the average annual increase was about 1.3 percent or almost 
$18 million per year.[Footnote 5] By contrast, the Park Service's 
overall budget authority increased to about $2.7 billion in 2005 from 
about $2.6 billion in 2001, an average increase of about 1 percent per 
year. In inflation adjusted dollars, the total budget authority fell by 
an average of about 2.5 percent per year. 

Figure 2: Appropriations for the Operation of the National Park System 
Account from Fiscal Years 2001 through 2005: 

[See PDF for image] 

Note: Totals for ONPS do not include Park Service spending authority 
for offsetting collections, in nominal terms, of $17 million in fiscal 
year 2001, $18 million in fiscal year 2002, $17 million in fiscal year 
2003, $21 million in fiscal year 2004, and $21 million in fiscal year 
2005.These offsetting collections are reimbursements from other federal 
or state entities that are credited to this account. Visitor fee 
revenues, which are deposited in a separate account, are included in 
figure 7. 

[End of figure] 

With the increases in appropriations for the ONPS account, the Park 
Service increased allocations for projects and other support programs 
such as the Repair and Rehabilitation, Cyclic Maintenance, and 
Inventory and Monitoring programs, among others. The overall allocation 
for daily operations, on the other hand, declined slightly on average 
when adjusted for inflation. 

Overall Allocations for Daily Operations for Park Units Declined 
Slightly When Adjusted For Inflation: 

The Park Service's total allocation for daily operations for park units 
increased overall in nominal dollars but the total allocation fell 
slightly when adjusted for inflation from fiscal years 2001 through 
2005. As illustrated in figure 3, overall allocations for daily 
operations for park units rose from about $903 million in fiscal year 
2001 to almost $1.03 billion in fiscal year 2005--an average annual 
increase of about $30 million, or about 3 percent. After adjusting for 
inflation, the allocation for daily operations fell slightly from about 
$903 million in 2001 to about $893 million in 2005--an average annual 
decline of about $2.5 million, or 0.3 percent. The fiscal year 2005 
appropriation for the ONPS account included an additional $37.5 million 
over the amounts proposed by the House and Senate for the ONPS account, 
to be used for daily operations. The conference report accompanying the 
appropriation stated that the additional amount was to be used for (1) 
a service-wide increase of $25 million and (2) $12.5 million for 
visitor services programs at specific park units. 

Figure 3: Overall Allocations for Daily Operations for Park Units from 
Fiscal Years 2001 through 2005: 

[See PDF for image] 

Note: Funding for daily operations include amounts for park units only, 
and do not include allocations for the national trail system, other 
field offices, and affiliated areas. Appendix II contains figures for 
daily operations for these. 

[End of figure] 

Daily Operations Allocations for Many Park Units Declined after 
Adjusting for Inflation: 

Of the 380 park units that received funding for daily operations for 
the entire period of our review, 212 (or about 56 percent), saw an 
average annual decline in inflation-adjusted terms of about 2 
percent.[Footnote 6] The declines ranged from less than 0.1 percent at 
the Mary McLeod Bethune Council House National Historic Site to about 
5.2 percent at Petroglyph National Monument.[Footnote 7] The remaining 
168 park units' daily operations funding trends were either flat or 
increasing from 2001 through 2005, with the largest increase being 
about 39 percent at Rosie the Riveter/WWII Home Front National Historic 
Park. Figure 4 shows the number of park units and their respective 
average annual percent changes in daily operations allocations from 
2001 through 2005. 

Figure 4: Number of Park Units for Different Average Annual Percent 
Changes in Inflation-Adjusted Terms in Allocations for Daily Operations 
from Fiscal Years 2001 through 2005: 

[See PDF for image] 

Note: This analysis includes 380 park units of varying sizes; 
therefore, the average annual change in daily operations allocations 
from fiscal year 2001 to 2005 may affect park units differently. 

[End of figure] 

The park units for which figure 4 shows declines in inflation-adjusted 
dollars allocated for daily operations include most of the park units 
with large allocations for daily operations. These 212 park units 
represented about 69 percent of the total allocation for daily 
operations for all park units in fiscal year 2001 and about 64 percent 
in fiscal year 2005. Conversely, the 168 park units for which figure 4 
shows increases in inflation-adjusted terms in allocations for daily 
operations represented about 31 percent of the total allocations for 
daily operations for all units in fiscal year 2001 and about 36 percent 
in fiscal year 2005. 

Most of the Highly Visited Park Units Saw a Decline in Allocations for 
Daily Operations after Adjusting for Inflation: 

About seventy-four percent of the 83 most highly visited park units-- 
over one million recreation visits per year--showed an average annual 
decline in inflation-adjusted terms in daily operations allocations 
from fiscal years 2001 through 2005.[Footnote 8] For example, 
allocations for daily operations at Lake Meade National Recreation Area 
(includes Parashant National Monument), Hawaii Volcanoes National Park, 
and Olympic National Park fell in real terms by about 4 percent, 3 
percent, and 2 percent, respectively. In contrast, about 47 percent of 
the park units with less than 200,000 recreation visits per year saw 
declines in real terms of the allocations for daily operations. Table 1 
shows the number and percentage of park units receiving average annual 
percentage increases and declines in inflation adjusted allocations for 
daily operations by categories of average annual recreation visits. 

Table 1: Number and Percentage of Park Units with Overall Declines or 
Increases in Allocations for Daily Operations when Adjusted for 
Inflation Based on Average Recreation Visits from Fiscal Years 2001 
through 2005: 

Recreation visits: More than 1 million; 
Total number: 83; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Number: 61; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Percent: 74; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Number: 22; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Percent: 27. 

Recreation visits: 200,001 to 1,000,000; 
Total number: 106; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Number: 63; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Percent: 59; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Number: 43; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Percent: 41. 

Recreation visits: 0 to 200,000; 
Total number: 169; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Number: 80; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Percent: 47; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Number: 89; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Percent: 53. 

Recreation visits: Total; 
Total number: 358; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Number: 204; 
Park units with overall declines in inflation-adjusted terms in daily 
operations allocations: Percent: 57; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Number: 154; 
Park units with overall increases in inflation-adjusted terms in daily 
operations allocations: Percent: 43. 

Source: GAO analysis of Park Service data. 

Note: Of the 380 park units in existence from fiscal years 2001 through 
2005, 22 do not keep statistics on visitation for the 5-year period of 
our analysis, so they were excluded from this analysis. Recreation 
visits are based on park units' reported annual averages from fiscal 
years 2001 through 2005. Changes in funding for daily operations are 
based on the average annual change in funding levels from fiscal years 
2001 through 2005 adjusted for inflation. 

[End of table] 

Allocations for Projects and Other Support Programs Increased Overall 
Even after Adjusting for Inflation: 

Allocations for projects and other support programs increased overall 
in both nominal and inflation-adjusted dollars.[Footnote 9] As figure 5 
illustrates, these allocations rose from about $478 million in 2001 to 
about $641 million in 2005--an average annual increase of about 7.7 
percent, or about $36.5 million. When adjusted for inflation, the 
increase was 3.9 percent, or about $18.7 million per year. Figure 5 
shows allocation trends of projects and other support programs for the 
Park Service from fiscal years 2001 through 2005. 

Figure 5: Project and Other Support Program Allocations from Fiscal 
Years 2001 through 2005: 

[See PDF for image] 

[End of figure] 

Three programs that include project funding for individual park units-
-Cyclic Maintenance, Repair and Rehabilitation, and Inventory and 
Monitoring--account for over half of the increase for the project and 
support program allocations. As a percentage of total project and 
support program funding, funding for these programs rose to 31 percent 
in 2005 from 23 percent in 2001. For example, cyclic maintenance 
program funding increased from $34.5 million in 2001 to $62.8 million 
in 2005--an average annual increase of 16.2 percent in nominal terms or 
12.1 percent when adjusted for inflation. Increases in the Cyclic 
Maintenance and Repair and Rehabilitation programs reflect an emphasis 
on the effort for the Park Service to reduce its estimated $5 billion 
maintenance backlog. Increases in the Inventory and Monitoring Program 
reflect an emphasis on protecting natural resources primarily through 
an initiative called the Natural Resource Challenge.[Footnote 10] Table 
2 shows funding for these three programs from fiscal years 2001 through 
2005. 

Table 2: Allocations for Cyclic Maintenance, Repair and Rehabilitation, 
and Inventory and Monitoring Programs from Fiscal Years 2001 through 
2005: 

In millions. 

Cyclic Maintenance[A]: 

Nominal; 
2001: $34.5; 
2002: $32.3; 
2003: $51.9; 
2004: $65.1; 
2005: $62.8; 
Average annual change (percent): 16.2%. 

Inflation-adjusted; 
2001: $34.5; 
2002: $31.3; 
2003: $48.9; 
2004: $58.8; 
2005: $85.4; 
Average annual change (percent): 12.1%. 

Repair and Rehabilitation[B]: 

Nominal; 
2001: $58.5; 
2002: $72.6; 
2003: $84.4; 
2004: $94.4; 
2005: $95.1; 
Average annual change (percent): 12.9%. 

Inflation-adjusted; 
2001: $58.5; 
2002: $70.3; 
2003: $79.5; 
2004: $85.4; 
2005: $82.6; 
Average annual change (percent): 9.0%. 

Inventory and Monitoring Program: 

Nominal; 
2001: $17.5; 
2002: $21.8; 
2003: $32.4; 
2004: $36.9; 
2005: $39.6; 
Average annual change (percent): 22.6%. 

Inflation-adjusted; 
2001: $17.5; 
2002: $21.1; 
2003: $30.5; 
2004: $33.4; 
2005: $34.4; 
Average annual change (percent): 18.3%. 

Source: GAO analysis of Park Service data. 

[A] Cyclic Maintenance figures include those for both the regular 
Cyclic Maintenance program and the Cyclic Maintenance for Historic 
Properties program. 

[B] Repair and Rehabilitation figures include those for projects and 
for maintenance systems. 

[End of table] 

Allocations for other support programs had smaller increases or 
declined. For example, allocations for central offices--seven regional 
offices and the headquarters office--increased by less than 1 percent 
on an average annual basis when adjusted for inflation. 

Between fiscal years 2001 and 2005, the share of the ONPS account 
allocated to daily operations fell slightly, indicating a slight change 
in emphasis toward project-related programs for park units. In fiscal 
year 2001, about 65 percent of the Park Service's appropriations from 
the ONPS account were allocated for daily operations. By 2004, the 
allocation for daily operations had fallen to about 60 percent, 
increasing slightly to about 62 percent for fiscal year 2005. Figure 6 
shows the trend for the ratio of daily operations allocations to 
overall funding for operations for fiscal years 2001 through 2005. 

Figure 6: Park Service Allocations for Daily Operations as a Percent of 
the Operation of the National Park System Account from Fiscal Years 
2001 through 2005: 

[See PDF for image] 

[End of figure] 

Visitor Fees Also Used to Support Park Units: 

As shown in figure 7, total visitor fees collected by the Park Service 
increased from about $140 million in 2001 to about $147 million in 2005 
(an average annual increase of about 1 percent); however, in inflation-
adjusted dollars, the fees fell to about $127 million in 2005 (an 
average annual decline of over 2 percent). Overall, the Park Service 
collected about $717 million in visitor fees in addition to their 
annual appropriation for operations from 2001 through 2005--an average 
of about $143 million per year. When adjusted for inflation, these 
visitor fees total about $670 million--an average of about $134 million 
per year. Visitor fee revenue depends on several factors, including the 
number of visitors to each park unit, the number of national passes 
purchased, and the amount each park charges for entry and services. 

Figure 7: Park Service Visitor Fee Revenue from Fiscal Years 2001 
through 2005: 

[See PDF for image] 

Note: Visitor fee revenues include revenue collected from the 
Recreational Fee Program and the National Parks Passport program. 

[End of figure] 

Allocation Trends for Projects and Daily Operations at 12 High- 
Visitation Park Units Varied, but All 12 Parks Reported Reduced 
Services and an Increasing Reliance on Other Authorized Sources to 
Supplement Daily Operations Allocations: 

All 12 park units we visited received allocations for projects from 
fiscal years 2001 through 2005 that varied among years and among park 
units. Allocations for daily operations for the 12 park units we 
visited also varied. On an average annual basis, each unit experienced 
an increase in daily operations allocations, but most experienced a 
decline in inflation-adjusted terms. Officials at each park believed 
that their daily operations allocations were not sufficient to address 
increases in operating costs and new Park Service management 
requirements. To manage within available funding resources, park unit 
managers also reported that, to varying degrees, they made trade-offs 
among the operational activities--which in some cases resulted in 
reducing services in areas such as education, visitor and resource 
protection, and maintenance activities. Park officials also reported 
that they increasingly relied on volunteers and other authorized 
funding sources to provide operations and services that were previously 
paid with allocations for daily operations from the ONPS account. 

All 12 Park Units Received Allocations For Projects: 

Each of the 12 park units received allocations for projects from 2001 
through 2005.[Footnote 11] Park units use project-related allocations 
for such things as rehabilitating structures, roads, and trails and 
inventorying and monitoring natural resources. The allocations for 
projects at the 12 park units totaled $76.8 million from 2001 through 
2005. Allocations varied from park to park and year to year because 
these allocations support non-recurring projects for which park units 
are required to compete and obtain approval from Park Service 
headquarters or regional offices. For example, at Grand Canyon National 
Park, allocations for projects between 2001 and 2005 totaled $6.7 
million. However during that time the amount fluctuated from $824,000 
in 2001 to $1.9 million in 2004 and $914,000 in 2005. Table 3 shows 
project-related allocations and their fluctuations from fiscal years 
2001 through 2005 for the 12 park units we visited. 

Table 3: Project Allocations for 12 Selected Park Units, Fiscal Years 
2001 through 2005: 

[See PDF for image] 

Legend: 

NP = National Park:  
NMP = National Military Park:  
NMem = National Memorial: 

Source: GAO analysis of Park Service data. 

[End of table] 

The following examples illustrate projects that have been completed 
using these funds: 

* Grand Canyon National Park received a total of $6.7 million in 
project allocations. Projects included $494,000 to repair and 
rehabilitate the North Bass trail; $175,000 to rehabilitate the Mather 
Amphitheater, which hosts evening ranger programs; and $31,000 to 
survey the declining northern leopard frog population. 

* Grand Teton National Park received a total of $4.4 million in project 
allocations. Projects included $40,600 to perform cyclic maintenance on 
three historic log cabins; $280,000 for bison demographic disease 
surveillance; and $313,800 to rehabilitate a water sewer line. 

* Acadia National Park received a total of $3.6 million in project 
allocations. In 2002, the park obtained $17,800 through the Natural 
Resource Preservation Program to work with the U.S. Fish and Wildlife 
Service and others to determine baseline information about the ecology 
and to assess the population status of wintering purple sandpipers. 

* Gettysburg National Military Park received a total of $11.6 million 
in project allocations. Projects included $444,000 to replace failing 
septic systems in the park; $129,000 to replace water lines in historic 
structures; $385,000 to repair observation towers; and $92,000 to 
repair historic fences on Little Roundtop--a highly-visited civil war 
battle site. 

* Yellowstone National Park received a total of $3.2 million in project 
allocations. Projects included $170,000 to repair thermal area 
walkways, and $290,000 to rehabilitate roads in the Madison area of the 
park. 

As with allocations for projects from fiscal years 2001 through 2005, 
allocations for daily operations for the 12 park units we visited also 
varied. 

Allocations for Daily Operations at Most Park Units Declined When 
Adjusted For Inflation: 

All 12 park units experienced an annual average increase in allocations 
for daily operations, however when adjusted for inflation, 8 of the 12 
parks we visited experienced a decline ranging from less than one 
percent to approximately 3 percent. For example, Yosemite National 
Park's daily operations allocations increased from $22,583,000 in 2001 
to $22,714,000 in 2005, less than an average of 1 percent per year. 
However, when adjusted for inflation, the park's allocation for daily 
operations fell by about 3 percent per year. Daily operations 
allocations at the remaining four parks increased after adjusting for 
inflation, ranging from less than 1 percent to about 7 percent. For 
example, Acadia National Park's daily operations allocations increased 
from $4,279,000 in fiscal year 2001 to $6,498,000 in fiscal year 2005, 
an average annual increase of about 11 percent in nominal terms and 
about 7 percent when adjusted for inflation. Park officials explained 
that although the daily operations allocation substantially increased 
over this period, most of the increase was for new or additional 
operations. To illustrate, in 2002, Acadia acquired the former Schoodic 
Naval Base. The increases in allocations for daily operations were to 
accommodate this added responsibility rather than for maintaining 
operations that were in existence prior to the acquisition. In 
addition, park officials at Mount Rushmore National Memorial reported 
that most of their increases for daily operations were to increase law 
enforcement staff to address new homeland security measures following 
the September 11, 2001, attacks. Tables 4 and 5 show allocations for 
daily operations and average annual increases or declines for the 12 
park units we visited, from fiscal years 2001 through 2005. 

Table 4: Daily Operations Allocations at Selected Park Units from 
Fiscal Years 2001 through 2005 in Nominal Dollars: 

[See PDF for image] 

Legend: 

NP=National Park NMP=National Military Park NMem=National Memorial: 

Source: GAO analysis of Park Service data from 12 selected park units. 

[End of table] 

Table 5: Daily Operations Allocations at Selected Parks Units from 
Fiscal Years 2001 through 2005 in Inflation-Adjusted Dollars: 

Dollars in thousands. 

Park unit: Acadia NP; 
Daily operations allocations: 2001: $4,279; 
Daily operations allocations: 2002: $5,525; 
Daily operations allocations: 2003: $6,019; 
Daily operations allocations: 2004: $5,741; 
Daily operations allocations: 2005: $5,041; 
Average annual change (percent): 7.2%. 

Park unit: Badlands NP; 
Daily operations allocations: 2001: $2,996; 
Daily operations allocations: 2002: $2,957; 
Daily operations allocations: 2003: $2,887; 
Daily operations allocations: 2004: $2,880; 
Daily operations allocations: 2005: $2,966; 
Average annual change (percent): -0.25%. 

Park unit: Bryce Canyon NP; 
Daily operations allocations: 2001: $2,607; 
Daily operations allocations: 2002: $2,586; 
Daily operations allocations: 2003: $2,527; 
Daily operations allocations: 2004: $2,418; 
Daily operations allocations: 2005: $2,403; 
Average annual change (percent): -2.0%. 

Park unit: Gettysburg NMP; 
Daily operations allocations: 2001: $5,044; 
Daily operations allocations: 2002: $5,011; 
Daily operations allocations: 2003: $4,896; 
Daily operations allocations: 2004: $4,679; 
Daily operations allocations: 2005: $4,760; 
Average annual change (percent): -1.4%. 

Park unit: Grand Canyon NP; 
Daily operations allocations: 2001: $18,199; 
Daily operations allocations: 2002: $17,999; 
Daily operations allocations: 2003: $17,828; 
Daily operations allocations: 2004: $16,790; 
Daily operations allocations: 2005: $16,426; 
Average annual change (percent): -2.5%. 

Park unit: Grand Teton NP; 
Daily operations allocations: 2001: $8,559; 
Daily operations allocations: 2002: $8,393; 
Daily operations allocations: 2003: $8,560; 
Daily operations allocations: 2004: $8,372; 
Daily operations allocations: 2005: $8,933; 
Average annual change (percent): 1.1%. 

Park unit: Mt. Rushmore NMem; 
Daily operations allocations: 2001: $2,473; 
Daily operations allocations: 2002: $2,451; 
Daily operations allocations: 2003: $2,736; 
Daily operations allocations: 2004: $2,998; 
Daily operations allocations: 2005: $3,236; 
Average annual change (percent): 7.0%. 

Park unit: Sequoia and Kings Canyon NP; 
Daily operations allocations: 2001: $12,234; 
Daily operations allocations: 2002: $12,622; 
Daily operations allocations: 2003: $12,269; 
Daily operations allocations: 2004: $11,668; 
Daily operations allocations: 2005: $11,553; 
Average annual change (percent): -1.4%. 

Park unit: Shenandoah NP; 
Daily operations allocations: 2001: $10,253; 
Daily operations allocations: 2002: $10,152; 
Daily operations allocations: 2003: $9,929; 
Daily operations allocations: 2004: $9,196; 
Daily operations allocations: 2005: $9,034; 
Average annual change (percent): -3.1%. 

Park unit: Yellowstone NP; 
Daily operations allocations: 2001: $25,122; 
Daily operations allocations: 2002: $26,245; 
Daily operations allocations: 2003: $26,078; 
Daily operations allocations: 2004: $25,426; 
Daily operations allocations: 2005: $25,910; 
Average annual change (percent): 0.78%. 

Park unit: Yosemite NP; 
Daily operations allocations: 2001: $22,583; 
Daily operations allocations: 2002: $22,402; 
Daily operations allocations: 2003: $21,811; 
Daily operations allocations: 2004: $20,915; 
Daily operations allocations: 2005: $19,719; 
Average annual change (percent): -3.3%. 

Park unit: Zion NP; 
Daily operations allocations: 2001: $5,605; 
Daily operations allocations: 2002: $5,787; 
Daily operations allocations: 2003: $5,668; 
Daily operations allocations: 2004: $5,433; 
Daily operations allocations: 2005: $5,342; 
Average annual change (percent): -1.2. 

Legend: 

NP=National Park; 
NMP=National Military Park; 
NMem=National Memorial: 

Source: GAO analysis of Park Service data from 12 selected park units. 

[End of table] 

Increases in Operating Costs and New Park Service Management 
Requirements May Affect Daily Operations: 

Despite increases in inflation-adjusted allocations for daily 
operations at 4 of the 12 park units visited, officials at all 12 park 
units explained that this funding did not increase commensurately with 
increases in operating costs and new management requirements. Park unit 
officials explained that these factors have reduced their flexibility 
in addressing other park priorities. 

Operating Cost Increases: 

Park unit officials reported that required salary increases exceeded 
the allocation for daily operations, and rising utility costs have 
reduced their flexibility in managing daily operations allocations. 
Park Service headquarters officials reported that from 2001 through 
2005, the Park Service paid personnel cost increases enacted by the 
Congress. For example, from fiscal years 2001 through 2005, Congress 
enacted salary increases of about 4 percent per year for federal 
employees. Park Service officials reported that the Park Service 
covered these salary increases with appropriations provided in the ONPS 
account. The Park Service allocated amounts to cover about half of the 
required increases and park units had to reduce spending to compensate 
for the difference. The consequence of the increases was that park 
units had to eliminate or defer spending in order to accommodate the 
increases. For example, officials at Gettysburg National Military Park 
stated that they achieved personnel cost savings by taking a number of 
actions to reduce spending, including refraining from filling--and 
delaying filling--several permanent and seasonal vacancies. Park 
officials said they estimate the personnel cost savings from 2002 
through 2005 was about $1,434,781, in inflation-adjusted terms. Total 
personnel expenditures at the park unit declined from $4,460,000 in 
2001 to $4,143,000 in 2005--an average annual decline of about 2 
percent, in inflation-adjusted terms.[Footnote 12] In contrast, at 
Mount Rushmore National Memorial, total personnel expenditures 
increased from $2,014,000 in 2001 to $2,552,000 in 2005--or an average 
of about 6 percent per year. Officials said that the increase was due 
to required salary increases for permanent staff and expenditures on 
new personnel hired for homeland security measures. As shown in table 
6, expenditures for personnel from 2001 through 2005 increased for 
seven park units, and declined for the other five units, after 
adjusting for inflation. 

Table 6: Average Annual Change in Personnel Expenditures and Personnel 
Funded with Allocations from Daily Operations from Fiscal Years 2001 
through 2005 in Inflation-Adjusted Dollars: 

Dollars in thousands. 

Park unit: Acadia NP; 
Personnel expenditures (in thousands): 2001: $3,524; 
Personnel expenditures (in thousands): 2005: $4,613; 
Personnel expenditures (in thousands): Average annual change (percent): 
7.0%; 
Personnel (FTEs[A]): 2001: 69; 
Personnel (FTEs[A]): 2005: 83; 
Personnel (FTEs[A]): Average annual change (percent): 4.7%. 

Park unit: Badlands NP; 
Personnel expenditures (in thousands): 2001: $2,273; 
Personnel expenditures (in thousands): 2005: $2,256; 
Personnel expenditures (in thousands): Average annual change 
(percent): -0.2%; 
Personnel (FTEs[A]): 2001: 48; 
Personnel (FTEs[A]): 2005: 41; 
Personnel (FTEs[A]): Average annual change (percent): -3.7%. 

Park unit: Bryce Canyon NP; 
Personnel expenditures (in thousands): 2001: $2,204; 
Personnel expenditures (in thousands): 2005: $2,002; 
Personnel expenditures (in thousands): Average annual change 
(percent): -2.4%; 
Personnel (FTEs[A]): 2001: 40; 
Personnel (FTEs[A]): 2005: 35; 
Personnel (FTEs[A]): Average annual change (percent): -3.0%. 

Park unit: Gettysburg NMP; 
Personnel expenditures (in thousands): 2001: $4,460; 
Personnel expenditures (in thousands): 2005: $4,143; 
Personnel expenditures (in thousands): Average annual change 
(percent): -1.8%; 
Personnel (FTEs[A]): 2001: 84; 
Personnel (FTEs[A]): 2005: 69; 
Personnel (FTEs[A]): Average annual change (percent): -4.7%. 

Park unit: Grand Canyon NP; 
Personnel expenditures (in thousands): 2001: $13,409; 
Personnel expenditures (in thousands): 2005: $12,614; 
Personnel expenditures (in thousands): Average annual change 
(percent): -1.5%; 
Personnel (FTEs[A]): 2001: 231; 
Personnel (FTEs[A]): 2005: 227; 
Personnel (FTEs[A]): Average annual change (percent): -0.4%. 

Park unit: Grand Teton NP; 
Personnel expenditures (in thousands): 2001: $6,509; 
Personnel expenditures (in thousands): 2005: $6,724; 
Personnel expenditures (in thousands): Average annual change (percent): 
0.8%; 
Personnel (FTEs[A]): 2001: 132; 
Personnel (FTEs[A]): 2005: 121; 
Personnel (FTEs[A]): Average annual change (percent): -2.2%. 

Park unit: Mt. Rushmore NMem; 
Personnel expenditures (in thousands): 2001: $2,014; 
Personnel expenditures (in thousands): 2005: $2,552; 
Personnel expenditures (in thousands): Average annual change (percent): 
6.1%; 
Personnel (FTEs[A]): 2001: 42; 
Personnel (FTEs[A]): 2005: 42; 
Personnel (FTEs[A]): Average annual change (percent): 0.1%. 

Park unit: Sequoia and Kings Canyon NP; 
Personnel expenditures (in thousands): 2001: $9,164; 
Personnel expenditures (in thousands): 2005: $9,202; 
Personnel expenditures (in thousands): Average annual change (percent): 
0.1%; 
Personnel (FTEs[A]): 2001: 201; 
Personnel (FTEs[A]): 2005: 188; 
Personnel (FTEs[A]): Average annual change (percent): -1.6%. 

Park unit: Shenandoah NP; 
Personnel expenditures (in thousands): 2001: $8,578; 
Personnel expenditures (in thousands): 2005: $7,617; 
Personnel expenditures (in thousands): Average annual change 
(percent): -2.9%; 
Personnel (FTEs[A]): 2001: 180; 
Personnel (FTEs[A]): 2005: 133; 
Personnel (FTEs[A]): Average annual change (percent): -7.3%. 

Park unit: Yellowstone NP; 
Personnel expenditures (in thousands): 2001: $17,587; 
Personnel expenditures (in thousands): 2005: $19,161; 
Personnel expenditures (in thousands): Average annual change (percent): 
2.2%; 
Personnel (FTEs[A]): 2001: 338; 
Personnel (FTEs[A]): 2005: 351; 
Personnel (FTEs[A]): Average annual change (percent): 1.0%. 

Park unit: Yosemite NP; 
Personnel expenditures (in thousands): 2001: $17,602; 
Personnel expenditures (in thousands): 2005: $17,748; 
Personnel expenditures (in thousands): Average annual change (percent): 
0.2%; 
Personnel (FTEs[A]): 2001: 361; 
Personnel (FTEs[A]): 2005: 317; 
Personnel (FTEs[A]): Average annual change (percent): -3.2%. 

Park unit: Zion NP; 
Personnel expenditures (in thousands): 2001: $4,268; 
Personnel expenditures (in thousands): 2005: $4,422; 
Personnel expenditures (in thousands): Average annual change (percent): 
9.0%; 
Personnel (FTEs[A]): 2001: 83; 
Personnel (FTEs[A]): 2005: 90; 
Personnel (FTEs[A]): Average annual change (percent): 2.1. 

Source: GAO analysis of Park Service data from 12 selected park units. 

[A] A full-time equivalent (FTE) is a workforce measure equal to one 
work year. 

[End of table] 

Personnel costs (salaries and benefits) comprised an average of 74 to 
89 percent of the total operating expenses at these 12 park units; 
therefore officials said that it is difficult to offset increases in 
personnel costs without reducing personnel. Officials at several park 
units told us that since 2001, they have refrained from filling vacant 
positions or have filled them with lower-graded or seasonal employees. 
For example, in an effort to continue to perform activities that 
directly impact visitors--such as cleaning restrooms and answering 
visitor questions--officials at Sequoia and Kings Canyon National Parks 
stated that they left several high-graded positions unfilled in order 
to hire a lower graded workforce to perform these basic operational 
duties. Officials at most park units also told us that when positions 
were left vacant, the responsibilities of the remaining staff generally 
increased in order to fulfill park obligations. 

Park Service budget officials told us that they expect personnel costs 
to continue to grow faster than any increases in allocations for 
personnel in fiscal years 2006 and 2007. As a result, they said that in 
some cases the parks may choose to hire seasonal employees or contract 
out more duties than fill vacant positions. Table 7 shows the average 
annual percentage of daily operations funding that the 12 park units we 
visited spent on personnel costs. 

Table 7: Percentage of Allocations for Daily Operations Spent on 
Personnel from Fiscal Years 2001 through 2005: 

Park unit: Acadia NP; 
2001: 84%; 
2002: 75%; 
2003: 77%; 
2004: 81%; 
2005: 84%; 
Average 2001-2005: 80%. 

Park unit: Badlands NP; 
2001: 77%; 
2002: 79%; 
2003: 82%; 
2004: 87%; 
2005: 80%; 
Average 2001-2005: 81%. 

Park unit: Bryce NP; 
2001: 86%; 
2002: 82%; 
2003: 78%; 
2004: 83%; 
2005: 85%; 
Average 2001-2005: 83%. 

Park unit: Gettysburg NP; 
2001: 89%; 
2002: 90%; 
2003: 87%; 
2004: 89%; 
2005: 88%; 
Average 2001-2005: 89%. 

Park unit: Grand Canyon NP; 
2001: 71%; 
2002: 72%; 
2003: 77%; 
2004: 79%; 
2005: 79%; 
Average 2001-2005: 76%. 

Park unit: Grand Teton NP; 
2001: 79%; 
2002: 77%; 
2003: 76%; 
2004: 85%; 
2005: 78%; 
Average 2001-2005: 79%. 

Park unit: Mt. Rushmore NMem; 
2001: 83%; 
2002: 80%; 
2003: 81%; 
2004: 81%; 
2005: 82%; 
Average 2001-2005: 81%. 

Park unit: Sequoia and Kings Canyon NP; 
2001: 78%; 
2002: 79%; 
2003: 81%; 
2004: 83%; 
2005: 81%; 
Average 2001-2005: 80%. 

Park unit: Shenandoah NP; 
2001: 85%; 
2002: 85%; 
2003: 86%; 
2004: 87%; 
2005: 85%; 
Average 2001-2005: 86%. 

Park unit: Yellowstone NP; 
2001: 72%; 
2002: 71%; 
2003: 75%; 
2004: 77%; 
2005: 76%; 
Average 2001-2005: 74%. 

Park unit: Yosemite NP; 
2001: 79%; 
2002: 86%; 
2003: 86%; 
2004: 90%; 
2005: 90%; 
Average 2001-2005: 86%. 

Park unit: Zion NP; 
2001: 81%; 
2002: 81%; 
2003: 85%; 
2004: 84%; 
2005: 86%; 
Average 2001-2005: 83%. 

Source: GAO analysis of Park Service data from 12 selected park units. 

[End of table] 

In addition, Park Service budget officials said that park units' 
personnel costs have also increased because they pay more of the costs 
of benefits for employees under the newer Federal Employee Retirement 
System (FERS) than they do for employees under the older Civil Service 
Retirement System (CSRS). As a result, the officials said that total 
compensation (salary and benefits) is higher for a FERS employee at the 
same salary level as a CSRS employee. Unlike CSRS, for example, FERS 
requires federal agencies to match up to 5 percent of employees' 
contributions to their retirement account. In addition, as CSRS 
employees retire and are replaced by FERS employees, the officials said 
that the Park Service's personnel costs will increase, when all else 
remains the same. 

At the park units we visited, benefits paid to FERS employees rose at a 
faster rate and were generally higher on average than those for CSRS 
employees. At almost all the park units, average total compensation for 
a CSRS employee exceeded that for a FERS employee.[Footnote 13] For 
instance, at Shenandoah National Park, average benefits for a FERS 
employee increased at an annual rate of about 3 percent from 2001 
through 2005 compared with about 2 percent per year for a CSRS employee 
(adjusted for inflation). In 2005, the average FERS total compensation 
was $44,242, including $11,713 for benefits, compared to an average 
CSRS total of about $54,134, including $9,401 for benefits. Tables 16 
and 17 in appendix III show nominal and inflation-adjusted personnel 
costs per retirement system at the 12 park units we visited. 

In addition to increasing personnel costs, officials at many of the 
park units we visited explained that rising utility costs caused parks 
to reduce spending in other areas. For example, at Grand Teton National 
Park, park officials told us that to operate the same number of 
facilities and assets, costs for fuel, electricity, and solid waste 
removal increased from $435,010 in 2003 to $633,201 in 2005--an 
increase of 46 percent, when adjusted for inflation. Officials told us 
that, as a result, their utility budget for fiscal year 2005 was spent 
by June 2005--three months early. In August, the park accepted the 
transfer requests of two division chiefs and used the salaries from 
these vacancies to pay for utility costs for the remaining portion of 
the year. 

Officials at some parks attributed increased utility costs to new 
construction that was generally not accompanied with a corresponding 
increase to their allocation for daily operations. In 2003, Yellowstone 
National Park constructed The Heritage Center with line item 
construction appropriations to house 5.3 million artifacts of natural 
and cultural significance. In 2001, the park officials requested but 
did not receive an additional $250,000 that they estimated was required 
to pay for the center's costs for power, water, sewer, and information 
technology. A Park Service headquarters official told us that while 
there is a need to replace old facilities with new construction, it is 
unlikely--given the overall fiscal demands on the federal government-- 
that park units will receive corresponding increases in funding for 
daily operations necessary to operate new facilities. 

New Park Responsibilities Affected Management Flexibility: 

Officials at most of the park units we visited also told us that their 
units generally did not receive additional allocations for 
administering new Park Service policies directed at reducing its 
maintenance backlog, implementing a new asset management strategy, or 
maintaining specified levels of law enforcement personnel (referred to 
as its no-net-loss policy) which has reduced their flexibility in 
addressing other park priorities. While officials stated that these 
policies were important, implementing them without additional 
allocations reduced their management flexibility. Over the years, the 
estimates of the amount of the agency's deferred maintenance backlog 
have varied widely--sometimes by billions of dollars. Since 1998, we 
have issued several reports on the agency's efforts to reduce its 
backlog.[Footnote 14] Since 2001, the Park Service has placed a high 
priority on reducing its currently estimated $5 billion maintenance 
backlog. In response, the Park Service, among other things, set a goal 
to spend the majority of its visitor fees on deferred maintenance 
projects--$75 million in 2002 increasing to $95 million in 
2005.[Footnote 15] Officials at several park units report that they 
have used daily operations allocations to absorb the cost of salaries 
for permanent staff needed to oversee the increasing number of visitor 
fee-funded projects. Park officials reported that the additional 
administrative and supervisory tasks associated with these projects add 
to the workload of an already-reduced permanent staff. For example, at 
Acadia National Park, officials told us that although visitor fee- 
funded projects have benefited the park, supervisors have reduced the 
extent to which they supervise their existing daily operating staff in 
order to manage temporary staff working on visitor fee-funded projects. 

While the Park Service may use visitor fees to pay salaries for 
permanent staff that manage and administer projects funded with visitor 
fees, it has a policy prohibiting such use. Instead, these salaries are 
paid using allocations for daily operations which reduce the amount of 
the allocation available for visitor services and other activities and 
limit the park units' ability to maintain these services and 
activities. Park Service headquarters officials recognize the strain 
that its policy has had on allocations for daily operations. Park 
Service headquarters officials said that its policy was first 
established under the original Recreational Fee Demonstration Program 
and provided several reasons for doing so. First, it did not want park 
units to use the revenue to hire more permanent staff than the park 
units needed. In addition, the Park Service wanted the revenue to be 
used for projects that provided visible results, such as rehabilitating 
a visitor facility, rather than on salaries for permanent employees. It 
also did not want to use visitor fee revenue to hire permanent staff 
because the recreational fee demonstration authority was temporary, 
therefore forcing park units to find another funding source to pay 
permanent employee salaries if the authority was discontinued. However, 
due to the strain this policy has had on allocations for daily 
operations combined with the recent passage of the Federal Lands 
Recreation Enhancement Act, which provides longer-term authority (10 
years) for collecting visitor fees, Park Service headquarters officials 
stated that they are considering changing this policy. To alleviate the 
pressure on funds for daily operations, we believe it would be 
appropriate for the Park Service to follow through with revising this 
policy. 

In an effort to better manage its maintenance backlog and improve asset 
management, the Park Service implemented a new asset management 
initiative in 1998. As a part of this initiative, park units are 
required to complete condition assessments and maintain this data in 
the Facility Maintenance Software System (FMSS), a system-wide, 
integrated software management tool to track parks' assets, their 
condition, and the costs needed to keep each asset in a good operating 
condition. Overall, park managers viewed this new system as a 
worthwhile endeavor. However, park officials explained that their units 
were not provided additional funds needed to implement this new 
responsibility. As a result, most of the parks used existing staff to 
inventory assets and enter the data into the software system at the 
expense of their primary duties. According to officials at many of the 
park units we visited, staff no longer had sufficient time to perform 
primary duties and responsibilities, such as regularly scheduled 
preventative maintenance or bathroom cleaning. The effect of 
implementing FMSS was particularly problematic for park units whose 
maintenance divisions were already operating with a reduced staff. For 
example, Badlands National Park, which has lost seven maintenance 
division employees since 2001, used the equivalent of two full time 
employees and two seasonal employees to enter data and work on other 
duties related to FMSS. Because the park had to use existing staff to 
comply with new asset-management requirements, regularly scheduled 
activities such as painting buildings and other structures were 
deferred, thus adding to its maintenance backlog. 

Another new Park Service policy impacting park units relates to its law 
enforcement personnel. In response to studies that described the level 
of law enforcement personnel as approaching a level for which basic 
resource and visitor protection may be in jeopardy, the Park Service, 
in 2002, implemented a no-net-loss policy for law enforcement 
personnel. Accordingly, Park Service headquarters directed the park 
units to not fall below 2002 law enforcement employee levels. Thus, 
unlike other divisions, when law enforcement positions become vacant, 
officials are required to fill the vacancy or request a waiver of the 
policy. For those park units that have adhered to the policy, officials 
told us that they have had to forgo hiring what they consider other 
priority vacant positions in other divisions in order to comply with 
the no-net-loss policy. Officials at other park units have been unable 
to maintain 2002 levels, either because they were unable to afford to 
re-hire vacant positions or because other vacant positions were deemed 
by park management to also be a priority. 

Park Units Have Taken Various Actions to Address Trends in Allocations 
for Daily Operations: 

In response to allocations for daily operations trends, increased 
costs, and new policy requirements, park officials at the 12 park units 
we visited said that activities funded with daily operations have been 
reduced or eliminated, delayed until other authorized funding sources 
became available, or performed with the use of other authorized funding 
sources. Park managers reported that because they have to manage within 
available funding resources, they make trade-offs among the operational 
activities such as education, visitor and resource protection, and 
maintenance activities. The extent and type of such responses vary 
among the park units. 

Park Units Reduced or Eliminated Some Services: 

To address differences between allocations for daily operations and 
expenses, officials at the park units we visited reported that they 
reduced or eliminated some services paid with daily operations 
allocations--including some that directly affected visitors and park 
resources.[Footnote 16] Park officials at some of the park units we 
visited told us that before reducing services that directly affect the 
visitor; they first reduced spending for training, equipment, travel, 
and supplies paid from daily operations allocations.[Footnote 17] 
However, most park units reported that they did reduce services that 
directly affect the visitor including reducing visitor center hours, 
educational programs, basic custodial duties, and law enforcement 
operations, such as backcountry patrolling. To illustrate: 

* Shenandoah National Park reduced the number of days the Loft Mountain 
Visitor Contact Station operated in 2004 and then closed it entirely in 
2005. This station offered the only interpretive services at the south 
end of the park; thus, visitors entering the park at the south end have 
to drive 50 miles to reach another contact station. In addition, 
because the park was not able to afford to fill vacancies in 2002, the 
park had to close all ranger programs at Mathews Arm campground in the 
north district (which contains 179 campsites) beginning in 2003. A park 
official said that as of the beginning of 2006, there continues to be 
no ranger programs offered at the Mathews Arm campground. 

* Grand Teton National Park reduced the interpretive division's 
staffing level that was paid out of daily operations funding, from 17 
FTEs in 2001 to 12 FTEs in 2005. Because fewer staff were available, 
the park reduced the operating hours of the Colter Bay Visitor Center 
by one hour per day and reduced the number of times they offer the Tour 
of the Indians Art Museum and the Teton Highlights programs. 

* At Bryce Canyon National Park, law enforcement officials told us 
that, since 2001, in order to maintain patrols in high-visitor-use 
areas, they reduced backcountry patrolling. As a result, the park has 
very little backcountry resource protection capability. For example, 
while park officials are aware of poaching in the park, they told us 
that they do not have the capability to prevent or investigate this 
illegal activity. 

* Acadia National Park closed all seven restrooms along roads and 
trailheads in the park's popular winter-use areas during the 2004-2005 
winter season. Park officials told us that they chose to close the 
restrooms in the winter in order to have sufficient resources to keep 
them open in the summer. 

* Grand Canyon National Park reduced interpretive programs available to 
visitors from 35 in 2001 to 23 in 2005. 

* Zion National Park reduced cleaning of a heavily used restroom 
facility at a popular visitor destination from twice per day to once 
per day in 2004. Maintenance officials told us that, after reducing the 
cleaning frequency, they received several complaints about the 
condition of the facilities. 

* At Gettysburg National Military Park, the Maintenance Division has 
lost one of its key preservation specialist positions responsible for 
the technical repair and restoration of cannon carriages. According to 
park officials, the lack of daily operations funds to hire a 
replacement has impaired the park's cannon carriage restoration project 
as the first attempt to restore carriages dating from the 1890s. The 
inability to fill this position has limited the restoration effort, 
requiring the storage of previously stripped and primed carriages in 
inadequate storage areas throughout the park. Most carriages will 
require efforts to reverse the rust damage while in storage. As a 
result, the estimated completion of the project increased to 15 years 
from 10 years. The personnel costs required for this extended time 
period plus the need to re-work the previously readied carriages is 
estimated to increase the overall costs of the project by approximately 
$260,000. 

* At Yellowstone National Park, the permanent law enforcement staffing 
level that was paid from daily operations funding was reduced from 51 
FTEs in 2001 to 45 FTEs in 2005. Park officials told us that this 
resulted in fewer back-and front-country patrols, and a reliance on 
less experienced and less trained personnel to perform these duties. 

* At Yosemite National Park, park officials told us that, as a result 
of reduced funding levels, four vacant dispatcher positions can not be 
replaced--threatening the park's ability to provide 911 services 7 days 
per week and 24 hours per day. In order to fill the key deputy chief 
ranger and fire chief vacancies, park officials have had to forgo re- 
filling several law and non-law enforcement positions. As a result, 
remaining staff worked overtime to perform the added responsibilities. 
With expected retirements, officials said that a critical branch chief 
position will be unfilled, as will several patrol positions and 
positions to staff the jail. However, the Department of the Interior 
stated that Yosemite National Park is working with Lassen Volcanic 
National Park and Whiskeytown-Shasta-Trinity National Recreation Area 
to provide joint services and that Yosemite is in full 911 compliance. 

* Law enforcement officials at Acadia National Park and Grand Canyon 
National Park explained that after accounting for personnel costs, 
little is left to pay for equipment and supplies. For example, 
officials at Acadia National Park told us that they are unable to 
replace emergency response equipment, such as vehicles and boats. The 
park's law enforcement division lost two patrol cars in the last three 
years and has been unable to replace the vehicles. Officials at the 
park told us that to be able to afford to replace one vehicle, they 
would have to forgo hiring a seasonal ranger--a position that park 
officials say they must maintain for the safety of park visitors and 
resources. At Grand Canyon National Park, 1.4 percent of the law 
enforcement division's funding for daily operations is available for 
law enforcement supplies and training. Officials at this park told us 
that this amount is not sufficient to pay for supplies such as first- 
aid provisions, ammunition, and bullet-proof vests. 

Park Units Used Other Authorized Funding Sources to Support Park 
Service Operations: 

When funds allocated for daily operations were not sufficient to pay 
for activities that were previously paid with this source, the park 
units we visited reported that they deferred activities or relied on 
other authorized funding sources such as allocations for projects, 
visitor fees, donations from cooperating associations and friends 
groups, and concessions fees. Table 8 shows funding from other 
authorized sources at four of the 12 park units we visited. Tables 18 
and 19 in appendix III show funding from other authorized sources for 
all 12 of the park units we visited. 

Table 8: Other Funding Source Amounts from Fiscal Years 2001 through 
2005 in Nominal Dollars: 

Dollars in thousands. 

Park unit: Acadia NP: 

Other funding source type: Visitor fees; 
2001: $1,843; 
2002: $2,011; 
2003: $1,907; 
2004: $2,165; 
2005: $1,870. 

Other funding source type: Concession fees; 
2001: $105; 
2002: $109; 
2003: $164; 
2004: $381; 
2005: $350. 

Other funding source type: Donations; 
2001: $395; 
2002: $313; 
2003: $368; 
2004: $514; 
2005: $291. 

Other funding source type: Other revenue; 
2001: $132; 
2002: $136; 
2003: $180; 
2004: $192; 
2005: $66. 

Park unit: Grand Canyon NP: 

Other funding source type: Visitor fees; 
2001: $16,661; 
2002: $14,558; 
2003: $13,702; 
2004: $14,425; 
2005: $13,927. 

Other funding source type: Concession fees; 
2001: $5,750; 
2002: $4,091; 
2003: $3,591; 
2004: $3,337; 
2005: $5,787. 

Other funding source type: Donations; 
2001: $176; 
2002: $254; 
2003: $301; 
2004: $287; 
2005: $227. 

Other funding source type: Other revenue; 
2001: $2,766; 
2002: $2,850; 
2003: $2,581; 
2004: $2,731; 
2005: $3,216. 

Park unit: Grand Teton NP: 

Other funding source type: Visitor fees; 
2001: $4,602; 
2002: $4,755; 
2003: $4,840; 
2004: $4,626; 
2005: $3,475. 

Other funding source type: Concession fees; 
2001: $0; 
2002: $0; 
2003: $1,208; 
2004: $1,557; 
2005: $930. 

Other funding source type: Donations; 
2001: $188; 
2002: $125; 
2003: $457; 
2004: $402; 
2005: $8,744. 

Other funding source type: Other revenue; 
2001: $107; 
2002: $137; 
2003: $165; 
2004: $158; 
2005: $163. 

Park unit: Sequoia Kings Canyon NP: 

Other funding source type: Visitor fees; 
2001: $2,151; 
2002: $2,395; 
2003: $2,458; 
2004: $2,474; 
2005: $2,154. 

Other funding source type: Concession fees; 
2001: $1; 
2002: $2; 
2003: 0; 
2004: $7; 
2005: $150. 

Other funding source type: Donations; 
2001: $69; 
2002: $131; 
2003: $24; 
2004: $29; 
2005: $51. 

Other funding source type: Other revenue; 
2001: $1,174; 
2002: $1,451; 
2003: $1,394; 
2004: $1,331; 
2005: $1,266. 

Source: GAO analysis of Park Service data from selected park units. 

Note: The other revenue category includes authorized revenue collected 
from various other miscellaneous sources. Examples of other revenue 
include rent collected through employee housing, transportation fees, 
cell tower permits, boat permits, and outfitter permits. 

[End of table] 

From 2001 to 2005, some parks delayed performing certain preventative 
maintenance activities formerly paid with allocations for daily 
operations until other authorized funding sources, such as project 
funds (including funds for cyclic maintenance, repair and 
rehabilitation, and visitor fees) could be found and approved. Park 
officials explained that, when preventative maintenance is deferred, 
the integrity of an asset is reduced--which can lead to replacing the 
asset at a greater cost than repairing it. Park Service headquarters 
officials told us that they are concerned about this decreased capacity 
and have reacted to the problem by requesting increases in project 
funding, such as cyclic maintenance, over the past few years. The 
following examples illustrate delayed activities that occurred at the 
park units we visited. 

* Shenandoah National Park reduced maintenance staffing levels paid 
from daily operations funding from 67 FTEs in 2001 to 44 FTEs in 2005, 
which decreased the park's ability to perform routine maintenance of 
trails and scenic overlooks. This work was traditionally considered a 
recurring operational activity paid for on an annual basis through 
funding for daily operations. In 2002, as a result of limited funding 
for daily operations, the park did not have the staff or resources to 
do this work annually and instead began performing the tasks once every 
2 or 3 years. The park currently uses cyclic maintenance project 
funding to carry out this work and plans to use visitor fees to pay for 
this activity in the future. 

* At Grand Teton National Park, officials told us that the road 
striping and chip sealing process--which should be performed annually 
to extend the life of a road 10 to 15 years--can no longer be paid with 
funding for daily operations. Consequently, officials told us that they 
have had to delay the maintenance activity and rely on less frequently 
available project funds. 

Rather than eliminating or not performing daily operational activities, 
some park units used volunteers and funding from authorized sources 
such as donations from non-profit partners and concessionaires' fees to 
accomplish activities that were formerly paid with daily operations 
funds.[Footnote 18] Officials at several park units said that they 
increasingly depend on donations from cooperating associations to pay 
for training and equipment and rely on their staff and volunteers to 
provide information and educational programs to visitors that were 
traditionally offered by park rangers. Funds from these sources can be 
significant, but they are subject to change from year to year. For 
example, park officials explained that donations at Grand Teton 
fluctuated from about $188,000 in 2001 to over $400,000 in 2004, and 
then increased to over $8 million in 2005 when the park received a 
substantial gift for a new visitor center from their non-profit park 
partners. For the most part, funding from these sources is intended to 
supplement, rather than replace, daily operations funds. However, 
officials told us that these funds are being used to pay for activities 
that were formerly paid with funding for daily operations. To 
illustrate: 

* Officials at Sequoia and Kings Canyon National Parks told us that 60 
percent of all visitor center staffing hours in 2005 were provided by 
their cooperating association compared to approximately 10 percent in 
2001. 

* At Grand Canyon National Park, the interpretive division had 
approximately $75,000 available in daily operations funding in 2001 to 
pay for non-personnel costs such as travel and supplies. By 2005, 
approximately 99 percent of the division's funds were spent on 
personnel, and the park relied on their cooperating association to pay 
for non-personnel costs. 

* In 2003, Yellowstone National Park constructed The Heritage Center 
with line item construction appropriations to house 5.3 million 
artifacts of natural and cultural significance. In 2001, the park 
requested but did not receive $807,000 in its park's daily operations 
funds to pay for the center's operating costs. While the park absorbed 
an estimated utility cost of $250,000 per year, they relied on their 
non-profit partners--the Yellowstone Foundation and the Yellowstone 
Cooperative Association--to help staff, furnish, and support museum and 
archive acquisitions. 

* Badlands National Park officials stated that approximately 65 percent 
of visitor contacts in 2004 were provided by employees of the park's 
nonprofit partner--the Badlands Natural History Association--compared 
to 45 percent in 2001. 

* At Grand Teton National Park and Gettysburg National Military Park, 
park partners are paying for the construction of a new visitor center 
and are creating endowments to operate the new facilities for a set 
number of years. 

* In 2005, Grand Teton National Park turned over operations of five 
campgrounds to concessionaires. Park officials reported that by 
transferring these campgrounds, they reduced personnel and maintenance 
costs associated with operating the campgrounds. However, officials 
stated that a reduction in park-funded seasonal custodians has meant 
that fewer staff are available to clean restrooms and pick up litter. 
Officials said there was a noticeable increase in litter in the park in 
2005. 

* Acadia National Park's partner, The Friends of Acadia, has supplied 
support in the form of funding and volunteer hours to maintain the 
park's trail system. Other parks, including Grand Teton National Park 
and Yellowstone National Park, are considering similar options to 
maintain their trail systems because funding for daily operations is no 
longer available to cover all operational needs. 

Officials at several park units expressed concern about using funding 
from other authorized sources to address shortfalls--not only because 
the funds can vary from year to year, but also because these partners' 
stipulations on how their donations can be used may differ from the 
parks' priorities. As a result, relying on these sources for programs 
that require a long-term funding commitment could be problematic. For 
example, until 2004 the Natural Resources Division at Badlands National 
Park used visitor fees to pay for natural resource programs (e.g., 
bighorn sheep restoration and non-native plant control). However, to 
meet deferred maintenance spending goals, the park could no longer 
submit projects for approval to use visitor fee revenue to support 
natural resource programs. Officials at several park units also told us 
that, as they increasingly rely on such sources, more of their time 
must be spent cultivating relationships and applying for grants, rather 
than performing their regular duties. 

The Park Service Has Undertaken Three Management Initiatives to Address 
Fiscal Performance and Accountability of Park Units: 

The Park Service identified three management initiatives that it has 
undertaken to address the fiscal performance and accountability of park 
units and to better manage within their available resources: the 
Business Plan Initiative (BPI), the Core Operations Analysis (COA), and 
the Park Scorecard. Each initiative operates independently and they are 
at various stages of development and implementation. In addition, the 
Department noted in its comments to us that there are other efforts 
such as the Office of Management and Budget's analysis under the 
Program Assessment Rating Tool (PART) that contribute to park unit and 
departmental efforts to achieve more effective programs and efficient 
operations. Table 9 summarizes each of the three initiatives that we 
reviewed and their stages of implementation. 

Table 9: Park Service Management Initiatives to Address Park Units' 
Fiscal Performance and Accountability: 

Management initiative: Business Plan Initiative; 
Description: Park managers, with the help of business interns, identify 
all sources and uses of park funding and operational requirements to 
determine levels needed to operate and manage their park. From this, a 
plan is developed to address any gaps between available funds and park 
unit needs; 
Development and implementation: 
* Park Service headquarters and regional offices seek voluntary 
participation in the BPI process; 
* First BPI was prepared in 1997 by Yellowstone National Park; 
* About 12 park units participate in a BPI every year; 
* As of January 2006, 25 percent of all park units have participated. 

Management initiative: Core Operations Analysis; 
Description: A step- by-step process where park unit, regional, and 
headquarters officials evaluate the park unit's core mission and 
identify essential park unit activities and associated funding needs; 
Development and implementation: 
* Developed in 2004; 
* The Park Service intends to have all park units complete a COA by 
2011; 
* To achieve this goal, the Park Service will select 50 park units per 
year to participate. 

Management initiative: Park Scorecard; 
Description: Headquarters officials use a series of indicators to 
compare each park unit's fiscal and operational condition, and 
managerial performance; 
Development and implementation: 
* Is in the development stage; 
* Used to justify park units' budget increases for daily operations in 
2005; 
* To be used to support and evaluate park operations in the future. 

Source: GAO analysis of Park Service data. 

[End of table] 

Business Plan Initiative: 

Through the BPI process, park unit staff--with the help of business 
interns from the Student Conservation Association--identify all sources 
and uses of park funds to determine funding levels needed to operate 
and manage park units.[Footnote 19] Using this information, park unit 
managers develop a 5-year business plan to address any gaps between 
available funds and park unit operational and maintenance needs. The 
process used in the BPI involves 6 steps, completed over an 11-week 
period. Park staff and the business interns (1) identify the park 
unit's mission; (2) conduct an inventory of park assets; (3) analyze 
park funding trends; (4) identify sources and uses of park funding; (5) 
analyze park operations and maintenance needs; and (6) develop a 
strategic business plan to address gaps between funds and park needs. 
The BPI began in 1997 as a result of a partnership between the Park 
Service and the National Parks Conservation Association. Their goals 
were to ensure that superintendents of park units had the knowledge and 
data to develop cost-reducing strategies and make a rational case for 
funding proposals. 

Yellowstone National Park completed the first business plan in 
1997.[Footnote 20] Since then, about 25 percent of all park units have 
participated in the process. Most of the participation has come from 
smaller park units--those with a budget for daily operations under $2 
million per year. The Park Service selects about 12 park units per year 
to participate in the BPI process, but their participation is 
voluntary. Park units are selected based on a number of factors 
including (1) geographic diversity, (2) unit types (e.g., national 
park, national historic site, national recreation area, national 
monument), (3) whether the park units have sufficient staffing and 
funding resources to conduct the BPI process, and (4) whether the 
timing for the park unit to conduct a BPI is appropriate. For instance, 
in some cases, park units selected for the BPI are subsequently unable 
to participate because they are undergoing major management initiatives 
or changes (e.g., preparing a general management plan or changing park 
superintendents); a park unit may also hold an event that represents an 
anomaly and may skew the financial condition of the park unit . For 
example, the Canaveral National Seashore was scheduled to complete the 
BPI process in fiscal year 2005 but did not due to damage to some of 
the park unit's assets caused by hurricanes in 2004. 

All 12 of the park units we visited have completed a business 
plan.[Footnote 21] Many officials--both at the unit level and 
headquarters--stated that business plans are, among other things, 
useful in helping them identify future budget needs. Once completed, 
park managers often issue a press release to announce its completion. 
Park managers may also send copies to their legislators, local 
community councils, and park unit partners (such as cooperating 
associations) to communicate the results. A Park Service official 
stated, however, that the Park Service is still working to refine how 
these business plans can serve as a better tool for justifying funding 
needs. 

Core Operations Analysis: 

The COA was developed in 2004 to help park unit managers evaluate their 
park unit's core mission, identify essential park unit activities and 
associated funding levels, and make fully informed decisions on 
staffing and funding. The COA is part of a broader Park Service-wide 
effort to integrate management tools to improve park efficiency. Park 
Service headquarters and regional officials and park unit staffs work 
together in a step-by-step process to conduct the analysis. These steps 
include preparing a 5-year budget cost projection (BCP) to establish 
baseline financial information and help project future park needs, 
defining core elements of the park unit's mission, identifying park 
priorities, reviewing and analyzing activities and associated staff 
resources, and identifying efficiencies. Budget staff for each park 
unit first complete a 5-year BCP that uses the current year's funding 
level for daily operations as a baseline, and estimates future levels, 
increases in non-personnel costs, and fixed costs such as salaries and 
benefits. The general target of the analysis is to adjust personal 
services and fixed costs at or below 80 percent of the unit's funding 
levels for daily operations. 

The BCP model relies heavily on fixed costs, however the Park Service 
has not developed a servicewide standard definition of fixed costs so 
individual park units may calculate fixed costs differently. For 
example, fixed costs at some of the park units we visited included the 
costs of both personnel and utilities, whereas at other park units it 
only included personnel costs. As such, fixed costs used in the BCP 
model vary among park units. Although the COA is in the development 
stage, the Park Service plans to have all units complete an analysis by 
the end of fiscal year 2011. To achieve this goal, the Park Service 
will select 50 parks per year to participate. 

Three of the 12 park units we visited have completed (or are in the 
process of completing) a COA, and 3 will begin the COA in fiscal year 
2006. The remaining 6 park units we visited have yet to be selected. 
Park unit officials told us that the preliminary results have helped 
them determine where efficiencies in operations might accrue. A Park 
Service regional official told us that the core operations process is 
still in its early development, noting that preliminary results are 
useful but too early to determine results to be realized by the park 
units. 

Park Scorecard: 

Park Service headquarters developed the Park Scorecard beginning in 
fiscal year 2004 to serve as an indicator of each park unit's fiscal 
and operational condition, and managerial performance. The Scorecard is 
intended to provide an overarching summary of each park unit's 
condition by offering a way to analyze individual park unit needs. It 
also provides Park Service officials with information needed to 
understand how park units compare to one another based on broad 
financial, organizational, recreational, and resource-management 
criteria. The Park Scorecard uses data from Park Service-wide databases 
already used by all park units. Park Service headquarters uses over 30 
separate indicators as measures of the condition of park units. 
Examples of these indicators include personnel costs as a percentage of 
daily operations allocations, average overtime costs, the ratio of 
volunteer hours to total Park Service hours, operational and 
maintenance costs per square foot, and annual growth in visitation, to 
name a few. The result of the analysis using these indicators is a 
numerical value that is assigned to each measure leading to an 
assessment of being in poor, fair, good, or excellent operational 
condition. 

Although the Park Scorecard is still under development, the Park 
Service's headquarters budget office used it to validate and approve 
requests for increases in daily operations allocations for the highest 
priorities among park units to be funded out of a total of $12.5 
million that was provided in 2005 for daily operations directed at 
visitor service programs. The Park Service approved requests for 
funding at three out of the twelve parks we visited (Badlands National 
Park, Grand Teton National Park, and Yellowstone National Park). Park 
Service officials explained that while Park Scorecard figures can 
generate useful park unit comparisons, regional policies can also 
influence the indicators; while these numbers provide a good starting 
point for analysis, park unit staff input must be a consideration in 
determining park priorities. Park officials further explained that it 
is difficult to develop a set of common indicators that can be used for 
parks units with different characteristics, such as Yellowstone 
National Park and Carl Sandburg Home National Historic site. Park 
Service headquarters officials, with the assistance and input of park 
unit managers, plan on refining the Park Scorecard to more accurately 
capture all appropriate park measurements and to identify, evaluate, 
and support future budget increases for park units. The Park Service 
also intends for park managers to use the Park Scorecard to facilitate 
discussions about their needs and priorities. 

Conclusions: 

From 2001 through 2004, the Park Service increased allocations for 
support programs and project funding while placing less of an emphasis 
on allocations for daily operations. In 2005, however, the agency 
emphasis shifted toward an increase in allocations for daily 
operations. As evidenced by our visits to 12 park units, this later 
shift appears to be going in the direction needed to help the park 
units overcome some of the difficulties they have recently experienced 
in meeting operational needs--particularly as they relate to 
maintaining visitor services and protecting resources. In responding to 
these trends, park unit officials found ways to reduce spending on 
their allocations for daily operations and identify and use authorized 
sources other than these allocations to minimize some impacts on park 
operations and visitor services. While park units are relying more on 
other authorized sources to perform operations, using such funds has 
its drawbacks because it usually takes park units longer, with more 
effort from park employees, to obtain and use these sources. In the 
case of donations, for example, park officials spend more time grooming 
relationships with donors to obtain the funds. Visitor fees have been 
an important and significant source of funds for park units to address 
high-priority needs, such as reducing its maintenance backlog. However, 
Park Service policy prohibiting the use of visitor fees to pay salaries 
of permanent employees managing projects may reduce the flexibility in 
managing the use of funding for daily operations. While Park Service 
officials stated that they are embarking upon three management 
initiatives to improve park performance and accountability--and to 
better manage within available resources--it is too early to assess the 
effectiveness of these initiatives. 

Recommendation for Executive Action: 

To reduce some of the pressure on funding for daily operations, we are 
recommending that the Secretary of the Interior direct the Park Service 
Director to follow through in revising Park Service policy to allow 
park units to use visitor fee revenues to pay the costs of permanent 
employees administering projects funded by visitor fees to the extent 
authorized by law. 

Agency Comments and Our Response: 

We provided the Department of the Interior with a draft of this report 
for review and comment. The department provided written comments that 
are included in appendix V. The following represents a summary of the 
major comments made by the department and our response. Additional 
comments and our response are also provided in appendix V. With regard 
to our recommendation, the department stated that we should clearly 
state that visitor fee revenue (and not other sources) be used to fund 
only a limited number of permanent employees and be specifically 
defined for the sole purpose of executing projects funded from fee 
revenue. Our recommendation was specifically directed at using visitor 
fee revenues for paying the salaries of permanent employees who 
administer projects funded with such revenues and provides the Park 
Service with the flexibility to define how the visitor fee revenues 
should be applied. Accordingly, we have not modified our recommendation 
in response to the department's comment. 

The department appreciated the diligent work of the team that prepared 
the report and the large amount of data collected, but had concerns 
that the presentation of the data in the report creates a misleading 
impression concerning the state of park operations for several reasons. 
The department said our report provided an incomplete analysis of the 
financial status of the park units and left the impression that park 
budgets have not been emphasized. We disagree with this view. We 
conducted a detailed analysis of the major funding trends for park 
operations. For example, we reported the overall funding trends for 
operations, including appropriations from the ONPS account, in relation 
to the Park Service's total budget authority. As the report indicates, 
this trend showed that appropriations to the ONPS account increased 
overall during our study time frame at a higher rate than the Park 
Service's total budget authority. We also analyzed the trends in both 
allocations for daily operations and projects for the park service as a 
whole and for each of the 12 high-visitation park units we visited. 
Moreover, the report showed that the fiscal year 2005 appropriation for 
the ONPS account included an additional $37.5 million over the amounts 
proposed by the House and Senate for the Operation of the National Park 
System account, to be used for daily operations. Furthermore, the 
report discusses the impacts that these trends have had on operations 
at the 12 parks we visited. In response to the department's comments, 
we have included more examples in the report showing where project 
funds have been used by park units. 

The department also commented that within a constrained fiscal 
environment, park operations have been a high priority for both the 
Administration and the Congress. Such an analysis would require a much 
broader review comparing the Park Service's budget with budgets of 
other federal agencies, which was beyond the scope of our review. The 
department commented that the report draws a "false dichotomy" between 
operations and project funding. Specifically, it said that the visitor 
experience at national parks is shaped not only by direct visitor 
services activities such as ranger interpretive programs, but also by 
the condition of park facilities and the natural resources. We agree 
that daily operations allocations--which funds activities such as 
ranger interpretive programs--and project allocations--which funds 
facility improvements--are both important to park operations and 
visitor experiences. Furthermore, we believe there is an important 
distinction between how park units can use daily operations allocations 
as opposed to allocations for projects. In fact, the Park Service 
itself allocates ONPS appropriations in these distinct categories. 
Daily operations allocations are used to pay for operating expenses 
such as permanent and temporary employees to perform day to day 
activities such as interpretive programs and cleaning restrooms. In 
contrast, Park Service procedures require that project-related 
allocations are to be used only for projects and not for day to day 
activities. The report recognizes this distinction by presenting these 
trends separately and by providing examples of how park units are using 
these two sources of allocations to conduct operations. 

The department also stated that the report's use of several park 
anecdotes concerning reduced allocations for daily operations is 
misleading. Specifically, the department stated that the anecdotes 
within the report highlight only certain divisions or programs in which 
a park significantly reduced staffing in isolation from the park unit's 
overall staffing, allocations for daily operations, and allocations for 
projects, as well as the overall employment levels at the Park Service 
as a whole. While the department noted in its comments that overall the 
balance of seasonal and permanent employees remained stable in 2005 
compared to 2001, we found that for most of the 12 high-visitation park 
units we visited, that ratio of seasonals to permanent employees 
increased. We believe that these park specific FTE trends are better 
indicators of an individual park unit's ability to maintain services at 
the park units than servicewide FTE trends. Analysis of activities at 
12 specific park units was one of our report objectives and we continue 
to believe that the specific park examples adds to the report by 
illuminating the issues identified at the 12 park units that we 
visited--namely that officials at the park units reported that their 
daily operations allocations have not kept pace with increasing 
personnel costs, rising utility costs, and increased responsibilities. 
We provided examples of the tradeoffs park managers made to manage 
within their available resources that illustrate what park managers 
consistently told us about their ability to maintain park operations 
such as visitor service levels. In addition, we provided overall FTE 
trends for the park units we visited, including those FTEs paid with 
allocations for daily operations and those paid with other authorized 
sources. These trends show that most of the park units are increasingly 
relying on sources other than daily operations allocations to maintain 
FTE levels. 

In addition, the department said that the report relies on the use of 
budget and financial data but does not examine performance information, 
the trends in accomplishments, or efforts to improve service delivery 
over the time period of our study. Specifically, it mentioned the Park 
Service's and the administration's measurement of performance and 
related cost information, the analysis of allocations for daily 
operations through the PART process, and efforts in management 
excellence. It said that all of these efforts, including Park Service- 
specific tools such as the Core Operations Analysis are yielding 
results in achieving more effective programs and more efficient 
operations. In addition, the department states that the Park Service 
has adopted new ways of doing business including centralizing some 
services and systems under the department. Specifically, the comments 
describe a department-wide effort to purchase information technology 
hardware and software and other consumables, as well as Park Service 
efforts to limit travel, provide more efficient training, and use 
volunteers. We added additional information to the report to reflect 
these efforts. As recognized by the department, the report provides 
information on the major management initiatives that the Park Service 
has undertaken, such as COA, BPI, and the Park Scorecard, which are 
designed to assist managers to develop fully informed decisions which 
direct park resources toward functions that are essential to achieving 
mission goals and also serve as a part of management planning efforts. 

With regard to the department's comment regarding accomplishments, we 
point out that for the most part, the initiatives underway were in 
their early stages of development and it was too soon to determine 
results. We did however, identify several examples of how park managers 
at the parks we visited reported that they are increasingly relying on 
volunteers to perform activities that were previously funded through 
allocations for daily operations and their efforts to limit travel and 
training, among other expenses, to reduce impacts on visitor services. 

Finally, the department commented that, although there is not a perfect 
inflation adjustment index available to accurately determine an index 
of Park Service operating costs, the specific price index we used for 
deflating Park Service funding and operating costs--Gross Domestic 
Product (GDP) Price Index for Government Consumption Expenditures and 
Gross Investment (federal nondefense sector)--measures changes in the 
value of government output using the cost of inputs such as 
compensation of employees. The department said that it believes it 
might be more appropriate to use the GDP (Chained) Price Index because 
it is based upon costs of goods and services in the marketplace and it 
therefore considers productivity and other management enhancements; the 
department also said that this broader price index is not a perfect 
index either. The department added that using the broader index would 
provide significantly different results; that is, the inflation-
adjusted trends in funding for daily operations would generally be more 
positive. We agree that there is not a perfect index available to 
accurately determine an index of Park Service operating costs, and we 
agree that using a broader index would yield different results. 
Nonetheless, we believe that using the GDP Price Index for Government 
Consumption Expenditures and Gross Investment (federal nondefense 
sector) better represents the real quantity of services that the 
agency's budget provides over time. In general, when removing the 
effects of price changes, it is preferable to use a specific price 
index that matches the composition of the nominal dollar amounts under 
consideration. As we noted in the report, this price index reflects 
changes in the value of government output, as measured by the cost of 
inputs such as compensation of employees and purchases of goods and 
services. Input costs are used in constructing the index because most 
government output is not sold in the market place. For the Park 
Service, most of the operating costs consist of employee compensation. 
As a result, the specific price index we used assigns greater weight to 
changes in federal workers' compensation than does the more general GDP 
(Chained) Price Index. While the GDP (Chained) Price Index reflects 
productivity improvements in the overall economy, it is partly based on 
input costs and a large portion of the basket of goods it represents 
reflects personal consumption, including food, clothing, and housing, 
which are less relevant for assessing real trends in the Park Service's 
operating costs. 

As agreed with your office, unless you publicly announce the contents 
of this report earlier, we plan no further distribution until 30 days 
from the report date. At that time, we will send copies of this report 
to the Secretary of the Interior and other interested parties. We will 
also make copies available to others upon request. In addition, the 
report will be available at no charge on the GAO Web site at 
[Hyperlink, http://www.gao.gov]. 

If you or your staff have questions about this report, please contact 
me at (202) 512-3841 or [Hyperlink, nazzaror@gao.gov]. Contact points 
for our offices of Congressional Relations and Public Affairs may be 
found on the last page of this report. Key contributors to this report 
are listed in appendix VI. 

Signed by: 

Robin Nazzaro: 
Director, Natural Resources and Environment: 

[End of section] 

Appendixes: 

Appendix I: Scope and Methodology: 

This appendix presents the methods we used to gather information on 
National Park Service (Park Service) funding trends, their impacts on 
selected park units, and management initiatives under way to address 
fiscal performance and accountability. 

To identify funding trends for Park Service operations and visitor fees 
from fiscal years 2001 through 2005, we obtained and analyzed 
appropriations legislation, including appropriations for the Operation 
of the National Park System account (consisting of funding for daily 
operations, projects, and other support programs), and visitor fees. We 
analyzed the data in both nominal (actual) and real (adjusted for 
inflation) terms. To remove the effects of inflation, we adjusted 
nominal dollars using the Gross Domestic Product (GDP) Price Index for 
Government Consumption Expenditures and Gross Investment (federal 
nondefense sector), with 2001 as the base year. The price index 
reflects changes in the value of government output, measured by the 
cost of inputs, including compensation of employees and purchases of 
goods and services. Consistent with the proportion of the Park 
Service's operating expenditures on personnel, this price index is more 
heavily weighted by changes in federal workers' compensation than the 
overall GDP price index. We gathered funding data from the Park Service 
Budget Office on allocations from the ONPS account for daily 
operations, projects, and other support programs. In addition to 
obtaining data on allocations for daily operations on a servicewide 
level, we also gathered data on the allocations for daily operations 
for individual park units to determine how many have received operating 
increases or decreases, and how many have remained relatively 
constant.[Footnote 22] We also obtained data on recreation visits from 
the Park Service's Public Use Statistics Office for park units to 
analyze allocations for daily operations in relation to visitation 
rates.[Footnote 23] We also interviewed agency officials at Park 
Service Headquarters, the Pacific West Region, the Intermountain 
Region, and individual park units in addition to those listed below, 
including Mount Rainier National Park, Olympic National Park, Point 
Reyes National Seashore, and the San Francisco Maritime National 
Historical Park. We assessed the reliability of the data by reviewing 
the methods of data collection for relevant Park Service databases. We 
determined that the data were sufficiently reliable for the uses in 
this report. 

To determine the funding trends for certain individual park units and 
how the trends affected their ability to provide services to visitors, 
we collected and analyzed data and reviewed operational impacts at the 
nonprobability sample[Footnote 24] of 12 park units visited; we also 
interviewed park unit officials about their funding trends, operational 
impacts, and policy requirements. The 12 park units represent a cross- 
section of high-visitation parks (greater than 500,000 visits per year) 
with potentially a large number of visitor services, regional 
diversity, and a range of allocations for daily operations. In 
addition, based on preliminary figures, we sought a cross-section of 
parks that had sustained varying levels of growth in their allocations 
for daily operations. Table 10 lists the 12 parks we visited, their 
primary features, and their location. 

Table 10: Park Service Units that GAO Visited: 

Park unit: Acadia NP; 
Primary features: Mountains, woodlands, lakes and ponds, and ocean 
shoreline, historic roads; 
Region and location: Northeast Region, Maine. 

Park unit: Badlands NP; 
Primary features: Buttes, pinnacles and spires, mixed grass prairie, 
wildlife; 
Region and location: Midwest Region, South Dakota. 

Park unit: Bryce Canyon NP; 
Primary features: Limestone amphitheaters, canyons and spires; 
Region and location: Intermountain Region, Utah. 

Park unit: Gettysburg NMP; 
Primary features: Civil war battlefield; 
Region and location: Northeast Region, Pennsylvania. 

Park unit: Grand Canyon NP; 
Primary features: Canyons, river, geologic features; 
Region and location: Intermountain Region, Arizona. 

Park unit: Grand Teton NP; 
Primary features: Mountains, lakes, wildlife; 
Region and location: Intermountain Region, Wyoming. 

Park unit: Mt. Rushmore NMem; 
Primary features: Granite memorial; 
Region and location: Midwest Region, South Dakota. 

Park unit: Sequoia and Kings Canyon NP; 
Primary features: Mountains, canyons, giant sequoias, rivers; 
Region and location: Pacific West Region, California. 

Park unit: Shenandoah NP; 
Primary features: Mountains, valleys, historic drive, wildlife; 
Region and location: Northeast Region, Virginia. 

Park unit: Yellowstone NP; 
Primary features: Thermal features, wildlife, lakes, rivers, mountains; 
Region and location: Intermountain Region, Wyoming, Montana, Idaho. 

Park unit: Yosemite NP; 
Primary features: Waterfalls, mountains, wildlife, giant sequoias; 
Region and location: Pacific West Region, California. 

Park unit: Zion NP; 
Primary features: Canyons, cliffs, river, wildlife; 
Region and location: Intermountain Region, Utah. 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO. 

[End of table] 

For each of the 12 park units, we collected data on funding trends, and 
park operations including visitor services. We collected park data on 
budget formulation, budget allocation, expenditures, and staffing 
trends. We sent uniform data requests to the 12 park units, provided 
uniform guidance and interactively worked with park officials to 
compile the data.[Footnote 25] We also obtained information on 
operations such as (1) visitor and resource protection (e.g. law 
enforcement rangers), (2) facilities operation and maintenance (e.g. 
opening a campground or a visitor center and maintaining a building or 
trail), (3) resource management (e.g. monitoring the condition of 
threatened species or water quality), (4) interpretation and education 
(e.g. interpretive rangers to provide educational programs), and (5) 
park administration and support (e.g. updating computer systems or 
attending training). Each of these operational areas has some role in 
providing visitor services. We assessed the reliability of the data by 
reviewing the methods of data collection for relevant Park Service 
databases. We determined that the data are sufficiently reliable for 
the purposes of this report. 

To identify recent management initiatives the Park Service has under 
way to address fiscal performance and accountability for fiscal years 
2001 to 2005, we gathered and reviewed documentation on several 
management initiatives including the Business Plan Initiative, the Core 
Operations Analysis, and the Park Scorecard. For the Business Plan 
initiative, we interviewed park service officials at headquarters and 
individual park units on the content of the analysis, procedures, and 
final plans. For the Core Operations Analysis, we interviewed park 
officials in the Intermountain Region and at individual park units that 
are in the process of performing the analysis including Grand Canyon 
National Park, and Yellowstone National Park. For the Park Scorecard, 
we reviewed documentation and interviewed Park Service Headquarters 
officials on the development and implementation of the initiative. 

We conducted our work from January 2005 to March 2006 in accordance 
with generally accepted government auditing standards. 

[End of section] 

Appendix II: Operation of the National Park System Account and Visitor 
Fee Revenue, Fiscal Years 2001 through 2005: 

Tables 11 and 12 show trends in appropriations in both nominal and 
inflation-adjusted terms for the Operation of the National Park System 
Account, including allocations for daily operations and support 
programs. In addition, the tables show the trends for visitor fees 
collected by the Park Service from fiscal years 2001 through 2005. 

Table 11: Operation of the National Park System Account and Visitor Fee 
Revenue, in Nominal Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Daily operations allocations: Park units; 
Fiscal year 2001: $903,149; 
Fiscal year 2002: $940,063; 
Fiscal year 2003: $961,665; 
Fiscal year 2004: $968,095; 
Fiscal year 2005: $1,028,649; 
Average annual change (%): 3.31. 

Daily operations allocations: National trail system; 
Fiscal year 2001: $4,758; 
Fiscal year 2002: $5,108; 
Fiscal year 2003: $5,049; 
Fiscal year 2004: $5,458; 
Fiscal year 2005: $5,925; 
Average annual change (%): 5.64. 

Daily operations allocations: Other field offices and affiliated areas; 
Fiscal year 2001: $7,607; 
Fiscal year 2002: $9,854; 
Fiscal year 2003: $10,071; 
Fiscal year 2004: $10,502; 
Fiscal year 2005: $12,732; 
Average annual change (%): 13.74. 

Total allocations for daily operations; 
Fiscal year 2001: $915,514; 
Fiscal year 2002: $955,025; 
Fiscal year 2003: $976,785; 
Fiscal year 2004: $984,055; 
Fiscal year 2005: $1,047,306; 
Average annual change (%): 3.42. 

Projects and other support programs: 

Support programs: 

Cyclic Maintenance[A]; 
Fiscal year 2001: $34,534; 
Fiscal year 2002: $32,302; 
Fiscal year 2003: $51,866; 
Fiscal year 2004: $65,083; 
Fiscal year 2005: $62,842; 
Average annual change (%): 16.15. 

Repair and Rehabilitation; 
Fiscal year 2001: $58,453; 
Fiscal year 2002: $72,640; 
Fiscal year 2003: $84,353; 
Fiscal year 2004: $94,423; 
Fiscal year 2005: $95,100; 
Average annual change (%): 12.94. 

Central offices; 
Fiscal year 2001: $119,379; 
Fiscal year 2002: $130,710; 
Fiscal year 2003: $130,306; 
Fiscal year 2004: $136,916; 
Fiscal year 2005: $139,116; 
Average annual change (%): 3.90. 

Field resource centers; 
Fiscal year 2001: $3,954; 
Fiscal year 2002: $4,185; 
Fiscal year 2003: $4,229; 
Fiscal year 2004: $4,250; 
Fiscal year 2005: $4,147; 
Average annual change (%): 1.20. 

Other support programs; 
Fiscal year 2001: $8,655; 
Fiscal year 2002: $10,855; 
Fiscal year 2003: $10,847; 
Fiscal year 2004: $3,044; 
Fiscal year 2005: $3,050; 
Average annual change (%): -22.95. 

Subtotal support programs; 
Fiscal year 2001: $224,975; 
Fiscal year 2002: $250,692; 
Fiscal year 2003: $281,601; 
Fiscal year 2004: $303,716; 
Fiscal year 2005: $304,255; 
Average annual change (%): 7.84. 

Servicewide programs: 

Training programs; 
Fiscal year 2001: $8,701; 
Fiscal year 2002: $12,232; 
Fiscal year 2003: $14,153; 
Fiscal year 2004: $13,893; 
Fiscal year 2005: $12,532; 
Average annual change (%): 9.55. 

Cooperative programs; 
Fiscal year 2001: $8,145; 
Fiscal year 2002: $10,146; 
Fiscal year 2003: $15,044; 
Fiscal year 2004: $18,220; 
Fiscal year 2005: $10,796; 
Average annual change (%): 7.30. 

Information technology programs; 
Fiscal year 2001: 0; 
Fiscal year 2002: 0; 
Fiscal year 2003: 0; 
Fiscal year 2004: $797; 
Fiscal year 2005: $5,120; 
Average annual change (%): n/a. 

Other servicewide programs; 
Fiscal year 2001: $136,330; 
Fiscal year 2002: $152,791; 
Fiscal year 2003: $169,216; 
Fiscal year 2004: $185,996; 
Fiscal year 2005: $189,792; 
Average annual change (%): 7.90. 

Subtotal servicewide programs; 
Fiscal year 2001: $153,176; 
Fiscal year 2002: $175,169; 
Fiscal year 2003: $198,413; 
Fiscal year 2004: $218,906; 
Fiscal year 2005: $213,240; 
Average annual change (%): 8.62. 

Subtotal external administrative costs; 
Fiscal year 2001: $99,408; 
Fiscal year 2002: $105,312; 
Fiscal year 2003: $107,532; 
Fiscal year 2004: $112,951; 
Fiscal year 2005: $123,935; 
Average annual change (%): 5.67. 

Total projects and other support programs; 
Fiscal year 2001: $477,559; 
Fiscal year 2002: $531,173; 
Fiscal year 2003: $587,546; 
Fiscal year 2004: $635,573; 
Fiscal year 2005: $641,430; 
Average annual change (%): 7.65. 

Total for Operation of the National Bank System account; 
Fiscal year 2001: $1,393,073; 
Fiscal year 2002: $1,486,198; 
Fiscal year 2003: $1,564,331; 
Fiscal year 2004: $1,619,628; 
Fiscal year 2005: $1,688,736; 
Average annual change (%): 4.93. 

Visitor fee revenue[B]; 
Fiscal year 2001: $140,413; 
Fiscal year 2002: $140,997; 
Fiscal year 2003: $140,403; 
Fiscal year 2004: $148,952; 
Fiscal year 2005: $146,805; 
Average annual change (%): 1.12. 

Source: GAO analysis of National Park Service data. 

[A] Cyclic Maintenance allocations include both Regular Cyclic 
Maintenance and Cyclic Maintenance for Historic Properties program. 

[B] Visitor fee revenue include revenue collected from the Recreational 
Fee Program and the National Parks Passport Program. 

[End of table] 

Table 12: Operation of the National Park System Account and Visitor Fee 
Revenue, in Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Daily Operations Allocations: Park units; 
Fiscal year 2001: $903,149; 
Fiscal year 2002: $910,032; 
Fiscal year 2003: $906,376; 
Fiscal year 2004: $875,312; 
Fiscal year 2005: $892,924; 
Average annual change (%): -0.28. 

Daily Operations Allocations: National trail system; 
Fiscal year 2001: $4,758; 
Fiscal year 2002: $4,945; 
Fiscal year 2003: $4,759; 
Fiscal year 2004: $4,935; 
Fiscal year 2005: $5,143; 
Average annual change (%): 1.97. 

Daily Operations Allocations: Other field offices and affiliated areas; 
Fiscal year 2001: $7,607; 
Fiscal year 2002: $9,539; 
Fiscal year 2003: $9,492; 
Fiscal year 2004: $9,495; 
Fiscal year 2005: $11,052; 
Average annual change (%): 9.79. 

Total; 
Fiscal year 2001: $915,514; 
Fiscal year 2002: $924,516; 
Fiscal year 2003: $920,627; 
Fiscal year 2004: $889,742; 
Fiscal year 2005: $909,120; 
Average annual change (%): -0.18. 

Projects and other support programs: 

Support programs: 

Cyclic Maintenance[A]; 
Fiscal year 2001: $34,534; 
Fiscal year 2002: $31,270; 
Fiscal year 2003: $48,884; 
Fiscal year 2004: $58,845; 
Fiscal year 2005: $54,550; 
Average annual change (%): 12.11. 

Repair and Rehabilitation; 
Fiscal year 2001: $58,453; 
Fiscal year 2002: $70,319; 
Fiscal year 2003: $79,503; 
Fiscal year 2004: $85,373; 
Fiscal year 2005: $82,552; 
Average annual change (%): 9.01. 

Central offices; 
Fiscal year 2001: $119,379; 
Fiscal year 2002: $126,534; 
Fiscal year 2003: $122,814; 
Fiscal year 2004: $123,794; 
Fiscal year 2005: $120,760; 
Average annual change (%): 0.29. 

Field resource centers; 
Fiscal year 2001: 3,954; 
Fiscal year 2002: $4,051; 
Fiscal year 2003: 3,986; 
Fiscal year 2004: 3,843; 
Fiscal year 2005: 3,600; 
Average annual change (%): -2.32. 

Other support programs; 
Fiscal year 2001: $8,655; 
Fiscal year 2002: $10,508; 
Fiscal year 2003: $10,223; 
Fiscal year 2004: 2,752; 
Fiscal year 2005: 2,648; 
Average annual change (%): -25.63. 

Subtotal support programs; 
Fiscal year 2001: $224,975; 
Fiscal year 2002: $242,683; 
Fiscal year 2003: $265,411; 
Fiscal year 2004: $274,608; 
Fiscal year 2005: $264,110; 
Average annual change (%): 4.09. 

Servicewide programs: 

Training programs; 
Fiscal year 2001: $8,701; 
Fiscal year 2002: $11,841; 
Fiscal year 2003: $13,339; 
Fiscal year 2004: $12,561; 
Fiscal year 2005: $10,878; 
Average annual change (%): 5.74. 

Cooperative programs; 
Fiscal year 2001: $8,145; 
Fiscal year 2002: $9,822; 
Fiscal year 2003: $14,179; 
Fiscal year 2004: $16,474; 
Fiscal year 2005: $9,372; 
Average annual change (%): 3.57. 

Information technology programs; 
Fiscal year 2001: 0; 
Fiscal year 2002: 0; 
Fiscal year 2003: 0; 
Fiscal year 2004: $721; 
Fiscal year 2005: $4,444; 
Average annual change (%): n/a. 

Other servicewide Programs; 
Fiscal year 2001: $136,330; 
Fiscal year 2002: $147,910; 
Fiscal year 2003: $159,487; 
Fiscal year 2004: $168,170; 
Fiscal year 2005: $160,410; 
Average annual change (%): 4.15. 

Subtotal servicewide programs; 
Fiscal year 2001: $153,176; 
Fiscal year 2002: $169,573; 
Fiscal year 2003: $187,006; 
Fiscal year 2004: $197,926; 
Fiscal year 2005: $185,104; 
Average annual change (%): 4.85. 

Subtotal external administrative costs; 
Fiscal year 2001: $99,408; 
Fiscal year 2002: $101,948; 
Fiscal year 2003: $101,350; 
Fiscal year 2004: $102,126; 
Fiscal year 2005: $107,582; 
Average annual change (%): 2.00. 

Total projects and other support programs; 
Fiscal year 2001: $477,559; 
Fiscal year 2002: $514,204; 
Fiscal year 2003: $553,766; 
Fiscal year 2004: $574,659; 
Fiscal year 2005: $556,797; 
Average annual change (%): 3.91. 

Total for Operation of the National Park System account; 
Fiscal year 2001: $1,393,073; 
Fiscal year 2002: $1,438,720; 
Fiscal year 2003: $1,474,393; 
Fiscal year 2004: $1,464,401; 
Fiscal year 2005: $1,465,917; 
Average annual change (%): 1.28. 

Visitor fee revenue[B]; 
Fiscal year 2001: $140,413; 
Fiscal year 2002: $136,493; 
Fiscal year 2003: $132,331; 
Fiscal year 2004: $134,676; 
Fiscal year 2005: $127,435; 
Average annual change (%): - 2.40. 

Source: GAO analysis of National Park Service data. 

Note: Inflation adjusted figures are in 2001 dollars. 

[A] Cyclic Maintenance allocations include both Regular Cyclic 
Maintenance and Cyclic Maintenance for Historic Properties allocations. 

[B] Visitor fee revenue include revenue collected from the Recreational 
Fee Program and the National Parks Passport Program receipts. 

[End of table] 

[End of section] 

Appendix III: Summary of Funding and Personnel Trends for 12 Selected 
Park Units: 

The following tables summarize the data collected from 12 selected park 
units including 2001 through 2005 total park unit labor expenditures; 
personnel levels by funding source; employee and labor cost per 
retirement system (CSRS and FERS); and funding levels by other funding 
source types. 

Table 13: Total Personnel Expenditures at 12 Selected Park Units, in 
Nominal Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Park unit: Acadia NP; 
Total personnel expenditures[A]: 2001: $3,524; 
Total personnel expenditures[A]: 2002: $4,278; 
Total personnel expenditures[A]: 2003: $4,796; 
Total personnel expenditures[A]: 2004: $5,060; 
Total personnel expenditures[A]: 2005: $5,313; 
Average annual change (%): 10.8. 

Park unit: Badlands NP; 
Total personnel expenditures[A]: 2001: $2,273; 
Total personnel expenditures[A]: 2002: $2,417; 
Total personnel expenditures[A]: 2003: $2,453; 
Total personnel expenditures[A]: 2004: $2,635; 
Total personnel expenditures[A]: 2005: $2,598; 
Average annual change (%): 3.4. 

Park unit: Bryce Canyon NP; 
Total personnel expenditures[A]: 2001: $2,204; 
Total personnel expenditures[A]: 2002: $2,165; 
Total personnel expenditures[A]: 2003: $2,028; 
Total personnel expenditures[A]: 2004: $2,101; 
Total personnel expenditures[A]: 2005: $2,306; 
Average annual change (%): 1.1. 

Park unit: Gettysburg NMP; 
Total personnel expenditures[A]: 2001: $4,460; 
Total personnel expenditures[A]: 2002: $4,593; 
Total personnel expenditures[A]: 2003: $4,537; 
Total personnel expenditures[A]: 2004: $4,574; 
Total personnel expenditures[A]: 2005: $4,772; 
Average annual change (%): 1.7. 

Park unit: Grand Canyon NP; 
Total personnel expenditures[A]: 2001: $13,409; 
Total personnel expenditures[A]: 2002: $13,413; 
Total personnel expenditures[A]: 2003: $14,226; 
Total personnel expenditures[A]: 2004: $14,286; 
Total personnel expenditures[A]: 2005: $14,529; 
Average annual change (%): 2.0. 

Park unit: Grand Teton NP; 
Total personnel expenditures[A]: 2001: $6,509; 
Total personnel expenditures[A]: 2002: $6,566; 
Total personnel expenditures[A]: 2003: $6,669; 
Total personnel expenditures[A]: 2004: $7,762; 
Total personnel expenditures[A]: 2005: $7,746; 
Average annual change (%): 4.4. 

Park unit: Mount Rushmore NMem; 
Total personnel expenditures[A]: 2001: $2,014; 
Total personnel expenditures[A]: 2002: $1,906; 
Total personnel expenditures[A]: 2003: $2,263; 
Total personnel expenditures[A]: 2004: $2,601; 
Total personnel expenditures[A]: 2005: $2,939; 
Average annual change (%): 9.9. 

Park unit: Sequoia and Kings Canyon NP; 
Total personnel expenditures[A]: 2001: $9,164; 
Total personnel expenditures[A]: 2002: $10,011; 
Total personnel expenditures[A]: 2003: $10,216; 
Total personnel expenditures[A]: 2004: $10,361; 
Total personnel expenditures[A]: 2005: $10,600; 
Average annual change (%): 3.7. 

Park unit: Shenandoah NP; 
Total personnel expenditures[A]: 2001: $8,578; 
Total personnel expenditures[A]: 2002: $8,889; 
Total personnel expenditures[A]: 2003: $9,047; 
Total personnel expenditures[A]: 2004: $8,865; 
Total personnel expenditures[A]: 2005: $8,774; 
Average annual change (%): 0.6. 

Park unit: Yellowstone NP; 
Total personnel expenditures[A]: 2001: $17,587; 
Total personnel expenditures[A]: 2002: $19,011; 
Total personnel expenditures[A]: 2003: $20,113; 
Total personnel expenditures[A]: 2004: $21,069; 
Total personnel expenditures[A]: 2005: $22,071; 
Average annual change (%): 5.8. 

Park unit: Yosemite NP; 
Total personnel expenditures[A]: 2001: $17,602; 
Total personnel expenditures[A]: 2002: $19,858; 
Total personnel expenditures[A]: 2003: $20,616; 
Total personnel expenditures[A]: 2004: $20,248; 
Total personnel expenditures[A]: 2005: $20,444; 
Average annual change (%): 3.8. 

Park unit: Zion NP; 
Total personnel expenditures[A]: 2001: $4,268; 
Total personnel expenditures[A]: 2002: $4,648; 
Total personnel expenditures[A]: 2003: $4,866; 
Total personnel expenditures[A]: 2004: $4,862; 
Total personnel expenditures[A]: 2005: $5,094; 
Average annual change (%): 4.5. 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO analysis of National Park Service data. 

[A] Personnel costs include salaries and benefits for permanent 
employees and salaries for seasonal employees. 

[End of table] 

Table 14: Total Personnel Expenditures at 12 Selected Park Units, in 
Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Park unit: Acadia NP; 
Total personnel expenditures[A]: 2001: $3,524; 
Total personnel expenditures[A]: 2002: $4,141; 
Total personnel expenditures[A]: 2003: $4,520; 
Total personnel expenditures[A]: 2004: $4,576; 
Total personnel expenditures[A]: 2005: $4,613; 
Average annual change (%): 7.0. 

Park unit: Badlands NP; 
Total personnel expenditures[A]: 2001: $2,273; 
Total personnel expenditures[A]: 2002: $2,340; 
Total personnel expenditures[A]: 2003: $2,312; 
Total personnel expenditures[A]: 2004: $2,383; 
Total personnel expenditures[A]: 2005: $2,256; 
Average annual change (%): -0.2. 

Park unit: Bryce Canyon NP; 
Total personnel expenditures[A]: 2001: $2,204; 
Total personnel expenditures[A]: 2002: $2,096; 
Total personnel expenditures[A]: 2003: $1,911; 
Total personnel expenditures[A]: 2004: $1,900; 
Total personnel expenditures[A]: 2005: $2,002; 
Average annual change (%): -2.4. 

Park unit: Gettysburg NMP; 
Total personnel expenditures[A]: 2001: $4,460; 
Total personnel expenditures[A]: 2002: $4,446; 
Total personnel expenditures[A]: 2003: $4,276; 
Total personnel expenditures[A]: 2004: $4,137; 
Total personnel expenditures[A]: 2005: $4,143; 
Average annual change (%): -1.8. 

Park unit: Grand Canyon NP; 
Total personnel expenditures[A]: 2001: $13,409; 
Total personnel expenditures[A]: 2002: $12,983; 
Total personnel expenditures[A]: 2003: $13,407; 
Total personnel expenditures[A]: 2004: $12,919; 
Total personnel expenditures[A]: 2005: $12,614; 
Average annual change (%): -1.5. 

Park unit: Grand Teton NP; 
Total personnel expenditures[A]: 2001: $6,509; 
Total personnel expenditures[A]: 2002: $6,356; 
Total personnel expenditures[A]: 2003: $6,285; 
Total personnel expenditures[A]: 2004: $7,019; 
Total personnel expenditures[A]: 2005: $6,724; 
Average annual change (%): 0.8. 

Park unit: Mount Rushmore NMem; 
Total personnel expenditures[A]: 2001: $2,014; 
Total personnel expenditures[A]: 2002: $1,845; 
Total personnel expenditures[A]: 2003: $2,133; 
Total personnel expenditures[A]: 2004: $2,352; 
Total personnel expenditures[A]: 2005: $2,552; 
Average annual change (%): 6.1. 

Park unit: Sequoia and Kings Canyon NP; 
Total personnel expenditures[A]: 2001: $9,164; 
Total personnel expenditures[A]: 2002: $9,691; 
Total personnel expenditures[A]: 2003: $9,628; 
Total personnel expenditures[A]: 2004: $9,369; 
Total personnel expenditures[A]: 2005: $9,202; 
Average annual change (%): 0.1. 

Park unit: Shenandoah NP; 
Total personnel expenditures[A]: 2001: $8,578; 
Total personnel expenditures[A]: 2002: $8,605; 
Total personnel expenditures[A]: 2003: $8,526; 
Total personnel expenditures[A]: 2004: $8,017; 
Total personnel expenditures[A]: 2005: $7,617; 
Average annual change (%): -2.9. 

Park unit: Yellowstone NP; 
Total personnel expenditures[A]: 2001: $17,587; 
Total personnel expenditures[A]: 2002: $18,403; 
Total personnel expenditures[A]: 2003: $18,957; 
Total personnel expenditures[A]: 2004: $19,053; 
Total personnel expenditures[A]: 2005: $19,161; 
Average annual change (%): 2.2. 

Park unit: Yosemite NP; 
Total personnel expenditures[A]: 2001: $17,601; 
Total personnel expenditures[A]: 2002: $19,223; 
Total personnel expenditures[A]: 2003: $19,430; 
Total personnel expenditures[A]: 2004: $18,310; 
Total personnel expenditures[A]: 2005: $17,748; 
Average annual change (%): 0.2. 

Park unit: Zion NP; 
Total personnel expenditures[A]: 2001: $4,268; 
Total personnel expenditures[A]: 2002: $4,500; 
Total personnel expenditures[A]: 2003: $4,586; 
Total personnel expenditures[A]: 2004: $4,397; 
Total personnel expenditures[A]: 2005: $4,422; 
Average annual change (%): 0.9. 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO analysis of National Park Service data. 

[A] Personnel costs include salaries and benefits for permanent 
employees and salaries for seasonal employees. 

[End of table] 

Table 15: Personnel (Full Time Equivalent) by Funding Source at 12 
Selected Park Units, Fiscal Years 2001 through 2005: 

[See PDF for image] 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO analysis of National Park Service data from 12 selected 
park units. 

Note: We provided each park with uniform instructions for completing 
our data request. However, each park is unique and some parks had to 
make assumptions and estimates to produce their data, particularly when 
source data for a specific data request from GAO could not be retrieved 
directly from a database. For example, AFSIII did not provide a 
breakdown of FTE by permanent and seasonal for ONPS costs versus all 
other funds for all 5 years. In addition, some parks had to make 
assumptions about which FTEs should or should not be included in their 
answers to GAO. A particular issue was that due to the fire season, 
fire personnel (FTE) were shared among some parks, making the 
calculations difficult. GAO did some follow up work to better 
understand the decisions that individual parks made with regard to 
reporting FTEs. 

[End of table] 

Table 16: Employee Numbers and Nominal Personnel Costs Per Retirement 
System at 12 Selected Park Units, Fiscal Years 2001 through 2005: 

[See PDF for image] 

Legend: 

NP = National Park: 

NMP = National Military Park: 

NMem = National Memorial: 

CSRS = Civil Service Retirement System: 

FERS = Federal Employee Retirement System: 

Source: GAO analysis of National Park Service data from 12 selected 
park units. 

[End of table] 

Table 17: Employee Numbers and Inflation-Adjusted Personnel Costs Per 
Retirement System at 12 Selected Park Units, Fiscal Years 2001 through 
2005: 

[See PDF for image] 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 
CSRS = Civil Service Retirement System: 
FERS = Federal Employee Retirement System: 

Source: GAO analysis of National Park Service data from 12 selected 
park units. 

[End of table] 

Table 18: Other Authorized Funding Source Amounts for 12 Selected Park 
Units, in Nominal Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Park unit: Acadia NP: 

Other authorized funding source type: Visitor fees; 
2001: $1,843; 
2002: $2,011; 
2003: $1,907; 
2004: $2,165; 
2005: $1,870. 

Other authorized funding source type: Concession fees; 
2001: $105; 
2002: $109; 
2003: $164; 
2004: $381; 
2005: $350. 

Other authorized funding source type: Donations; 
2001: $395; 
2002: $313; 
2003: $368; 
2004: $514; 
2005: $291. 

Other authorized funding source type: Other revenue; 
2001: $132; 
2002: $136; 
2003: $180; 
2004: $192; 
2005: $66. 

Park unit: Badlands NP: 

Other authorized funding source type: Visitor fees; 
2001: $1,166; 
2002: $1,278; 
2003: $1,304; 
2004: $1,291; 
2005: $1,277. 

Other authorized funding source type: Concession fees; 
2001: $22; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Donations; 
2001: $42; 
2002: $3; 
2003: $8; 
2004: $9; 
2005: $3. 

Other authorized funding source type: Other revenue; 
2001: $2; 
2002: $1; 
2003: $1; 
2004: $2; 
2005: $3. 

Park unit: Bryce Canyon NP: 

Other authorized funding source type: Visitor fees; 
2001: $1,538; 
2002: $1,563; 
2003: $1,285; 
2004: $1,415; 
2005: $1,359. 

Other authorized funding source type: Concession fees; 
2001: $0; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $2. 

Other authorized funding source type: Donations; 
2001: $100; 
2002: $8; 
2003: $21; 
2004: $4; 
2005: $104. 

Other authorized funding source type: Other revenue; 
2001: $1,062; 
2002: $1,106; 
2003: $1,084; 
2004: $1,105; 
2005: $1,097. 

Park unit: Gettysburg NMP: 

Other authorized funding source type: Visitor fees; 
2001: $132; 
2002: $120; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Concession fees; 
2001: $0; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Donations; 
2001: $239; 
2002: $214; 
2003: $169; 
2004: $463; 
2005: $236. 

Other authorized funding source type: Other revenue; 
2001: $137; 
2002: $155; 
2003: $155; 
2004: $182; 
2005: $200. 

Park unit: Grand Canyon NP: 

Other authorized funding source type: Visitor fees; 
2001: $16,661; 
2002: $14,558; 
2003: $13,702; 
2004: $14,425; 
2005: $13,927. 

Other authorized funding source type: Concession Fees; 
2001: $5,750; 
2002: $4,091; 
2003: $3,591; 
2004: $3,337; 
2005: $5,787. 

Other authorized funding source type: Donations; 
2001: $176; 
2002: $254; 
2003: $301; 
2004: $287; 
2005: $227. 

Other authorized funding source type: Other revenue; 
2001: $2,766; 
2002: $2,850; 
2003: $2,581; 
2004: $2,731; 
2005: $3,216. 

Park unit: Grand Teton NP: 

Other authorized funding source type: Visitor fees; 
2001: $4,602; 
2002: $4,755; 
2003: $4,840; 
2004: $4,626; 
2005: $3,475. 

Other authorized funding source type: Concession fees; 
2001: $0; 
2002: $0; 
2003: $1,208; 
2004: $1,557; 
2005: $930. 

Other authorized funding source type: Donations; 
2001: $188; 
2002: $125; 
2003: $457; 
2004: $402; 
2005: $8,744. 

Other authorized funding source type: Other revenue; 
2001: $107; 
2002: $137; 
2003: $165; 
2004: $158; 
2005: $163. 

Park unit: Mount Rushmore NMem: 

Other authorized funding source type: Visitor fees; 
2001: $0; 
2002: $3; 
2003: $3; 
2004: $4; 
2005: $8. 

Other authorized funding source type: Concession fees; 
2001: $0; 
2002: $361; 
2003: $238; 
2004: $843; 
2005: $648. 

Other authorized funding source type: Donations; 
2001: $66; 
2002: $197; 
2003: $261; 
2004: $236; 
2005: $274. 

Other authorized funding source type: Other revenue; 
2001: $184; 
2002: $183; 
2003: $170; 
2004: $176; 
2005: $173. 

Park unit: Shenandoah NP: 

Other authorized funding source type: Visitor fees; 
2001: $3,051; 
2002: $3,105; 
2003: $2,695; 
2004: $2,828; 
2005: $2,777. 

Other authorized funding source type: Concession fees; 
2001: $185; 
2002: $166; 
2003: $133; 
2004: $189; 
2005: $210. 

Other authorized funding source type: Donations; 
2001: $8; 
2002: $64; 
2003: $41; 
2004: $8; 
2005: $39. 

Other authorized funding source type: Other revenue; 
2001: $7; 
2002: $5; 
2003: $3; 
2004: $7; 
2005: $7. 

Park unit: Sequoia and Kings Canyon NP: 

Other authorized funding source type: Visitor fees; 
2001: $2,151; 
2002: $2,395; 
2003: $2,458; 
2004: $2,474; 
2005: $2,154. 

Other authorized funding source type: Concession fees; 
2001: $1; 
2002: $2; 
2003: $0; 
2004: $7; 
2005: $150. 

Other authorized funding source type: Donations; 
2001: $69; 
2002: $131; 
2003: $24; 
2004: $29; 
2005: $51. 

Other authorized funding source type: Other revenue; 
2001: $1,174; 
2002: $1,451; 
2003: $1,394; 
2004: $1,331; 
2005: $1,266. 

Park unit: Yellowstone NP: 

Other authorized funding source type: Visitor fees; 
2001: $5,027; 
2002: $5,185; 
2003: $4,667; 
2004: $4,180; 
2005: $4,053. 

Other authorized funding source type: Concession fees; 
2001: $547; 
2002: $521; 
2003: $829; 
2004: $267; 
2005: $297. 

Other authorized funding source type: Donations; 
2001: $207; 
2002: $445; 
2003: $650; 
2004: $1,578; 
2005: $2,200. 

Other authorized funding source type: Other revenue; 
2001: $5,529; 
2002: $5,584; 
2003: $6,416; 
2004: $5,823; 
2005: $5,817. 

Park unit: Yosemite NP: 

Other authorized funding source type: Visitor fees; 
2001: $15,330; 
2002: $14,559; 
2003: $14,263; 
2004: $15,521; 
2005: $14,246. 

Other authorized funding source type: Concession fees; 
2001: $134; 
2002: $154; 
2003: $1,576; 
2004: $969; 
2005: $1,001. 

Other authorized funding source type: Donations; 
2001: $848; 
2002: $777; 
2003: $974; 
2004: $1,940; 
2005: $1,601. 

Other authorized funding source type: Other revenue; 
2001: $7,692; 
2002: $9,177; 
2003: $8,529; 
2004: $10,776; 
2005: $10,012. 

Park unit: Zion NP: 

Other authorized funding source type: Visitor fees; 
2001: $4,542; 
2002: $3,022; 
2003: $2,921; 
2004: $3,355; 
2005: $3,902. 

Other authorized funding source type: Concession fees; 
2001: $4; 
2002: $4; 
2003: $3; 
2004: $6; 
2005: $11. 

Other authorized funding source type: Donations; 
2001: $0; 
2002: $14; 
2003: $0; 
2004: $0; 
2005: $1. 

Other authorized funding source type: Other revenue; 
2001: $379; 
2002: $475; 
2003: $499; 
2004: $559; 
2005: $719. 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO analysis of National Park Service data from 12 selected 
park units. 

Note: The other revenue category includes authorized revenue collected 
from various other miscellaneous sources. Examples of other revenue 
include rent collected through employee housing, transportation fees, 
cell tower permits, boat permits, and outfitter permits. 

[End of table] 

Table 19: Other Authorized Funding Source Amounts for 12 Selected Park 
Units, in Inflation-Adjusted Dollars, Fiscal Years 2001 through 2005: 

Dollars in thousands. 

Acadia NP: 

Other authorized funding source type: Visitor Fees; 
2001: $1,843; 
2002: $1,947; 
2003: $1,798; 
2004: $1,958; 
2005: $1,623. 

Other authorized funding source type: Concession Fees; 
2001: $105; 
2002: $106; 
2003: $154; 
2004: $345; 
2005: $304. 

Other authorized funding source type: Donations; 
2001: $395; 
2002: $303; 
2003: $346; 
2004: $465; 
2005: $252. 

Other authorized funding source type: Other Revenue; 
2001: 132; 
2002: $131; 
2003: $170; 
2004: $173; 
2005: $57. 

Badlands NP: 

Other authorized funding source type: Visitor Fees; 
2001: $1,166; 
2002: $1,237; 
2003: $1,229; 
2004: $1,168; 
2005: $1,108. 

Other authorized funding source type: Concession Fees; 
2001: $22; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Donations; 
2001: $42; 
2002: $3; 
2003: $7; 
2004: $9; 
2005: $2. 

Other authorized funding source type: Other Revenue; 
2001: $2; 
2002: $1; 
2003: $1; 
2004: $2; 
2005: $3. 

Bryce Canyon NP: 

Other authorized funding source type: Visitor Fees; 
2001: $1,538; 
2002: $1,513; 
2003: $1,211; 
2004: $1,280; 
2005: $1,179. 

Other authorized funding source type: Concession Fees; 
2001: $0; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $2. 

Other authorized funding source type: Donations; 
2001: $100; 
2002: $8; 
2003: $19; 
2004: $4; 
2005: $91. 

Other authorized funding source type: Other Revenue; 
2001: $1,062; 
2002: $1,071; 
2003: $1,021; 
2004: $999; 
2005: $952. 

Gettysburg NMP: 

Other authorized funding source type: Visitor Fees; 
2001: $132; 
2002: $116; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Concession Fees; 
2001: $0; 
2002: $0; 
2003: $0; 
2004: $0; 
2005: $0. 

Other authorized funding source type: Donations; 
2001: $239; 
2002: $208; 
2003: $159; 
2004: $419; 
2005: $205. 

Other authorized funding source type: Other Revenue; 
2001: $137; 
2002: $150; 
2003: $146; 
2004: $165; 
2005: $174. 

Grand Canyon NP: 

Other authorized funding source type: Visitor Fees; 
2001: $16,661; 
2002: $14,092; 
2003: $12,914; 
2004: $13,045; 
2005: $12,091. 

Other authorized funding source type: Concession Fees; 
2001: $5,750; 
2002: 3,960; 
2003: $3,385; 
2004: $3,018; 
2005: $5,024. 

Other authorized funding source type: Donations; 
2001: $176; 
2002: $246; 
2003: $284; 
2004: $255; 
2005: $197. 

Other authorized funding source type: Other Revenue; 
2001: $2,766; 
2002: $2,759; 
2003: $2,432; 
2004: $2,469; 
2005: $2,792. 

Grand Teton NP: 

Other authorized funding source type: Visitor Fees; 
2001: $4,602; 
2002: $4,603; 
2003: $4,561; 
2004: $4,183; 
2005: $3,017. 

Other authorized funding source type: Concession Fees; 
2001: $0; 
2002: $0; 
2003: $1,139; 
2004: $1,408; 
2005: $807. 

Other authorized funding source type: Donations; 
2001: $188; 
2002: $121; 
2003: $431; 
2004: $364; 
2005: $7,591. 

Other authorized funding source type: Other Revenue; 
2001: $107; 
2002: $133; 
2003: $156; 
2004: $143; 
2005: $141. 

Mount Rushmore NMem: 

Other authorized funding source type: Visitor Fees; 
2001: $0; 
2002: $3; 
2003: $3; 
2004: $3; 
2005: $7. 

Other authorized funding source type: Concession Fees; 
2001: $0; 
2002: $350; 
2003: $224; 
2004: $763; 
2005: $562. 

Other authorized funding source type: Donations; 
2001: $66; 
2002: $190; 
2003: $246; 
2004: $213; 
2005: $237. 

Other authorized funding source type: Other Revenue; 
2001: $184; 
2002: $177; 
2003: $161; 
2004: $159; 
2005: $150. 

Shenandoah NP: 

Other authorized funding source type: Visitor Fees; 
2001: $3,051; 
2002: $3,005; 
2003: $2,540; 
2004: $2,557; 
2005: $2,411. 

Other authorized funding source type: Concession Fees; 
2001: $185; 
2002: $160; 
2003: $125; 
2004: $171; 
2005: $183. 

Other authorized funding source type: Donations; 
2001: $8; 
2002: $62; 
2003: $39; 
2004: $8; 
2005: $34. 

Other authorized funding source type: Other Revenue; 
2001: $7; 
2002: $5; 
2003: $3; 
2004: $7; 
2005: $6. 

Sequoia and Kings Canyon NP: 

Other authorized funding source type: Visitor Fees; 
2001: $2,151; 
2002: $2,319; 
2003: $2,317; 
2004: $2,238; 
2005: $1,870. 

Other authorized funding source type: Concession Fees; 
2001: $1; 
2002: $2; 
2003: $0; 
2004: $6; 
2005: $130. 

Other authorized funding source type: Donations; 
2001: $69; 
2002: $127; 
2003: $22; 
2004: $26; 
2005: $44. 

Other authorized funding source type: Other Revenue; 
2001: $1,174; 
2002: $1,404; 
2003: $1,314; 
2004: $1,204; 
2005: $1,099. 

Yellowstone NP: 

Other authorized funding source type: Visitor Fees; 
2001: $5,027; 
2002: $5,020; 
2003: $4,398; 
2004: $3,780; 
2005: $3,519. 

Other authorized funding source type: Concession Fees; 
2001: $547; 
2002: $504; 
2003: $782; 
2004: $242; 
2005: $258. 

Other authorized funding source type: Donations; 
2001: $207; 
2002: $431; 
2003: $613; 
2004: $1,427; 
2005: $1,910. 

Other authorized funding source type: Other Revenue; 
2001: $5,529; 
2002: $5,405; 
2003: $6,047; 
2004: $5,266; 
2005: $5,050. 

Yosemite NP: 

Other authorized funding source type: Visitor Fees; 
2001: $15,330; 
2002: $14,093; 
2003: $13,443; 
2004: $14,036; 
2005: $12,367. 

Other authorized funding source type: Concession Fees; 
2001: $134; 
2002: $149; 
2003: $1,485; 
2004: $876; 
2005: $869. 

Other authorized funding source type: Donations; 
2001: $848; 
2002: $752; 
2003: $918; 
2004: $1,755; 
2005: $1,390. 

Other authorized funding source type: Other Revenue; 
2001: $7,692; 
2002: $8,883; 
2003: $8,039; 
2004: $9,745; 
2005: $8,692. 

Zion NP: 

Other authorized funding source type: Visitor Fees; 
2001: $4,542; 
2002: $2,926; 
2003: $2,754; 
2004: $3,033; 
2005: $3,388. 

Other authorized funding source type: Concession Fees; 
2001: $4; 
2002: $4; 
2003: $3; 
2004: $5; 
2005: $9. 

Other authorized funding source type: Donations; 
2001: $0; 
2002: $13; 
2003: $0; 
2004: $0; 
2005: $1. 

Other authorized funding source type: Other Revenue; 
2001: $379; 
2002: $460; 
2003: $471; 
2004: $506; 
2005: $623. 

Legend: 

NP = National Park: 
NMP = National Military Park: 
NMem = National Memorial: 

Source: GAO analysis of National Park Service data from 12 selected 
park units: 

Note: The other revenue category includes authorized revenue collected 
from various other miscellaneous sources. Examples include rent 
collected through employee housing, transportation fees, cell tower 
permits, boat permits, and outfitter permits. 

[End of table] 

[End of section] 

Appendix IV: Recreation Visitation Trends for the Park Service and 12 
Selected Park Units, Fiscal Years 2001 through 2005: 

Table 20 shows, for fiscal years 2001 through 2005, recreation 
visitation trends for the 12 selected park units we visited compared to 
the entire Park Service. 

Table 20: Recreation Visitation Trends for the Park Service and 12 
Selected Park Units, Fiscal Years 2001 through 2005: 

Park unit: Acadia NP; 
Fiscal year 2001: 2,504,708; 
Fiscal year 2002: 2,550,589; 
Fiscal year 2003: 2,433,494; 
Fiscal year 2004: 2,219,891; 
Fiscal year 2005: 2,103,398; 
Average: 2,362,416; 
Average annual change FYs 2001-2005 (%): -4.3%. 

Park unit: Badlands NP; 
Fiscal year 2001: 956,268; 
Fiscal year 2002: 906,869; 
Fiscal year 2003: 872,968; 
Fiscal year 2004: 921,755; 
Fiscal year 2005: 924,354; 
Average: 916,443; 
Average annual change FYs 2001-2005 (%): - 0.8%. 

Park unit: Bryce Canyon NP; 
Fiscal year 2001: 1,076,895; 
Fiscal year 2002: 899,221; 
Fiscal year 2003: 883,170; 
Fiscal year 2004: 1,006,471; 
Fiscal year 2005: 1,005,957; 
Average: 974,343; 
Average annual change FYs 2001-2005 (%): -1.7%. 

Park unit: Gettysburg NMP; 
Fiscal year 2001: 1,779,610; 
Fiscal year 2002: 1,829,794; 
Fiscal year 2003: 1,753,412; 
Fiscal year 2004: 1,756,451; 
Fiscal year 2005: 1,716,467; 
Average: 1,767,147; 
Average annual change FYs 2001-2005 (%): -0.9%. 

Park unit: Grand Canyon NP; 
Fiscal year 2001: 4,219,726; 
Fiscal year 2002: 3,936,828; 
Fiscal year 2003: 4,102,541; 
Fiscal year 2004: 4,334,614; 
Fiscal year 2005: 4,367,932; 
Average: 4,192,328; 
Average annual change FYs 2001-2005 (%): 0.9%. 

Park unit: Grand Teton NP; 
Fiscal year 2001: 2,531,844; 
Fiscal year 2002: 2,606,497; 
Fiscal year 2003: 2,466,543; 
Fiscal year 2004: 2,287,662; 
Fiscal year 2005: 2,459,508; 
Average: 2,470,411; 
Average annual change FYs 2001-2005 (%): -0.7%. 

Park unit: Mt Rushmore NMem; 
Fiscal year 2001: 1,862,674; 
Fiscal year 2002: 2,159,718; 
Fiscal year 2003: 2,212,178; 
Fiscal year 2004: 2,045,798; 
Fiscal year 2005: 2,052,967; 
Average: 2,066,667; 
Average annual change FYs 2001-2005 (%): 2.5%. 

Park unit: Sequoia and Kings Canyon NP; 
Fiscal year 2001: 1,419,075; 
Fiscal year 2002: 1,418,519; 
Fiscal year 2003: 1,552,258; 
Fiscal year 2004: 1,531,947; 
Fiscal year 2005: 1,556,547; 
Average: 1,495,669; 
Average annual change FYs 2001-2005 (%): 2.3%. 

Park unit: Shenandoah NP; 
Fiscal year 2001: 1,514,739; 
Fiscal year 2002: 1,511,020; 
Fiscal year 2003: 1,127,958; 
Fiscal year 2004: 1,290,812; 
Fiscal year 2005: 1,141,102; 
Average: 1,317,126; 
Average annual change FYs 2001-2005 (%): -6.8%. 

Park unit: Yellowstone NP; 
Fiscal year 2001: 2,769,775; 
Fiscal year 2002: 2,969,876; 
Fiscal year 2003: 2,995,640; 
Fiscal year 2004: 2,900,971; 
Fiscal year 2005: 2,828,536; 
Average: 2,892,960; 
Average annual change FYs 2001-2005 (%): 0.5%. 

Park unit: Yosemite NP; 
Fiscal year 2001: 3,453,345; 
Fiscal year 2002: 3,305,636; 
Fiscal year 2003: 3,380,038; 
Fiscal year 2004: 3,356,028; 
Fiscal year 2005: 3,212,295; 
Average: 3,341,468; 
Average annual change FYs 2001-2005 (%): -1.8%. 

Park unit: Zion NP; 
Fiscal year 2001: 2,269,328; 
Fiscal year 2002: 2,510,630; 
Fiscal year 2003: 2,451,977; 
Fiscal year 2004: 2,684,977; 
Fiscal year 2005: 2,587,781; 
Average: 2,500,939; 
Average annual change FYs 2001-2005 (%): 3.3%. 

Park unit: Subtotal, 12 selected park units; 
Fiscal year 2001: 26,357,987; 
Fiscal year 2002: 26,605,197; 
Fiscal year 2003: 26,232,177; 
Fiscal year 2004: 26,337,377; 
Fiscal year 2005: 25,956,844; 
Average: 26,297,916; 
Average annual change FYs 2001-2005 (%): -0.4%. 

Park unit: Total for entire Park Service; 
Fiscal year 2001: 284,267,032; 
Fiscal year 2002: 274,202,072; 
Fiscal year 2003: 265,470,541; 
Fiscal year 2004: 276,363,931; 
Fiscal year 2005: 271,196,534; 
Average: 274,300,022; 
Average annual change FYs 2001-2005 (%): -1.2. 

Source: GAO analysis of Park Service data. 

Note: The Park Service defines a recreation visit as the entry of a 
person onto lands or waters administered by the Park Service for 
recreational purposes excluding government personnel, through traffic 
(commuters), trades-persons and persons residing within park unit 
boundaries. 

[End of table] 

[End of section] 

Appendix V: Comments from the Department of the Interior: 

United States Department of the Interior: 
OFFICE OF THE SECRETARY: 
Washington, D.C. 20240: 

MAR 27 2006: 

Ms. Robin M. Nazzaro: 
Director, Natural Resources and Environment: 
U.S. Government Accountability Office: 
441 G Street, NW: 
Washington, D.C. 20548: 

Dear Ms. Nazzaro: 

Thank you for the opportunity to review your draft report on the 
National Park Service Fiscal Year 2001 through 2005 Funding Trends and 
Impacts on Operations. 

We appreciate the diligent work of the team that prepared the report 
and the large amount of data that they collected. We are concerned, 
however, that the presentation of data in the report creates a 
misleading impression concerning the state of park operations. 

Record high levels of funds are being invested to staff and improve our 
parks. The 2005 operations budget provided, in the aggregate, record 
levels of funding on a per acre, per employee and per visitor basis 
although funding at individual parks and for individual programs 
varied. 

The overall 2005 Operations of the National Park System appropriation 
account of $1.7 billion was 21 percent higher than the enacted 2001 
appropriation. Over time, the national parks have received 
significantly more funding increases than most non-defense government 
programs. Through 2005, national park operating funds had increased 352 
percent since 1980 compared to overall domestic increases of 138 
percent. 

The draft report, by focusing only on selected aspects of the park 
budget, fails to adequately recognize this broader picture. The draft 
also focuses almost exclusively on financial inputs and does not 
examine the results achieved with these inputs. Set forth below are 
several areas of concern with the report. 

Provides Misleading Impression that Park Budgets Have Not Been 
Emphasized: 

The GAO Report is an incomplete analysis of the financial status of the 
national park units. Neither the analysis nor the anecdotal evidence 
from the several parks which were visited is presented within the full 
context of the operational needs and priorities of the National Park 
Service. The report gives a misleading impression that park operational 
funding has not been emphasized over the past 5 years. Within a 
constrained fiscal environment, park operations have been a high 
priority for both the Administration and the Congress: 

* Park base operations funding increased by $128.6 million from 2001 to 
2005, an increase of 14 percent. 

* Funding for the visitor services subactivity of the NPS budget 
increased by $50 million, an increase of 17 percent. 

Within the Park Service budget, the total for park base operations 
increased more in dollar terms than for any other single NPS program 
between 2001 and 2005. Putting these increases in context, funding for 
Department of the Interior programs in the Interior and Related 
Agencies appropriations acts from 2001 to 2005 (excluding contingent 
emergency appropriations) increased by a net amount of $542 million. 
The increase for park base operations amounts to 24 percent of this net 
increase. 

Presents False Dichotomy Between Operations and Project Funding: 

The report draws a false dichotomy between operations and project 
funding. Operations funding is used for activities including ranger 
interpretive programs, staffing at visitor centers, daily maintenance 
activities, and other programs designed to enhance visitor services. 
However, the visitor experience at national parks is shaped not only by 
direct visitor services activities, such as interpretation, but also by 
the condition of park facilities and park natural resources. 

Over the last decade, a consensus emerged that the National Park 
Service had not invested adequately in either the maintenance of its 
facilities or the monitoring and protection of the natural resources in 
its charge. In the case of facilities, several GAO reports highlighted 
the critical importance of facilities maintenance. GAO report RCED-98- 
143, for example, stated, "The proper care and maintenance of the 
national parks and their supporting infrastructure are essential to the 
continued use and enjoyment of our great national treasures by this and 
future generations." 

Recognizing these deficiencies, budgets from 2002 through 2005 included 
significant new investments above 2001 in facilities and natural 
resources. FY 2005 funding for repair and rehabilitation was increased 
by $39.6 million (71.5%) compared to FY 2001 and funding for cyclic 
maintenance critical to maintaining the condition of park facilities 
was increased by $30.5 million (94.5%) over 2001. In addition, budgets 
from 2002 through 2005 continued funding for construction and major 
maintenance at levels double those of the mid-1990s. Since 2001, the 
National Park Service has undertaken nearly 6,000 facility improvement 
projects, resulting in improved roads and trails, rehabilitated visitor 
centers, more accessible campgrounds, stabilized historic structures, 
and visitor satisfaction rates that are consistently high. Maintenance 
of park roads is also funded through the Federal Highways program. From 
2002 through 2005, FHWA allocated $675.0 million to NPS for road 
maintenance. 

Natural resource concerns are being addressed by project funding from 
the NPS Natural Resource Challenge. First funded in 2000, this is a 
program to substantially improve how the NPS manages the natural 
resources under its care. In 2001, the Challenge was funded at $29.5 
million. The funding for the program in 2005 was $77.6 million, an 
increase of more than 250 percent. By the end of 2007, the National 
Park Service will have in place inventory and monitoring programs for 
all 272 natural resource parks, equipping managers with critical 
information about the parks they manage. 

Including these additional sources of funding, operational funding for 
the 388 national park units increased by 20 percent in nominal dollars 
between 2001 and 2005. Among the various sources, funding was allocated 
to individual units within the parameters and priorities established by 
the Administration and subsequent Congressional direction. For the 
twelve parks mentioned in the report, the attached table details the 
allocation of funds available to the park units. 

Ignores Relationship Between Significant Funding Increases and Park 
Visitation: 

The report fails to examine the relationship of the significant 
increases in both operations and project funding to park visitation 
levels. Funding per visit to the national park system in 2001 
(including funding in the two NPS operating accounts and funding from 
recreation and concessions fees) was $5.60. By 2005, funding per visit 
had grown to $7.05 an increase of 26 percent. Even adjusting for 
increased costs of doing business, funding per visit increased 93 cents 
or 17 percent. 

The Focus on Anecdotal Evidence Is Misleading: 

The GAO report also makes use of several park anecdotes concerning 
reduced base funding. The anecdotes within the report highlights only 
certain divisions or programs in which a park has significantly reduced 
staffing in isolation from the park's overall staffing, park base 
budget, and non-base project funding. This limited approach also 
presents a skewed picture of the park's financial condition. For 
example, the GAO reports states on page 39 that at Grand Teton National 
Park, "a reduction in park funded seasonal custodians has meant less 
staff available to clean restrooms and pick-up litter." However, the 
GAO FTE data indicates that the overall number of seasonal employees, 
funded by base and non-base funding, at the park has increased by 20 
during the same period. 

By focusing on anecdotes concerning employment levels, the report fails 
to present an accurate picture of overall employment levels in the 
National Park Service. Over the period 2001 to 2005, employment levels 
at individual parks may have fluctuated. This is attributable to many 
factors, of which operational funding is one. Other factors include 
workload, management decisions on allocation of resources, and year-to- 
year availability of project funding. For the system as a whole, 
employment over the 2001 to 2005 period was remarkably stable. FTE 
usage in 2005 totaled 20,485, including both permanent and seasonal 
employees. FTEs in 2001 totaled 20,289. 

The draft report states that " Officials at several parks explained 
that since 2001, as positions have become vacant, they have refrained 
from filling them or have replaced them with lower graded or seasonal 
employees. " For the period FY 2001 through 2005, system-wide FTE 
remained stable, and the balance of seasonal and permanent employees 
also remained stable. Seasonal employment represented 25 percent of FTE 
usage in both 2001 and 2005. 

Management Improvements Are Yielding Tangible Results: 

The information included in the report relies on the use of budget and 
financial data. It does not examine performance information, the trends 
in accomplishments, or efforts to improve service delivery over the 
time period examined. One important area of emphasis for the department 
and the Park Service during this Administration, and the timeframe 
being examined, is the measurement of performance and related cost 
information, the analysis of base programs through the PART process, 
and efforts in management excellence. All of these efforts, including 
Park Service-specific tools such as the Core Operations Analysis, are 
yielding results in achieving more effective programs and more 
efficient operations. 

Park management decisions are made within a dynamic environment of 
shifting priorities and resources. Rather than provide individual 
comments on each park anecdote, it is important to note that NPS has 
worked consistently to accommodate the impact of pay increases and 
across-the-board reductions while maintaining high-levels of visitor 
satisfaction. The GAO report accurately identifies a number of 
innovative management approaches the Park Service has undertaken to 
identify management improvements and efficiencies that will result in 
improved visitor services and more cost-effective operations, including 
the Park Scorecard, the Core Operations Analysis, and the Business Plan 
Initiative. These tools are designed to assist managers within the 
individual park unit, and at the regional and headquarters levels to 
develop fully informed management decisions, which direct park 
resources toward functions that are essential to achieving mission 
goals and can also serve as a precursor to other management planning 
efforts. 

The National Park Service has worked consistently to accommodate the 
impacts of absorbed pay and across-the-board reductions, while 
successfully delivering a suite of high-level services to park 
visitors. NPS has adopted new ways of doing business, including 
centralizing some services and systems under the Department of the 
Interior. Of particular note are Department-wide purchases of IT 
hardware and software and other consumables, as well as NPS efforts to 
limit travel, provide more efficient training operations, and more 
effectively use its impressive network of volunteers, who provide an 
estimated five million hours of service nationwide, at an estimated 
value of over $130 million. 

However, the draft report does not discuss the results of these 
efforts. For example, work on the Core Operations Analysis has been 
completed in the Intermountain Region. As a result of the COA, Rocky 
Mountain National Park developed a five-year plan that will lead to 
more effective mix of personnel and discretionary support costs for 
park management. This will give the park greater operational 
flexibility and management capacity to meet emergency needs and provide 
for increased service levels for essential activities. 

Similarly, at Zion National Park, which was cited in the report, COA 
led to reduced overtime and premium pay for savings of $30,000. While 
this is a single example, the Park Service expects that tools such as 
the COA will continue to help park managers direct resources more 
effectively and efficiently. 

In addition to using management tools such as the Core Operations 
Analysis, the Park Service has undertaken changes in business 
practices, management of common services, and employed strategic 
changes in operations to improve operational support for parks and 
realize efficiencies that have resulted in savings in individual park 
units and can result in savings in the park system as a whole. These 
improvements are demonstrated by the efforts that Everglades National 
Park in improved vehicle management. With improved management of owned 
and leased vehicles the park demonstrated short and long-term savings 
and improved vehicle deployment for park needs. Other examples include 
the deployment of the Enterprise Services Network. This network that is 
being deployed throughout the Department's agencies will provide to 
parks a secure, more reliable, and faster connection to the internet 
and intranet. The Park Service has equipped its maintenance cadre with 
IT tools that have vastly improved their ability to track and report 
maintenance work including the use of hand-held technology. The Park 
Service has evaluated and continues to work toward more effective use 
of training resources, relocation funding, and partnership efforts. 

Index Used in Study Does Not Consider Outputs: 

The study uses the Gross Domestic Product (GDP) price Index for 
Government Consumption Expenditures and Gross Investment (federal non- 
defense sector), on the basis that the index is more heavily weighted 
to Federal workers compensation than the overall GDP index. There is 
not a perfect index available to accurately determine an index of NPS 
costs. This index includes not only NPS costs, but also those of the 
Coast Guard, National Aeronautics and Space Administration, and other 
civilian non-defense agencies. More importantly, because the products 
and services of the government are not sold in the marketplace, the 
Bureau of Economic Analysis calculates this index based upon the 
assumption that the cost of inputs equals the value of outputs. It 
therefore assumes that there have been no productivity improvements. 

The Department believes that it might be more appropriate to use the 
GDP (Chained) Price Index. While it may not be based upon Federal 
specific spending, it is an index based upon costs of goods and 
services in the market place, and therefore considers productivity and 
other management enhancements. While it too is not a perfect index, the 
fact that it is based on value of goods and services in the marketplace 
might make it a more preferable index. Use of this index would produce 
significantly different results. For example, under the GDP (Chained) 
Index, funding for daily operations of Park Units shows an increase 
from 2001 to 2005 in inflation adjusted dollars of $37.6 million from 
the 2001 level of $903.1 million (2005 inflated --$940.7 million). 
Using the Government Consumption Expenditures and Gross Investment 
Index, results in a 2001 to 2005 decrease of $10.1 million - a $47.8 
million difference from the GDP (Chained) Price Index. 

Specific Comments on the Report and Recommendation: 

NPS takes special exception to the anecdote on page 35, which claims 
that at Yosemite National Park, "four vacant dispatcher positions can 
not be replaced-threatening the park's ability to provide 911 services 
7 days per week and 24 hours per day." Yosemite National Park is in 
full 911 compliance and has coverage 7 days per week and 24 hours per 
day. Yosemite National Park is working with Lassen and Whiskeytown 
parks to provide joint services, which will create substantial savings 
and dramatically increase services. The statement about a loss of 911 
coverage was mentioned to GAO by park management as a hypothetical 
measure that could be taken in the future and was taken out of context 
by GAO. 

In addition to the need to discuss operational funding within a dynamic 
context, we have concerns specific to the one recommendation: 

"To reduce some of the pressure on operating funds, GAO recommends that 
the Secretary of the Interior direct the Park Service Director to 
follow through in revising Park Service policy to allow park units to 
use visitor fee revenues to pay the costs of permanent employees 
administering projects funded by visitor fees." 

As stated in the report, the National Park Service is currently 
considering a change in the use of fee revenue, but we remain concerned 
that the proposed change should not affect other funding sources. We 
believe that such a recommendation should clearly dictate that fee 
revenue be used to fund only a limited number of permanent employees 
and be specifically defined for the sole purpose of executing projects 
funded from fee revenue. 

Comments on specific statements in the GAO report are provided in the 
enclosure. Thank you for the opportunity to provide comments on this 
report. 

Sincerely, 

Signed by: 

Matthew J. Hogan: 
Acting Assistant Secretary for Fish and Wildlife and Parks: 

Enclosure: 

Park Funds from Multiple Sources: 

[See PDF for image] 

[End of table] 

The following are GAO's comments on the Department of the Interior's 
letter dated March 27, 2006: 

GAO Comments: 

1. We agree that the overall 2005 ONPS account was $1.7 billion--an 
increase of about 21 percent higher than in 2001. We reported this 
increase on an average annual basis of about 4.9 percent per year from 
2001 through 2005, which is equivalent to about 21 percent from 2001 to 
2005 in nominal terms. In addition, we added information on the 
department's comment that the Park Service has received significant 
operating increases since 1980, particularly compared to other domestic 
agencies. 

2. For the park units we visited, we provided data and analysis on the 
major funding trends for the park units, namely, allocations for daily 
operations, project related allocations, visitor fees, concessions fees 
and others. We added examples of specific project allocations to the 
park units we visited and how they were used as reported by the park 
units. 

3. On page 12 of the report, we provided information on the park 
service's overall budget authority. In addition, we agree that the 
allocations for daily operations increased by about 14 percent from 
2001 through 2005. However, we believe it is also important to look at 
the change in inflation-adjusted terms. We believe the information we 
provided in the report fairly describes the emphasis placed by the 
Congress and the Administration on Park Service operations over our 5- 
year study time frame. 

4. According to the Department of the Interior, the allocation for 
daily operations increased more in dollar terms than any other Park 
Service program between 2001 and 2005. However, on an average annual 
basis, the percentage increase over this period was less than for other 
programs. In addition, after adjusting for inflation, the allocation 
for daily operations fell slightly from about $903 million in 2001 to 
about $893 million in 2005--an average annual decline of about $2.5 
million, or 0.3 percent. 

5. We disagree with the assertion that our analysis presents a "false 
dichotomy between operations and project funding." This is addressed 
more fully on pages 46 and 47. 

6. On page 19 of the report, we include allocations for cyclic 
maintenance, repair and rehabilitation, and the inventory and 
monitoring programs from fiscal years 2001 through 2005. We believe 
this reflects the Park Service's continued emphasis on efforts to 
reduce its deferred maintenance backlog and the monitoring and 
protection of the natural resources in its charge. 

7. The report provides the allocation trends for existing programs such 
as the Inventory and Monitoring program, which is a large component of 
the Natural Resource Challenge. To provide additional information on 
this effort, we added information in the report on the total 
allocations from fiscal years 2001 through 2005--$62 million in nominal 
dollars. We also added examples of specific projects at park units we 
visited, some of which were funded through project allocations under 
the Natural Resource Challenge. 

8. See comment 1 above and the table attached to the department's 
comments. 

9. Although analyzing Park Service spending per visit is an indicator, 
we believe such analysis is of limited use because it does not indicate 
how the expenditures are used. 

10. See page 47 for our response. In addition, we used examples from 
park unit divisions that we visited in an effort to illustrate specific 
impacts on park operations. As the department pointed out, Grand Teton 
National Park's, overall FTE data indicates that seasonal employees 
increased from 54 to 73 from 2001 through 2005. However, this increase 
was mostly due to additional seasonal employees that were hired with 
other authorized funding sources--from 17 to 46. The seasonal FTEs paid 
for through daily operations allocations, in fact, decreased from 37 to 
28. Employees paid for through project-related allocations are hired to 
conduct work on specific projects, while those funded through daily 
operations allocations can be used more flexibly within a division to 
carry out operational activities such as cleaning restrooms and picking-
up litter. 

11. We agree that operational funding is one of several factors that 
contribute to employment levels at individual park units. Because 
management at the park unit level has discretion to manage within 
available resources, we asked park unit officials to report the level 
of FTEs funded per division, per funding source, and per employee type. 
In this way, we were better able to substantiate the anecdotes we chose 
to use in the report and to determine the parks' staffing composition. 
For example, at Grand Teton National Park, the number of permanent FTEs 
funded through daily operations allocations, from 2001 through 2005 
decreased by 2, while those funded through project allocations and 
other authorized funding sources increased by 16. 

12. See page 47 which discusses our response to this comment. 

13. We noted these additional non-park specific efforts on page 40 of 
the report. 

14. We agree that management decisions are made within a dynamic 
environment of shifting priorities and resources. The specific examples 
we provide highlight projects and activities that were accomplished, or 
were not accomplished given the resources available to individual park 
units. We agree that the Park Service has worked to accommodate the 
impact of pay increases and across-the-board reductions; however, we 
did not study the level of visitor satisfaction throughout this time 
frame. Many of the park unit officials we spoke with explained that in 
an effort to manage within available resources, certain activities that 
directly affect the visitor can no longer be provided for with daily 
operation allocations. The activities must then either be reduced, 
eliminated or paid for using other authorized funding sources. For 
instance, we found that some activities traditionally provided by a 
Park Service employee, were now being provided by volunteers. 

15. See page 48, which discusses our response to this comment. 

16. At the time we visited Zion National Park, it had not yet completed 
it's COA. Since they completed their analysis, we have not had the 
opportunity to validate the department's claim that Zion National Park 
achieved an overtime and premium pay for savings of $30,000 as a result 
of the COA. 

17. We added additional information on page 40 of the report to reflect 
these efforts. 

18. See pages 48 and 49, which discuss our response to this comment. 

19. See pages 48 and 49, which discuss our response to this comment. 

20. We added additional information in the report to address this 
comment. 

21. See pages 45 and 46, which discusses our response to this comment. 

[End of section] 

Appendix VI: GAO Contacts and Staff Acknowledgments: 

GAO Contact: 

Robin Nazzaro, (202) 512-3841, [Hyperlink, nazzaror@gao.gov]: 

Staff Acknowledgments: 

In addition to the individual named above, Roy Judy, Assistant 
Director, Thomas Armstrong, Jay Berman, Ulana Bihun, Denise Fantone, 
Doreen Feldman, Tim Guinane, Susan Irving, Richard Johnson, Hannah 
Laufe, Alison O'Neill, Claudine Pauselli, Jamie Roberts, Patrick Sigl, 
Paul Staley, and Walter Vance made key contributions to this report. 

[End of section] 

Related GAO Products: 

Appendixes: 

Maintenance: 

National Park Service: Efforts Underway to Address Its Maintenance 
Backlog. [Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-03-1177T]. 
Washington, D.C.: September 27, 2003. 

National Park Service: Status of Agency Efforts to Address Its 
Maintenance Backlog. [Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-
03-992T]. Washington, D.C.: July 8, 2003. 

National Park Service: Status of Efforts to Develop Better Deferred 
Maintenance Data. GAO-02-568R. Washington, D.C.: April 12, 2002. 

National Park Service: Efforts to Identify and Manage the Maintenance 
Backlog. [Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO/RCED-98- 
143]. Washington, D.C.: May 14, 1998. 

National Park Service: Maintenance Backlog Issues. [Hyperlink, 
http://www.gao.gov/cgi-bin/getrpt?GAO/T-RCED-98-61]. Washington, D.C.: 
February 4, 1998. 

Visitor Fees: 

Recreation Fees: Comments on the Federal Lands Recreation Enhancement 
Act, H.R. 3283. [Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO-04-
745T]. Washington, D.C.: May 6, 2004. 

Recreation Fees: Management Improvements Can Help the Demonstration 
Program Enhance Visitor Services. GAO-02-10. Washington, D.C.: November 
26, 2001. 

National Park Service: Recreational Fee Demonstration Program Spending 
Priorities. GAO/RCED-00-37R. Washington, D.C.: November 18, 1999. 

Recreation Fees: Demonstration Has Increased Revenues, but Impact on 
Park Service Backlog Is Uncertain. GAO/T-RCED-99-101. Washington, D.C.: 
March 3, 1999. 

Recreation Fees: Demonstration Program Successful in Raising Revenues 
but Could Be Improved. GAO/T-RCED-99-77. Washington, D.C.: February 4, 
1999. 

Recreation Fees: Demonstration Fee Program Successful in Raising 
Revenues but Could Be Improved. GAO/RCED-99-7. Washington, D.C.: 
November 20, 1998. 

Resource Management: 

Wildlife Management: Negotiations on a Long-Term Plan for Managing 
Yellowstone Bison Still Ongoing. GAO/RCED-00-7. Washington, D.C.: 
November 30, 1999. 

National Park Service: Efforts to Link Resources to Results Suggest 
Insights for Other Agencies. AIMD-98-113. Washington, D.C.: April 10, 
1998. 

Wildlife Management: Issues Concerning the Management of Bison and Elk 
Herds in Yellowstone National Park. GAO/T-RCED-97-200. Washington, 
D.C.: July 10, 1997. 

National Parks: Park Service Needs Better Information to Preserve and 
Protect Resources. GAO/T-RCED-97-76. Washington, D.C.: February 27, 
1997. 

National Park Service: Activities Within Park Borders Have Caused 
Damage to Resources. GAO/RCED-96-202. Washington, D.C.: August 23, 
1996. 

Donations: 

National Park Foundation: Better Communication of Roles and 
Responsibilities Is Needed to Strengthen Partnership with the National 
Park Service. GAO-04-541. Washington, D.C.: May 17, 2004. 

Park Service: Agency Needs to Better Manage the Increasing Role of 
Nonprofit Partners. GAO-03-585. Washington, D.C.: July 18, 2003. 

Concessions: 

Park Service: Need to Address Key Management Problems That Plague the 
Concessions Program. GAO/T-RCED-00-136. Washington, D.C.: June 15, 
2000. 

Park Service: Need to Address Management Problems That Plague the 
Concessions Program. GAO/T-RCED-00-188. Washington, D.C.: May 24, 2000. 

Park Service: Need to Address Management Problems That Plague the 
Concessions Program. GAO/RCED-00-70. Washington, D.C.: March 31, 2000. 

National Park Service: Concession Reform Issues. GAO/T-RCED-98-122. 
Washington, D.C.: March 12, 1998. 

Federal Lands: Concession Reform is Needed. GAO/T-RCED/GGD-96-223. 
Washington, D.C.: July 18, 1996. 

Housing: 

National Park Service: Concerns About the Implementation of Its 
Employee Housing Policy. GAO/T-RCED-99-119. Washington, D.C.: March 17, 
1999. 

National Park Service: Employee Housing Issues. GAO/T-RCED-98-35. 
Washington, D.C.: October 29, 1997. 

Other Management Issues: 

National Park Service: Opportunities Exist to Clarify and Strengthen 
Special Uses Permit Guidance on Setting Grazing Fees and Cost- 
Recovery. GAO-06-355R. Washington, D.C.: February 9, 2006. 

National Park Service: Revenues Could Increase by Charging Allowed Fees 
for Some Special Uses Permits. GAO-05-410. Washington, D.C.: May 6, 
2005. 

National Park Service: Managed Properties in the District of Columbia. 
GAO-05-378. Washington, D.C.: April 15, 2005. 

National Park Service: A More Systematic Process for Establishing 
National Heritage Areas and Actions to Improve Their Accountability Are 
Needed. GAO-04-593T. Washington, D.C.: March 30, 2004. 

National Park Service: Actions Needed to Improve Travel Cost 
Management. GAO-03-354. Washington, D.C.: February 13, 2003. 

National Park Service: Opportunities to Improve the Administration of 
the Alternative Transportation Program. GAO-03-166R. Washington, D.C.: 
November 15, 2002. 

Park Service: Visitor Center Project Costs, Size, and Functions Vary 
Widely. GAO-01-781. Washington, D.C.: July 24, 2001. 

Park Service: Agency Is Not Meeting Its Structural Fire Safety 
Responsibilities. GAO/T-RCED-00-253. Washington, D.C.: July 19, 2000. 

National Park Service: Flood Recovery Efforts at Yosemite National 
Park, California. GAO/RCED-99-50R. Washington, D.C.: January 27, 1999. 

National Park Service: Efforts to Link Resources to Results Suggest 
Insights for Other Agencies. AIMD-98-113. Washington, D.C.: April 10, 
1998. 

Park Service: Managing for Results Could Strengthen Accountability. 
GAO/RCED-97-125. Washington, D.C.: April 10, 1997. 

Land Management Agencies: Information on Selected Administrative 
Policies and Practices. GAO/RCED-97-40. Washington, D.C.: February 11, 
1997. 

National Parks: Difficult Choices Need to Be Made About the Future of 
the Parks. GAO/RCED-95-238. Washington, D.C.: August 30, 1995. 

National Park Service: Difficult Choices Need to Be Made on the Future 
of the Parks. [Hyperlink, http://www.gao.gov/cgi-bin/getrpt?GAO/RCED-95-
124]. Washington, D.C.: March 7, 1995. 

[End of section] 

(360537): 

FOOTNOTES 

[1] The Park Service has a separate appropriation account for 
construction, which includes major improvements and repairs; an 
appropriation account for the U.S. Park Police; and other appropriation 
accounts, such as National Recreation and Preservation, Historic 
Preservation Fund, and Land Acquisition and State Assistance. However, 
they are not the subject of this report. 

[2] We adjusted nominal dollars using the Gross Domestic Product (GDP) 
Price Index for Government Consumption Expenditures and Gross 
Investment (federal nondefense sector), with 2001 as the base year. 

[3] During the period of this review, the Park Service collected fees, 
referred to as offsetting collections, under the Recreational Fee 
Demonstration Program authorized by Pub. L. No. 104-134, as amended, 
which stipulated that uses for these funds include backlogged repair 
and maintenance projects, interpretation, signage, habitat or facility 
enhancement, resource preservation, annual operation (including fee 
collection), maintenance, and law enforcement relating to public use. 
Under this program at least 80 percent of the fees are to be retained 
by park units and 20 percent go to a central fund managed by the Park 
Service. Under current legislation, the Federal Lands Recreation 
Enhancement Act, Pub. L. No. 108-447, enacted December 8, 2004, park 
units are allowed to collect and use visitor fees in a generally 
similar fashion. 

[4] U.S. General Accounting Office, Park Service: Agency Needs to 
Better Manage the Increasing Role of Nonprofit Partners, GAO-03-585 
(Washington, D.C.: July 18, 2003). 

[5] For more specific data on appropriations for the ONPS account, 
funding for daily operations, projects, and other support programs, see 
appendix II. 

[6] Of the 390 park units, 8 were not in existence from fiscal years 
2001 through 2005 and therefore did not receive daily operations 
funding. In addition, two park units were in existence but did not 
receive funding for daily operations. 

[7] The 5.2 percent decline for Petroglyph National Monument was due to 
moving an information management position to the regional office. 
Minuteman Missile National Historic Site, which was authorized by the 
Congress on November 29, 1999, with its first year of base 
appropriations in 2001, showed a 42.6 percent average annual decline 
between fiscal year 2001 to 2005. However, the trend was an anomaly due 
to its start-up costs in fiscal year 2001--almost $5 million--compared 
to $335,000 in fiscal year 2002. 

[8] These 83 park units represent the top 21 percent of the most highly 
visited park units in the National Park System. The Park Service 
defines a recreation visit as the entry of a person onto lands or 
waters administered by the Park Service for recreational purposes 
excluding government personnel, through traffic (commuters), trades- 
persons, and persons residing within park unit boundaries. 

[9] Projects and other support programs include allocations from the 
ONPS account other than allocations for daily operations. It includes 
overall funding for numerous project-related sources such as Cyclic 
Maintenance, Repair and Rehabilitation and other support programs such 
as allocations for central offices (seven regional offices and the 
headquarters office), field resource centers, and other external 
administrative costs such as telecommunications and unemployment 
compensation payments. 

[10] From 2001 through 2005, the Park Service allocated a total of 
about $62 million to Natural Resource Challenge related-programs from 
its ONPS lump-sum appropriation, the majority of which was project- 
related funding. 

[11] Eleven park units received allocations for projects for each year 
between 2001 and 2005. Zion National Park received allocations for 
projects from 2002 through 2005, but did not receive allocations for 
projects in 2001. 

[12] Tables 13 and 14 in appendix III show personnel expenditures at 
the 12 park units we visited in both nominal and inflation-adjusted 
terms. Table 15 in appendix III shows personnel (FTEs) by funding 
source at the 12 park units we visited. 

[13] Although the average cost for a CSRS employee was greater at 11 of 
the 12 park units for 2005, at the other park--Mt. Rushmore National 
Memorial--the average cost of a FERS employee was greater. 

[14] Pages 97 through 100 of this report list our related reports and 
testimonies including those addressing the Park Service's approach to 
addressing its maintenance backlog. 

[15] In both 2001 and 2005, visitor fee spending goals for deferred 
maintenance were not met. In fiscal year 2001, the amount of visitor 
fees obligated for deferred maintenance was $61 million. In fiscal year 
2005, the amount was $73.1 million. 

[16] Table 20 in appendix IV shows visitation trends for the 12 park 
units we visited and for the Park Service as a whole. 

[17] While these reductions do not directly affect a visitor's 
experience, they also may hinder the park's ability to carry out 
operational duties. For example, officials at several park units 
explained that equipment, such as maintenance trucks, were old and in 
need of replacement. For several of the park units, certain divisions' 
personnel costs account for such a large percentage of their allocation 
for daily operations; therefore, reductions in other areas are not an 
option. At Grand Canyon National Park, for instance, the interpretive 
division had approximately $75,000 available in their allocation for 
daily operations in 2001 to pay for non-personnel costs such as travel 
and supplies. By 2005, approximately 99 percent of the division's 
allocation for daily operations was spent on personnel, relying on 
other authorized funding sources to make up the difference. 

[18] Tables 18 and 19 in appendix III show nominal and inflation-
adjusted funding for other authorized funding sources for the 12 park 
units we visited. 

[19] The Student Conservation Association provides high school and 
college students (among others) with conservation service internships 
and volunteer opportunities in the National Parks, National Forests, 
and other public lands. 

[20] In 1996, Yellowstone National Park made a decision to close the 
Norris Campground and a nearby museum to decrease costs. Following 
complaints from visitors, Congress asked Yellowstone to account for the 
savings, which proved a difficult task. 

[21] Park Service officials said that two out of the twelve park units 
we visited (Grand Canyon and Yosemite National Parks) completed a BPI 
through contracting external consultants on their own. 

[22] The Park Service currently has 390 park units. Some of these units 
are managed together and have combined budgets. We eliminated ten units 
from our analysis because these units did not receive funding for daily 
operations each year during our 5-fiscal-year time frame. 

[23] The Park Service defines a recreation visit as the entry of a 
person onto lands or waters administered by the Park Service for 
recreational purposes excluding government personnel, through traffic 
(commuters), trades-persons and persons residing within park unit 
boundaries. Twenty-two of the remaining 380 park units do not report 
recreation visitation statistics for the 5 fiscal years in our 
analysis. Consequently, we analyzed 358 park units for visitation and 
daily operations funding trends. 

[24] Results from a nonprobablility sample cannot be used to make 
inferences about a population, because in a nonprobability sample some 
elements of the population being studied have no chance--or an unknown 
chance--of being selected as part of the sample. 

[25] We provided the park units with standard data requests and 
standard instructions on how to compile the data. We followed up with 
the park units to determine what assumptions were made during data 
collection and worked with park officials to try to ensure that the 
parks units made the same assumptions. 

GAO's Mission: 

The Government Accountability Office, the investigative arm of 
Congress, exists to support Congress in meeting its constitutional 
responsibilities and to help improve the performance and accountability 
of the federal government for the American people. GAO examines the use 
of public funds; evaluates federal programs and policies; and provides 
analyses, recommendations, and other assistance to help Congress make 
informed oversight, policy, and funding decisions. GAO's commitment to 
good government is reflected in its core values of accountability, 
integrity, and reliability. 

Obtaining Copies of GAO Reports and Testimony: 

The fastest and easiest way to obtain copies of GAO documents at no 
cost is through the Internet. GAO's Web site ( www.gao.gov ) contains 
abstracts and full-text files of current reports and testimony and an 
expanding archive of older products. The Web site features a search 
engine to help you locate documents using key words and phrases. You 
can print these documents in their entirety, including charts and other 
graphics. 

Each day, GAO issues a list of newly released reports, testimony, and 
correspondence. GAO posts this list, known as "Today's Reports," on its 
Web site daily. The list contains links to the full-text document 
files. To have GAO e-mail this list to you every afternoon, go to 
www.gao.gov and select "Subscribe to e-mail alerts" under the "Order 
GAO Products" heading. 

Order by Mail or Phone: 

The first copy of each printed report is free. Additional copies are $2 
each. A check or money order should be made out to the Superintendent 
of Documents. GAO also accepts VISA and Mastercard. Orders for 100 or 
more copies mailed to a single address are discounted 25 percent. 
Orders should be sent to: 

U.S. Government Accountability Office 

441 G Street NW, Room LM 

Washington, D.C. 20548: 

To order by Phone: 

Voice: (202) 512-6000: 

TDD: (202) 512-2537: 

Fax: (202) 512-6061: 

To Report Fraud, Waste, and Abuse in Federal Programs: 

Contact: 

Web site: www.gao.gov/fraudnet/fraudnet.htm 

E-mail: fraudnet@gao.gov 

Automated answering system: (800) 424-5454 or (202) 512-7470: 

Public Affairs: 

Jeff Nelligan, managing director, 

NelliganJ@gao.gov 

(202) 512-4800 

U.S. Government Accountability Office, 

441 G Street NW, Room 7149 

Washington, D.C. 20548: