Jump to main content.


Current Public Comment Periods

Jump to Report Index

Corrective Measures Study (CMS), March 2008
The public input period has closed.

The U.S. Environmental Protection Agency is announcing a 30-day extension to the Informal Public Input Period on GE's Corrective Measures Study (CMS) for the Housatonic River Site, Rest of River. EPA will now accept public comments through May 20, 2008. The public input period opened on March 22, 2008

The CMS is available on EPA's website. The report is located in the Rest of River section under GE Reports/Documents. The direct link is: http://www.epa.gov/region1/ge/thesite/restofriver/reports/cms/283374_CMS_Report.pdf (722 pp., 3.61 MB) (Approximate file size of all linked files: 295 MB. Section 6 Figures: 195 MB)

The CMS includes GE's recommendations on which alternatives the company believes best meet the objectives and criteria specified for the Rest of River project. EPA has started a review of GE's CMS and will be accepting comments from the CCC and the general public as well as from the Massachusetts Department of Environmental Protection, the Connecticut Department of Environmental Protection, and other interested organizations and individuals.

Comments may be submitted to:

Susan Svirsky (svirsky.susan@epa.gov), EPA Rest of River Project Manager
c/o Weston Solutions
10 Lyman Street
Pittsfield, MA 01201

 

Serving Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont, & Tribal Nations


Local Navigation


Jump to main content.