Sauget Area 2 Site
Site Information
- Sauget, IL (St. Clair County)
- EPA ID# ILD000605790
- NPL Site Narrative
- NPL Factsheet
- CERCLIS listing
- Alias(es): Eagle Marine, East St. Louis Sauget, Monsanto Sauget Illinois Landfill, Paul Sauget, Peavey Marine, Sauget & County Landfill, Sauget Landfill, Sauget Monsanto Landfill, Site Q
- Map of Sauget Area 1 and Area 2 (PDF) (1pg, 1.3MB)
Contact Information
Community Involvement Coordinator
Patricia Krause (krause.patricia@epa.gov)
312-886-9506 or 800-621-8431, ext. 69506, 9 a.m. – 4:30 p.m. CST
Remedial Project Manager
Leah Evison (evison.leah@epa.gov)
312-886-2064 or 800-621-8431, ext. 62064
Repositories
(where to view written records)
Cahokia Public Library
140 Cahokia Park Drive
Cahokia, IL
Links
EPA Superfund Home Page
Region 5 Superfund
Superfund glossary
Superfund Frequent Questions:
Superfund Information Systems Frequent Questions
Background
Sauget Area 2 site is made up of four landfills, sites Q, R, S, and P and four backfilled lagoons, site 0. The site is the location of hazardous waste that resulted from treatment and disposal of industrial, municipal, and chemical wastes.
Sauget Area 2 entered into an agreement to perform studies about the nature and extent of contamination at the site and determine cleanup alternatives (remedial investigation/feasibility study). The cleanup plan selected included constructing a barrier wall to capture contaminated ground water and prevent it from reaching the Mississippi River and pumping and treating ground water off site.
Site Updates | News Releases | Fact Sheets | Five-Year Reviews || Technical Documents || Legal Agreements
You will need the free Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
Site Updates
August 2008
EPA performed a five-year review to evaluate the cleanup plan for Sauget Area 2 Site R. The cleanup plan is for the ground water operable unit 2. An operable unit is a term for the number of separate activities taking place at a Superfund site. The existing interim cleanup of a barrier wall to capture contaminated ground water from reaching the Mississippi River and pumping and treating ground water off-site is working and significant amounts of contaminated ground water are being removed and treated.
News Releases
- EPA, DOJ reach $2.6 million settlement with Sauget, Ill., Superfund responsible parties March 7, 2007
Fact Sheets
- US EPA Issues Proposed Plan for Interim Groundwater Cleanup (PDF) (8pp, 675K) June 2002
- Map of Sauget Area 1 and Area 2 (PDF) (1pg, 1.3MB)
Five-Year Reviews
- First Five Year Review (PDF) (117pp,9.6MB) June 26, 2008
Technical Documents
- Record of Decision for Ground Water Operating Unit 2 (PDF) (236pp, 10.5MB) September 2002
Legal Agreements
- Administrative Order for Remedial Design and Interim Remedial Action (PDF) (294pp, 14.5MB) September 30, 2002
- Administrative Order by Consent (PDF) (59pp, 3.0MB) November 24, 2000