Boeing Plant 2
Skip common site navigation and headers
United States Environmental Protection Agency
Region 10 Cleanup: Boeing Plant 2
Serving the people of Alaska, Idaho, Oregon, Washington and 270 Native Tribes

Recent Additions | Contact Us | Print Version Search:
Begin Hierarchical Links EPA Home > Region 10 > Cleanup Sites > Lower Duwamish Waterway > Boeing Plant 2 End Hierarchical Links
First Time Visitors

Index A - Z


Air Quality

Cleanup

Waste & Chemicals

Water Quality


Business & Industry

Concerned Citizens

Compliance & Enforcement

Information Resources

Innovative Solutions


Freedom of Information Act (FOIA)

 


Boeing Plant 2

Boeing Plant 2 is located on East Marginal Way South in Seattle, and the property extends into Tukwila, Washington. The 107-acre site is bordered by the Duwamish Waterway to the west. Since 1936 Boeing has manufactured airplane parts at Plant 2, using a wide range of hazardous chemicals, including heavy metals (chrome, zinc, copper, cadmium, silver), cyanide, mineral acids and bases, petroleum products, polychlorinated biphenyls (PCBs), and chlorinated solvents, such as trichloroethylene. Much of the facility is now used for storing parts and equipment. There are, however, some limited manufacturing operations, including machining of airplane parts, parts cleaning, toolmaking, painting and paint stripping.

The facility has contaminated soil and groundwater, and sediment in the Duwamish Waterway. The site poses potential risk to the health of people, fish, wildlife, and the environment. The Boeing Company (Boeing) is currently investigating and cleaning up hazardous waste at Boeing Plant 2 under a Resource Conservation and Recovery Act (RCRA) Order. Some ongoing cleanups at the site are being conducted as “interim measures” to deal with high risk areas that can be cleaned up, or at least better controlled, before the study is completed. Final cleanups of large industrial sites often take many more years to complete. In 2006, Boeing continued ongoing groundwater treatment and completed a PCB-contaminated soil removal action. In 2007, Boeing closed off two of its main storm drains to prevent contaminated discharges to the Duwamish Waterway. Boeing continues to monitor the groundwater, shoreline and sediment at the site.

Fact Sheets and News


Regional Information
Fact Sheets and News
Technical Documents

Contact Information:
Suzanne Skadowski, EPA Community Involvement Coordinator
Telephone: (206) 553-6689

E-Mail: Skadowski.Suzanne@epa.gov

Christy Brown, Corrective Action Site Manager [Sediments]
Telephone: (206) 553-8506
Email: brown.christy@epa.gov

Laura Castrilli [Uplands]
Telephone: (206) 553-4323
Email: castrilli.laura@epa.gov

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more.
Technical Documents




[ Main Cleanup | Brownfields ]
[ Superfund | FOIA | Records Center ]



Point of contact: Suzanne Skadowski
E-Mail: Skadowski.Suzanne@epa.gov
Phone Number: (206) 553-6689
Last Updated: 10/21/2008