Policy Review (Objective 1): First Memorandum of Understanding
(MOU) signed August 6th, 1996. A second round MOU was signed on 9 November, 1999 extending high-speed Internet access to two secondary cities.
|
|
Technical Review (Objective 2): Equipment installed.
Inauguration Day, May 16th, 1997, ribbon-cutting ceremony. US Ambassador Huddleston's remarks and Ministre des Postes et
Telecommunications Ny Hasina Andriamanjato' s remarks (version en
Francais) (version in English) at the Ground Station
Inauguration. National Internet gateway is operational and commercial ISPs have been
connected. (Photo of the ISPs at the ground station
inauguration). Leland has installed two high speed POPs in two 'secondary' cities of Tamatave and Antsirabe in November, 1999. |
|
Internet Applications Review (Objective 3): Survey
Completed. The Applications and Internet Training Strategy team trained 129 people in
June/July, 1998 during their GLOBE,
"train-the-trainer," and USAID Mission partner training workshop. Follow-up Internet trainings and another train-the-trainer was sponsored in August, 1999. |
|
Leland Madagascar Training
Photos from the Leland Photo Gallery |