Rule Section: §192.927(c)(5)

Other requirements.

Rule Hierarchy:

Rule Language:

The ICDA plan must also include -

  1. criteria an operator will apply in making key decisions (e.g., ICDA feasibility, definition of ICDA Regions, conditions requiring excavation) in implementing each stage of the ICDA process;
  2. provisions for applying more restrictive criteria when conducting ICDA for the first time on a covered segment and that become less stringent as the operator gains experience; and
  3. provisions that analysis be carried out on the entire pipeline in which covered segments are present, except that application of the remediation criteria of ยง192.933 may be limited to covered segments.