For plastic transmission pipelines, verify that applicable third party damage requirements have been applied to covered segments of the pipeline. [§192.935(e)]
Verify that the operator’s processes for damage prevention program enhancements include requirements for the use of qualified personnel (see Protocol L.02 - §192.915(c)) for work an operator is conducting that could adversely affect the integrity of a covered segment, such as marking, locating, and direct supervision of known excavation work. [§192.935(e)] [Note: This requirement is also contained in previous Protocol H.02.a.i for non-plastic pipelines operating above 30% SMYS.]
Verify that the operator's processes for damage prevention program enhancements include participating in one-call systems in locations where covered segments are present. [§192.935(e)] [Note: This requirement is also contained in Protocol H.02.a.iii for non-plastic pipelines operating above 30% SMYS.]
Inspections |
Home Page |
Reference |
FAQ |
Key Documents |
Protocols |
Topical Index |
Glossary |
Rule Outline |
In Context |
Protocol Areas |
Protocol H as Offline Form |
Protocol H as Offline Document |
Protocol H Outline |
Print-Friendly |
My Pages |
Questions and Comments |
Log In... |