1- (99) |
Traffic Management Optimization Pilot Studies for Reconstructing Urban Freeways |
4 - R&R |
IPRF |
University of California |
1- (99) |
Traffic Management Optimization Pilot Studies for Reconstructing Urban Freeways |
4 - R&R |
IPRF |
Texas Transportation Institute |
1- (99) |
Traffic Management Optimization Pilot Studies for Reconstructing Urban Freeways |
4 - R&R |
FHWA |
Texas Transportation Institute |
2 - (99) |
Impact of Texturing and Surface Treatment on Reducing Wet-Weather Accidents |
5 - User satisfaction |
Not Contracted |
NA |
3 - (99) |
Performance and Design of Whitetopping Overlays for Heavily-Trafficked Pavements |
1 - Design, 4 - R&R |
IPRF |
Transtec, Inc. |
3 - (99) |
Performance and Design of Whitetopping Overlays for Heavily-Trafficked Pavements |
1 - Design, 5 - User satisfaction |
FHWA |
Transtec, Inc. |
4 - (99) |
Tests or Standards to Identify Compatible Combinations of Individually Acceptable Concrete Materials |
2 - Materials |
IPRF |
Construction Technology Laboratories, Inc. |
4 - (99) |
Tests or Standards to Identify Compatible Combinations of Individually Acceptable Concrete Materials |
2 - Materials |
FHWA |
Construction Technology Laboratories, Inc. |
5 - (99) |
Accelerated Loading Tests of Ultra-Thin Whitetopping (UTW) |
1 - Design, 4 - R&R |
IPRF |
Transtec, Inc. |
6 - (99) |
Incremental Costs and Performance Benefits of Various Features of Concrete Pavements |
1 - Design |
IPRF |
Applied Pavement Technology, Inc. |
6 - (99) |
Incremental Costs and Performance Benefits of Various Features of Concrete Pavements |
1 - Design |
FHWA |
Applied Pavement Technology, Inc. |
7-B - (99) |
Field Trials - UTW Repair Techniques |
4 - R&R |
IPRF |
Construction Technology Laboratories, Inc.
|
7-C - (99) |
Field Trials - Weekend Intersection Reconstruction
|
4 - R&R |
IPRF |
University of Washington |
7-D - (99) |
Field Trials - Instrumentation of UTW in Colorado |
4 - R&R |
IPRF |
Construction Technology Laboratories, Inc. |
7-E - (99) |
Field Trials - Precast Concrete Slabs for Full Depth Repairs |
4 - R&R |
FHWA |
Michigan State University - Buch |
7-F - (99) |
Field Trials - Implementation of TEMP System |
3 - Construction |
FHWA |
Transtec, Inc. |
7-G - (99) |
Field Trials - Magnetic Tomography for Dowel Bar Location |
3 - Construction |
FHWA |
ERES Consultants/ARA |
7-H - (99) |
Field Trials - Field Evaluation of Elliptical Steel Dowel Performance |
1 - Design |
FHWA |
Iowa State University |
7-I - (99) |
Field Trials - Evaluation of PRS in Tennessee |
3 - Construction |
FHWA |
ERES Consultants/ARA |
8 - (99) |
Performance and Design of Separated (Unbonded) Concrete Overlays |
4 - R&R |
Not Contracted |
NA |
9 - (00) |
Influence of Sealing Transverse Contraction Joints on the Performance of Concrete Pavement |
1 - Design |
FHWA |
ProTech |
10 - (00) |
Revision of I-Slab 2000 for Subbase/Pavement Interaction |
1 - Design |
IPRF |
ERES Consultants/ARA |
11- (00) |
Workshops on Concrete Pavement Technology for State DOT Pavement Engineers |
6 - Training |
IPRF |
American Concrete Pavement Association |
12-A (01) |
Develop a Plan to Investigate the Impacts of Pavement Cracking on Long-Term Performance |
1 - Design |
IPRF |
Construction Technology Laboratories, Inc. |
12-B (01) |
Develop a Plan to Investigate the Impacts of Pavement Cracking on Long-Term Performance |
1 - Design |
IPRF |
ERES Consultants/ARA |
13 - (00) |
Determine Actual Life Cycle Costs |
1 - Design |
IPRF |
ERES Consultants/ARA |
14 - (00) |
AURORA 2000 Pavement System Analysis Tools |
1 - Design |
IPRF |
Transtec, Inc. |
14 - (00) |
AURORA 2000 Pavement System Analysis Tools |
1 - Design |
FHWA |
Quality Engineering Services, Inc. |
15 - (01) |
Long-Term Plan for Concrete Pavement Research and Technology |
(Future R&D) |
IPRF |
Iowa State University |
15 - (01) |
Long-Term Plan for Concrete Pavement Research and Technology |
(Future R&D) |
FHWA |
Iowa State University |
16 - (01) |
Smoothness Criteria for Concrete Pavements
|
5 - User satisfaction |
FHWA |
Soil and Materials Engineers, Inc. |
17 - (01) |
Subbase Design |
1 - Design |
Not Contracted |
NA |
18 - (01) |
Roller Compacted Concrete for Asphalt Overlays
|
1 - Design |
Not Contracted |
NA |
19 - (01) |
Communication Services for the Concrete Pavement Technology Program |
6 - Training |
Not Contracted |
NA |
51 - (99) |
Mobile Concrete Laboratory |
3 - Construction |
FHWA |
Salut, Inc. |
52 - (98) |
Quality Concrete Rehabilitation and Preservation (SP-205) |
4 - R&R |
FHWA |
Various State Highway Agencies |
53 - (98) |
High Performance Concrete Pavements (TE-30)
|
1 - Design 5 - User satisfaction |
FHWA |
Various State Highway Agencies |
54 - (98) |
Repair and Rehabilitation of Concrete Pavements |
4 - R&R |
FHWA |
Texas Transportation Institute |
55 - (99) |
Accelerated Load Testing of Ultra-Thin Whitetopping |
4 - R&R |
FHWA |
FHWA R&D |
56 - (99) |
PCCP Laboratory Studies |
|
FHWA |
FHWA R&D |
56-A -- Development of Standard Test for Concrete Coefficient of Thermal Expansion |
1 - Design 2 - Materials |
FHWA |
FHWA R&D |
56-B -- Concrete Mixture Optimization Using Statistical Mixture Methods |
2 - Materials |
FHWA |
FHWA R&D |
56-C -- Freeze-Thaw Durability of Concrete With Marginal Entrained Air Content |
2 - Materials |
FHWA |
FHWA R&D |
56-D -- Development of Alkali-Silica Reactivity Mix-Specific Test Method |
2 - Materials |
FHWA |
FHWA R&D |
56-E -- Variation of Shrinkage Potential of Portland Cement Concrete |
2 - Materials |
FHWA |
FHWA R&D |
56-F -- Evaluation of the Workability Test and the Workability of Concrete Paving Mixtures |
2 - Materials |
FHWA |
FHWA R&D |
57 - (99) |
Computer-Based Guidelines for Concrete Pavements (HIPERPAV II) |
3 - Construction |
FHWA |
Transtec, Inc. |
58-A - (98) |
The Use of Precast Concrete Panels to Expedite Highway Pavement Construction - Phase 1: Feasibility Study |
4 - R&R |
FHWA |
University of Texas |
58-B - ( 98) |
The Use of Precast Concrete Panels to Expedite Highway Pavement Construction - Phase 2: Pilot Studies |
4 - R&R |
FHWA |
University of Texas |
58-C - (98) |
The Use of Precast Concrete Panels to Expedite Highway Pavement Construction - Phase 3: Demonstration Projects |
4 - R&R |
FHWA |
Transtec, Inc. |
59 - (00) |
Nondestructive and Innovative Testing Workshop
|
6 - Training |
FHWA |
Transtec, Inc./SAIC |
60 - (99) |
Curing of Portland cement Concrete Pavements |
3 - Construction |
FHWA |
U.S. Army Corps of Engineers (WES) |
61 - (99) |
Evaluation of Initial PCC Performance-Related Specification Systems |
5 - User satisfaction |
FHWA |
Indiana DOT & Florida DOT |
62 - (01) |
Achieving High Level of Smoothness Without Sacrificing Pavement Performance
|
3 - Construction |
FHWA |
Soil and Materials Engineers, Inc. |
63 - (02) |
Inertial Profile Data for PCC Pavement Performance Evaluation |
1 - Design |
FHWA |
Transtec, Inc. |
64 - (02) |
Computer-Based Guidelines for Job-Specific Optimization of Paving Concrete |
2 - Materials |
FHWA |
Transtec, Inc. |
65 - (03) |
Technology Transfer, Deployment and Delivery for the Concrete Pavement Technology Program (CPTP)
|
6 - Training |
FHWA |
Construction Technology Laboratories, Inc. |