U.S. Department of Transportation, Federal Highway Administration FHWA Home Feedback
Planning

FY 2001 GRANT RECIPIENTS

The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program grant recipients are the following: 

*-- indicates congressional earmarks

STATE PROJECT AWARD
Alabama *US 43, Alabama   $3,516,000
Alabama *Anniston Evacuation corridor, Calhoun County, Alabama   $2,637,000
Alaska *Hatcher Pass (phase 1), Alaska   $1,758,000
Arizona Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE.   $750,000
Arizona   ITS-CVO processing for international crossing system in Nogales POE.  $800,000
Arkansas ( w/ IN, KY, LA, MS, TN, TX)      Environmental and Location studies for future I-69 from Sarnia and  Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border)

$5,000,000

California Project development, ROW acquisition  and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona  along UP/SP RR line $2,400,000
California Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area  $2,000,000
California Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry  $4,100,000
California *Avalon Boulevard/405 Freeway Interchange, Carson, California   $769,125
Colorado *I-25 Corridor from Alameda to Logan, Colorado   $3,516,000
Connecticut Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven  $1,500,000
Florida *Traffic calming, Boca Raton, Florida   $439,500
Florida *US 19, Florida   $8,790,000
GSA At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach  $1,990,000
GSA At Columbia, Laredo TX POE construction of a 3rd lane for truck processing.  Lane will separate full and empty trucks prior to inspection $308,000
GSA At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths.   $1,500,000
GSA At Pharr, TX POE construction of 25 inspection bays with canopy.   $1,500,000
Idaho *US 95 (Milepost 522 to Canadian border), Idaho   $1,670,100
Illinois *New Boston Road improvements, Mercer County, Illinois   $2,637,000
Illinois *I-74 bridge, Moline, Illinois   $4,922,400
Illinois *US 51 widening, Decatur, Illinois   $1,186,650
Illinois *Stevenson expressway, Illinois   $3,340,200
Illinois PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county $3,000,000
Indiana *South Shore industrial safety overpass, Indiana   $4,175,250
Indiana *I-65 Upgrade, Clark County, Indiana   $1,186,650
Kentucky *Madison County, KY 21 and I-75, Kentucky   $879,000
Kentucky *I-66, Somerset to London, Kentucky   $4,395,000
Kentucky *US 25 improvements, Kentucky   $1,758,000
Louisiana *I-69, Louisiana   $2,021,700
Massachusetts *Downtown Fitchburg Route 12 extension, Massachusetts   $1,758,000
Michigan Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance $3,000,000
Missouri *US 61 (Avenue of the Saints), Missouri   $3,516,000
New Hampshire (w/ ME & VT) *US Route 2, New Hampshire   $1,318,500
New York   Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles.  $3,000,000
New York   Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing  $300,000
North Carolina * US 321 and US 74, Gasden and Mecklenburg County, North Carolina   $439,500
Ohio *City of North Ridgeville, Lorain County, Ohio, grade crossing $527,400
Oregon *I-5 South Medford interchange and Delta Park, Oregon   $879,000
South Dakota   *I-29 Port of Entry, Union County, South Dakota   $1,758,000
South Dakota   Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90 $3,000,000
Texas Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco) $1,400,000
Texas *Radio Road overpass, City of Sulpher Springs, Texas $1,186,650
Texas *I-69 corridor, Texas   $2,637,000
Texas Reconstruction of Mile 2 W in Hidalgo County   $1,200,000
Texas Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico) 

$450,000

Texas  * I-35 corridor expansion, Waco, Texas   $1,164,675
Utah Corridor planning for I-15 in Utah County   $400,000
Virginia *Coalfields expressway, VA   $3,516,000
Virginia *Route 104, Virginia   $879,000
Washington State  * US 395 North Spokane corridor, Washington   $879,000
West Virginia * Coalfields expressway, West Virginia   $8,790,000
Wisconsin *WI 29 (Chippewa Falls bypass, Wisconsin)   $2,637,000
Wisconsin ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements $4,000,000

TOTAL AWARDS  

$123,081,300

To provide Feedback, Suggestions or Comments for this page contact Stefan Natzke at stefan.natzke@dot.gov or 202-366-5010.


FHWA Home | HEP Home | Feedback
FHWA