FY 2001 GRANT RECIPIENTS
The Fiscal Year 2001 National Corridor Planning and Development Program and Coordinated Border Infrastructure Program grant recipients are the following: *-- indicates congressional earmarks
STATE
|
PROJECT
|
AWARD
|
Alabama |
*US 43, Alabama |
$3,516,000 |
Alabama |
*Anniston Evacuation corridor, Calhoun County, Alabama |
$2,637,000 |
Alaska |
*Hatcher Pass (phase 1), Alaska |
$1,758,000 |
Arizona |
Infrastructure improvements to property purchased for Commercial Vehicle Inspections at the Nogales POE. |
$750,000 |
Arizona |
ITS-CVO processing for international crossing system in Nogales POE. |
$800,000 |
Arkansas ( w/ IN, KY, LA, MS, TN, TX) |
Environmental and Location studies for future I-69 from Sarnia and Windsor, Ontario Canada to Laredo and the Lower Rio Grande Valley (US/Mexico Border) |
$5,000,000
|
California |
Project development, ROW acquisition and construction of grade separation projects in the Alameda Corridor East from E. Los Angeles to Pomona along UP/SP RR line |
$2,400,000 |
California |
Preliminary Engineering and design for realignment of I-5 and I-805 from San Ysidro POE to Virginia Ave in San Diego metropolitan area |
$2,000,000 |
California |
Environmental study, design, and ROW acquisition along SR 905 Freeway to the Otay Mesa Port of Entry |
$4,100,000 |
California |
*Avalon Boulevard/405 Freeway Interchange, Carson, California |
$769,125 |
Colorado |
*I-25 Corridor from Alameda to Logan, Colorado |
$3,516,000 |
Connecticut |
Final design phase for replacement of the I-95 Pearl Harbor Memorial Bridge in New Haven |
$1,500,000 |
Florida |
*Traffic calming, Boca Raton, Florida |
$439,500 |
Florida |
*US 19, Florida |
$8,790,000 |
GSA |
At Sault St. Marie, MI POE, construction of a corridor for the separation of commercial and non-commercial traffic at the approach |
$1,990,000 |
GSA |
At Columbia, Laredo TX POE construction of a 3rd lane for truck processing. Lane will separate full and empty trucks prior to inspection |
$308,000 |
GSA |
At bridge of the Americas, EL Paso, TX POE, construct new headhouse and 4 additional primary inspection lanes and booths. |
$1,500,000 |
GSA |
At Pharr, TX POE construction of 25 inspection bays with canopy. |
$1,500,000 |
Idaho |
*US 95 (Milepost 522 to Canadian border), Idaho |
$1,670,100 |
Illinois |
*New Boston Road improvements, Mercer County, Illinois |
$2,637,000 |
Illinois |
*I-74 bridge, Moline, Illinois |
$4,922,400 |
Illinois |
*US 51 widening, Decatur, Illinois |
$1,186,650 |
Illinois |
*Stevenson expressway, Illinois |
$3,340,200 |
Illinois |
PE for Central Ave. to Narragansett Ave. connector, a new 4-lane highway near Midway Airport and the CSX Bedford Park intermodal yards in Cook county |
$3,000,000 |
Indiana |
*South Shore industrial safety overpass, Indiana |
$4,175,250 |
Indiana |
*I-65 Upgrade, Clark County, Indiana |
$1,186,650 |
Kentucky |
*Madison County, KY 21 and I-75, Kentucky |
$879,000 |
Kentucky |
*I-66, Somerset to London, Kentucky |
$4,395,000 |
Kentucky |
*US 25 improvements, Kentucky |
$1,758,000 |
Louisiana |
*I-69, Louisiana |
$2,021,700 |
Massachusetts |
*Downtown Fitchburg Route 12 extension, Massachusetts |
$1,758,000 |
Michigan |
Detroit - Windsor International Bridge Study: Feasibility Study & Environmental Clearance |
$3,000,000 |
Missouri |
*US 61 (Avenue of the Saints), Missouri |
$3,516,000 |
New Hampshire (w/ ME & VT) |
*US Route 2, New Hampshire |
$1,318,500 |
New York |
Design and ROW acquisition for new freeway (future I-99) from PA border north for 12 miles. |
$3,000,000 |
New York |
Installation of canopy, inspection booths, signal and WIM at Ogdensburg-Prescott Intl Crossing |
$300,000 |
North Carolina |
* US 321 and US 74, Gasden and Mecklenburg County, North Carolina |
$439,500 |
Ohio |
*City of North Ridgeville, Lorain County, Ohio, grade crossing |
$527,400 |
Oregon |
*I-5 South Medford interchange and Delta Park, Oregon |
$879,000 |
South Dakota |
*I-29 Port of Entry, Union County, South Dakota |
$1,758,000 |
South Dakota |
Construction of Phase I of the Southeast Connector route in Rapid City, SD including a new interchange at Elk Vale Rd and SD-44 and four-lane reconstruction of Elk Vale Rd from South of SD-44 north to near I-90 |
$3,000,000 |
Texas |
Acquire ROW for Border safety inspection facilities and related work (Laredo, Eagle Pass, El Paso, Brownsville, Pharr-Reynosa, Los Indios-Lucia Blanco) |
$1,400,000 |
Texas |
*Radio Road overpass, City of Sulpher Springs, Texas |
$1,186,650 |
Texas |
*I-69 corridor, Texas |
$2,637,000 |
Texas |
Reconstruction of Mile 2 W in Hidalgo County |
$1,200,000 |
Texas |
Improvement Plan and related work for six POEs in El Paso area (including part of New Mexico) |
$450,000
|
Texas |
* I-35 corridor expansion, Waco, Texas |
$1,164,675 |
Utah |
Corridor planning for I-15 in Utah County |
$400,000 |
Virginia |
*Coalfields expressway, VA |
$3,516,000 |
Virginia |
*Route 104, Virginia |
$879,000 |
Washington State |
* US 395 North Spokane corridor, Washington |
$879,000 |
West Virginia |
* Coalfields expressway, West Virginia |
$8,790,000 |
Wisconsin |
*WI 29 (Chippewa Falls bypass, Wisconsin) |
$2,637,000 |
Wisconsin |
ROW acquisition, construction of roadway and structures, widening and realignment of US 10 between Fremont and US 45 including US 10/45 improvements |
$4,000,000 |
|
TOTAL AWARDS
|
$123,081,300 |
To provide Feedback, Suggestions or Comments for this page contact Stefan Natzke at stefan.natzke@dot.gov or 202-366-5010.
|