This report is a sub-report of the PHMSA Significant Pipeline Incidents report. As such, it represents Significant Incidents only over the time period and pipeline system specified.
The data source for this table is the PHMSA Filtered Incident Files.
More Pipeline Incidents and Mileage Reports are available.
National All Pipeline Systems: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
187 |
3.1% |
3 |
24 |
$213,197,247 |
5.8% |
CORROSION, INTERNAL |
179 |
3.0% |
0 |
1 |
$75,215,023 |
2.0% |
VARIOUS |
708 |
11.8% |
27 |
75 |
$262,693,045 |
7.1% |
Sub Total |
1,074 | 18.0% | 30 | 100 | $551,105,316 | 15.0% |
OPERATOR EXCAVATION DAMAGE |
49 |
0.8% |
1 |
9 |
$11,835,536 |
0.3% |
THIRD PARTY EXCAVATION DAMAGE |
241 |
4.0% |
18 |
40 |
$80,427,675 |
2.1% |
VARIOUS |
1,262 |
21.1% |
128 |
570 |
$425,474,054 |
11.6% |
Sub Total |
1,552 | 26.0% | 147 | 619 | $517,737,266 | 14.1% |
INCORRECT OPERATION |
82 |
1.3% |
8 |
27 |
$13,814,491 |
0.3% |
VARIOUS |
231 |
3.8% |
4 |
120 |
$30,411,428 |
0.8% |
Sub Total |
313 | 5.2% | 12 | 147 | $44,225,920 | 1.2% |
BODY OF PIPE |
43 |
0.7% |
0 |
5 |
$27,559,555 |
0.7% |
BUTT WELD |
37 |
0.6% |
0 |
0 |
$34,309,072 |
0.9% |
COMPONENT |
68 |
1.1% |
0 |
4 |
$34,956,530 |
0.9% |
FILLET WELD |
19 |
0.3% |
0 |
0 |
$22,423,108 |
0.6% |
JOINT |
36 |
0.6% |
2 |
1 |
$9,524,723 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
64 |
1.0% |
0 |
2 |
$8,258,997 |
0.2% |
PIPE SEAM WELD |
47 |
0.7% |
0 |
0 |
$50,055,957 |
1.3% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
55 |
0.9% |
0 |
1 |
$19,526,515 |
0.5% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
34 |
0.5% |
0 |
4 |
$7,166,608 |
0.2% |
VARIOUS |
517 |
8.6% |
8 |
121 |
$251,795,764 |
6.8% |
Sub Total |
920 | 15.4% | 10 | 138 | $465,576,833 | 12.7% |
EARTH MOVEMENT |
36 |
0.6% |
0 |
5 |
$238,689,851 |
6.5% |
HEAVY RAINS/FLOODS |
81 |
1.3% |
0 |
1 |
$668,052,273 |
18.2% |
HIGH WINDS |
29 |
0.4% |
1 |
3 |
$255,454,944 |
6.9% |
LIGHTNING |
24 |
0.4% |
4 |
1 |
$25,349,668 |
0.6% |
TEMPERATURE |
16 |
0.2% |
3 |
1 |
$8,068,405 |
0.2% |
VARIOUS |
318 |
5.3% |
24 |
109 |
$186,414,894 |
5.0% |
Sub Total |
504 | 8.4% | 32 | 120 | $1,382,030,037 | 37.7% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
103 |
1.7% |
7 |
28 |
$74,902,287 |
2.0% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
102 |
1.7% |
3 |
11 |
$45,953,050 |
1.2% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
15 |
0.2% |
0 |
1 |
$23,409,939 |
0.6% |
VANDALISM |
11 |
0.1% |
3 |
7 |
$1,525,641 |
0.0% |
Sub Total |
231 | 3.8% | 13 | 47 | $145,790,918 | 3.9% |
MISCELLANEOUS |
130 |
2.1% |
3 |
23 |
$44,028,372 |
1.2% |
UNKNOWN |
112 |
1.8% |
18 |
49 |
$80,194,141 |
2.1% |
VARIOUS |
1,124 |
18.8% |
156 |
537 |
$434,272,839 |
11.8% |
Sub Total |
1,366 | 22.9% | 177 | 609 | $558,495,353 | 15.2% |
Totals |
5,960 |
100.0% |
421 |
1,780 |
$3,664,961,647 |
100.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
96 |
18 |
14 |
97 |
0 |
58 |
37 |
1989 |
76 |
19 |
17 |
92 |
0 |
41 |
32 |
1990 |
62 |
20 |
14 |
75 |
0 |
40 |
42 |
1991 |
54 |
20 |
15 |
92 |
0 |
60 |
38 |
1992 |
80 |
16 |
14 |
89 |
0 |
42 |
43 |
1993 |
78 |
24 |
18 |
89 |
0 |
44 |
40 |
1994 |
87 |
40 |
16 |
75 |
0 |
54 |
54 |
1995 |
55 |
26 |
30 |
76 |
0 |
38 |
34 |
1996 |
75 |
15 |
16 |
97 |
0 |
63 |
35 |
1997 |
78 |
18 |
13 |
72 |
0 |
59 |
27 |
1998 |
76 |
25 |
12 |
87 |
0 |
56 |
39 |
1999 |
90 |
14 |
19 |
76 |
0 |
40 |
36 |
2000 |
95 |
12 |
13 |
81 |
0 |
58 |
31 |
2001 |
59 |
14 |
12 |
80 |
0 |
50 |
18 |
2002 |
38 |
21 |
15 |
55 |
10 |
57 |
62 |
2003 |
48 |
28 |
15 |
81 |
13 |
47 |
64 |
2004 |
36 |
46 |
13 |
67 |
39 |
65 |
64 |
2005 |
38 |
77 |
18 |
45 |
55 |
52 |
73 |
2006 |
50 |
11 |
10 |
42 |
41 |
56 |
61 |
2007 |
55 |
16 |
10 |
57 |
33 |
65 |
48 |
National Hazardous Liquid: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
118 |
4.0% |
0 |
15 |
$73,153,501 |
4.9% |
CORROSION, INTERNAL |
80 |
2.7% |
0 |
0 |
$14,609,854 |
0.9% |
VARIOUS |
494 |
16.8% |
1 |
2 |
$202,938,067 |
13.7% |
Sub Total |
692 | 23.5% | 1 | 17 | $290,701,422 | 19.6% |
OPERATOR EXCAVATION DAMAGE |
32 |
1.0% |
0 |
1 |
$9,450,209 |
0.6% |
THIRD PARTY EXCAVATION DAMAGE |
86 |
2.9% |
5 |
6 |
$32,192,211 |
2.1% |
VARIOUS |
517 |
17.6% |
9 |
80 |
$178,653,319 |
12.0% |
Sub Total |
635 | 21.6% | 14 | 87 | $220,295,740 | 14.9% |
INCORRECT OPERATION |
45 |
1.5% |
4 |
4 |
$6,077,892 |
0.4% |
VARIOUS |
157 |
5.3% |
1 |
23 |
$27,177,100 |
1.8% |
Sub Total |
202 | 6.8% | 5 | 27 | $33,254,993 | 2.2% |
BODY OF PIPE |
20 |
0.6% |
0 |
0 |
$14,346,837 |
0.9% |
BUTT WELD |
17 |
0.5% |
0 |
0 |
$21,417,728 |
1.4% |
COMPONENT |
41 |
1.4% |
0 |
1 |
$19,664,315 |
1.3% |
FILLET WELD |
14 |
0.4% |
0 |
0 |
$20,216,887 |
1.3% |
JOINT |
16 |
0.5% |
0 |
0 |
$4,257,738 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
37 |
1.2% |
0 |
0 |
$2,059,629 |
0.1% |
PIPE SEAM WELD |
33 |
1.1% |
0 |
0 |
$46,033,688 |
3.1% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
50 |
1.7% |
0 |
0 |
$7,920,784 |
0.5% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
24 |
0.8% |
0 |
0 |
$2,666,168 |
0.1% |
VARIOUS |
334 |
11.3% |
0 |
3 |
$193,243,649 |
13.0% |
Sub Total |
586 | 19.9% | 0 | 4 | $331,827,427 | 22.4% |
EARTH MOVEMENT |
11 |
0.3% |
0 |
0 |
$53,201,401 |
3.6% |
HEAVY RAINS/FLOODS |
11 |
0.3% |
0 |
0 |
$52,797,644 |
3.5% |
HIGH WINDS |
12 |
0.4% |
0 |
0 |
$71,475,008 |
4.8% |
LIGHTNING |
17 |
0.5% |
0 |
0 |
$23,268,854 |
1.5% |
TEMPERATURE |
10 |
0.3% |
0 |
0 |
$6,991,170 |
0.4% |
VARIOUS |
58 |
1.9% |
0 |
1 |
$78,679,361 |
5.3% |
Sub Total |
119 | 4.0% | 0 | 1 | $286,413,439 | 19.3% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
14 |
0.4% |
0 |
0 |
$24,880,665 |
1.6% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
5 |
0.1% |
0 |
0 |
$3,057,021 |
0.2% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
8 |
0.2% |
0 |
0 |
$16,392,073 |
1.1% |
VANDALISM |
6 |
0.2% |
0 |
1 |
$994,831 |
0.0% |
Sub Total |
33 | 1.1% | 0 | 1 | $45,324,593 | 3.0% |
MISCELLANEOUS |
61 |
2.0% |
0 |
1 |
$13,505,714 |
0.9% |
UNKNOWN |
26 |
0.8% |
3 |
7 |
$37,143,863 |
2.5% |
VARIOUS |
584 |
19.8% |
18 |
88 |
$220,014,493 |
14.8% |
Sub Total |
671 | 22.8% | 21 | 96 | $270,664,071 | 18.3% |
Totals |
2,938 |
100.0% |
41 |
233 |
$1,478,481,688 |
100.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
39 |
1 |
12 |
50 |
0 |
45 |
20 |
1989 |
31 |
3 |
11 |
41 |
0 |
27 |
23 |
1990 |
41 |
2 |
10 |
34 |
0 |
27 |
26 |
1991 |
30 |
5 |
11 |
42 |
0 |
47 |
31 |
1992 |
46 |
1 |
11 |
49 |
0 |
34 |
29 |
1993 |
39 |
5 |
11 |
47 |
0 |
28 |
24 |
1994 |
54 |
13 |
9 |
29 |
0 |
30 |
43 |
1995 |
33 |
10 |
24 |
35 |
0 |
32 |
22 |
1996 |
44 |
2 |
10 |
42 |
0 |
53 |
23 |
1997 |
46 |
4 |
10 |
36 |
0 |
46 |
20 |
1998 |
39 |
7 |
6 |
32 |
0 |
34 |
22 |
1999 |
60 |
2 |
14 |
25 |
0 |
24 |
22 |
2000 |
40 |
0 |
9 |
34 |
0 |
31 |
21 |
2001 |
36 |
3 |
9 |
21 |
0 |
33 |
6 |
2002 |
13 |
5 |
8 |
24 |
5 |
36 |
42 |
2003 |
13 |
7 |
7 |
18 |
5 |
29 |
41 |
2004 |
12 |
16 |
4 |
22 |
6 |
36 |
38 |
2005 |
13 |
17 |
8 |
12 |
6 |
28 |
43 |
2006 |
13 |
5 |
5 |
13 |
6 |
32 |
34 |
2007 |
18 |
8 |
8 |
17 |
4 |
23 |
28 |
National Hazardous Liquid Onshore: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
115 |
3.9% |
0 |
15 |
$72,023,123 |
4.8% |
CORROSION, INTERNAL |
80 |
2.7% |
0 |
0 |
$14,609,854 |
0.9% |
VARIOUS |
479 |
16.3% |
1 |
2 |
$199,541,727 |
13.5% |
Sub Total |
674 | 22.9% | 1 | 17 | $286,174,704 | 19.3% |
OPERATOR EXCAVATION DAMAGE |
32 |
1.0% |
0 |
1 |
$9,450,209 |
0.6% |
THIRD PARTY EXCAVATION DAMAGE |
86 |
2.9% |
5 |
6 |
$32,192,211 |
2.1% |
VARIOUS |
499 |
16.9% |
9 |
80 |
$144,415,355 |
9.7% |
Sub Total |
617 | 21.0% | 14 | 87 | $186,057,776 | 12.5% |
INCORRECT OPERATION |
45 |
1.5% |
4 |
4 |
$6,077,892 |
0.4% |
VARIOUS |
157 |
5.3% |
1 |
23 |
$27,177,100 |
1.8% |
Sub Total |
202 | 6.8% | 5 | 27 | $33,254,993 | 2.2% |
BODY OF PIPE |
20 |
0.6% |
0 |
0 |
$14,346,837 |
0.9% |
BUTT WELD |
17 |
0.5% |
0 |
0 |
$21,417,728 |
1.4% |
COMPONENT |
39 |
1.3% |
0 |
1 |
$6,525,756 |
0.4% |
FILLET WELD |
14 |
0.4% |
0 |
0 |
$20,216,887 |
1.3% |
JOINT |
16 |
0.5% |
0 |
0 |
$4,257,738 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
37 |
1.2% |
0 |
0 |
$2,059,629 |
0.1% |
PIPE SEAM WELD |
33 |
1.1% |
0 |
0 |
$46,033,688 |
3.1% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
49 |
1.6% |
0 |
0 |
$7,369,646 |
0.5% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
24 |
0.8% |
0 |
0 |
$2,666,168 |
0.1% |
VARIOUS |
331 |
11.2% |
0 |
3 |
$188,607,417 |
12.7% |
Sub Total |
580 | 19.7% | 0 | 4 | $313,501,498 | 21.2% |
EARTH MOVEMENT |
10 |
0.3% |
0 |
0 |
$26,956,497 |
1.8% |
HEAVY RAINS/FLOODS |
9 |
0.3% |
0 |
0 |
$42,328,612 |
2.8% |
HIGH WINDS |
2 |
0.0% |
0 |
0 |
$15,995,479 |
1.0% |
LIGHTNING |
17 |
0.5% |
0 |
0 |
$23,268,854 |
1.5% |
TEMPERATURE |
10 |
0.3% |
0 |
0 |
$6,991,170 |
0.4% |
VARIOUS |
53 |
1.8% |
0 |
1 |
$63,786,396 |
4.3% |
Sub Total |
101 | 3.4% | 0 | 1 | $179,327,009 | 12.1% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
10 |
0.3% |
0 |
0 |
$15,089,624 |
1.0% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
5 |
0.1% |
0 |
0 |
$3,057,021 |
0.2% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
8 |
0.2% |
0 |
0 |
$16,392,073 |
1.1% |
VANDALISM |
6 |
0.2% |
0 |
1 |
$994,831 |
0.0% |
Sub Total |
29 | 0.9% | 0 | 1 | $35,533,552 | 2.4% |
MISCELLANEOUS |
59 |
2.0% |
0 |
1 |
$12,661,849 |
0.8% |
UNKNOWN |
24 |
0.8% |
3 |
7 |
$17,281,299 |
1.1% |
VARIOUS |
567 |
19.3% |
18 |
88 |
$208,470,486 |
14.1% |
Sub Total |
650 | 22.1% | 21 | 96 | $238,413,636 | 16.1% |
Totals |
2,853 |
97.1% |
41 |
233 |
$1,272,263,171 |
86.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
39 |
1 |
12 |
48 |
0 |
45 |
19 |
1989 |
31 |
3 |
11 |
40 |
0 |
27 |
23 |
1990 |
39 |
2 |
10 |
33 |
0 |
27 |
26 |
1991 |
30 |
5 |
11 |
41 |
0 |
47 |
31 |
1992 |
45 |
0 |
11 |
46 |
0 |
34 |
29 |
1993 |
39 |
5 |
11 |
46 |
0 |
27 |
24 |
1994 |
54 |
12 |
9 |
29 |
0 |
29 |
43 |
1995 |
32 |
10 |
24 |
34 |
0 |
32 |
22 |
1996 |
43 |
2 |
10 |
42 |
0 |
51 |
23 |
1997 |
43 |
4 |
10 |
33 |
0 |
44 |
19 |
1998 |
38 |
4 |
6 |
30 |
0 |
31 |
22 |
1999 |
56 |
2 |
14 |
24 |
0 |
24 |
21 |
2000 |
37 |
0 |
9 |
32 |
0 |
29 |
21 |
2001 |
35 |
3 |
9 |
21 |
0 |
30 |
6 |
2002 |
13 |
5 |
8 |
24 |
4 |
33 |
42 |
2003 |
13 |
7 |
7 |
18 |
5 |
29 |
41 |
2004 |
11 |
10 |
4 |
22 |
5 |
36 |
36 |
2005 |
12 |
11 |
8 |
12 |
5 |
28 |
42 |
2006 |
12 |
4 |
5 |
13 |
5 |
32 |
34 |
2007 |
17 |
8 |
8 |
17 |
4 |
22 |
28 |
National Hazardous Liquid Offshore: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
3 |
0.1% |
0 |
0 |
$1,130,377 |
0.0% |
VARIOUS |
15 |
0.5% |
0 |
0 |
$3,396,340 |
0.2% |
Sub Total |
18 | 0.6% | 0 | 0 | $4,526,718 | 0.3% |
VARIOUS |
18 |
0.6% |
0 |
0 |
$34,237,963 |
2.3% |
Sub Total |
18 | 0.6% | 0 | 0 | $34,237,963 | 2.3% |
COMPONENT |
2 |
0.0% |
0 |
0 |
$13,138,559 |
0.8% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
1 |
0.0% |
0 |
0 |
$551,138 |
0.0% |
VARIOUS |
3 |
0.1% |
0 |
0 |
$4,636,231 |
0.3% |
Sub Total |
6 | 0.2% | 0 | 0 | $18,325,929 | 1.2% |
EARTH MOVEMENT |
1 |
0.0% |
0 |
0 |
$26,244,903 |
1.7% |
HEAVY RAINS/FLOODS |
2 |
0.0% |
0 |
0 |
$10,469,032 |
0.7% |
HIGH WINDS |
10 |
0.3% |
0 |
0 |
$55,479,529 |
3.7% |
VARIOUS |
5 |
0.1% |
0 |
0 |
$14,892,964 |
1.0% |
Sub Total |
18 | 0.6% | 0 | 0 | $107,086,429 | 7.2% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
4 |
0.1% |
0 |
0 |
$9,791,040 |
0.6% |
Sub Total |
4 | 0.1% | 0 | 0 | $9,791,040 | 0.6% |
MISCELLANEOUS |
3 |
0.1% |
0 |
0 |
$939,696 |
0.0% |
UNKNOWN |
2 |
0.0% |
0 |
0 |
$19,862,563 |
1.3% |
VARIOUS |
17 |
0.5% |
0 |
0 |
$11,544,007 |
0.7% |
Sub Total |
22 | 0.7% | 0 | 0 | $32,346,266 | 2.1% |
Totals |
86 |
2.9% |
0 |
0 |
$206,314,348 |
13.9% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
0 |
0 |
0 |
2 |
0 |
0 |
1 |
1989 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
1990 |
2 |
0 |
0 |
1 |
0 |
0 |
0 |
1991 |
0 |
0 |
0 |
1 |
0 |
0 |
0 |
1992 |
1 |
1 |
0 |
3 |
0 |
0 |
0 |
1993 |
0 |
0 |
0 |
1 |
0 |
1 |
0 |
1994 |
0 |
1 |
0 |
0 |
0 |
1 |
0 |
1995 |
1 |
0 |
0 |
1 |
0 |
0 |
0 |
1996 |
1 |
0 |
0 |
0 |
0 |
2 |
0 |
1997 |
3 |
0 |
0 |
3 |
0 |
2 |
1 |
1998 |
1 |
3 |
0 |
2 |
0 |
3 |
0 |
1999 |
4 |
0 |
0 |
1 |
0 |
0 |
1 |
2000 |
3 |
0 |
0 |
2 |
0 |
2 |
0 |
2001 |
1 |
0 |
0 |
0 |
0 |
3 |
0 |
2002 |
1 |
0 |
0 |
0 |
1 |
3 |
0 |
2004 |
1 |
6 |
0 |
0 |
1 |
0 |
2 |
2005 |
1 |
6 |
0 |
0 |
1 |
0 |
1 |
2006 |
1 |
1 |
0 |
0 |
1 |
0 |
0 |
2007 |
1 |
0 |
0 |
0 |
0 |
1 |
0 |
National Gas Transmission: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
53 |
4.8% |
1 |
2 |
$137,645,191 |
15.1% |
CORROSION, INTERNAL |
66 |
6.0% |
0 |
0 |
$42,500,426 |
4.6% |
VARIOUS |
133 |
12.2% |
12 |
3 |
$42,743,214 |
4.7% |
Sub Total |
252 | 23.1% | 13 | 5 | $222,888,832 | 24.5% |
OPERATOR EXCAVATION DAMAGE |
10 |
0.9% |
0 |
2 |
$1,427,077 |
0.1% |
THIRD PARTY EXCAVATION DAMAGE |
56 |
5.1% |
6 |
4 |
$15,643,631 |
1.7% |
VARIOUS |
170 |
15.6% |
30 |
69 |
$101,685,069 |
11.2% |
Sub Total |
236 | 21.6% | 36 | 75 | $118,755,777 | 13.0% |
INCORRECT OPERATION |
17 |
1.5% |
0 |
5 |
$4,218,790 |
0.4% |
Sub Total |
17 | 1.5% | 0 | 5 | $4,218,790 | 0.4% |
BODY OF PIPE |
18 |
1.6% |
0 |
0 |
$11,737,321 |
1.2% |
BUTT WELD |
20 |
1.8% |
0 |
0 |
$12,891,344 |
1.4% |
COMPONENT |
18 |
1.6% |
0 |
1 |
$7,709,332 |
0.8% |
FILLET WELD |
5 |
0.4% |
0 |
0 |
$2,206,220 |
0.2% |
JOINT |
11 |
1.0% |
0 |
0 |
$2,627,127 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
20 |
1.8% |
0 |
2 |
$4,759,973 |
0.5% |
PIPE SEAM WELD |
14 |
1.2% |
0 |
0 |
$4,022,269 |
0.4% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
4 |
0.3% |
0 |
1 |
$11,455,730 |
1.2% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
7 |
0.6% |
0 |
3 |
$2,816,586 |
0.3% |
VARIOUS |
83 |
7.6% |
1 |
12 |
$45,559,121 |
5.0% |
Sub Total |
200 | 18.3% | 1 | 19 | $105,785,028 | 11.6% |
EARTH MOVEMENT |
8 |
0.7% |
0 |
0 |
$7,106,855 |
0.7% |
HEAVY RAINS/FLOODS |
50 |
4.5% |
0 |
0 |
$102,254,888 |
11.2% |
HIGH WINDS |
8 |
0.7% |
0 |
0 |
$116,705,488 |
12.8% |
LIGHTNING |
3 |
0.2% |
0 |
0 |
$966,664 |
0.1% |
VARIOUS |
50 |
4.5% |
0 |
2 |
$53,928,533 |
5.9% |
Sub Total |
119 | 10.9% | 0 | 2 | $280,962,430 | 30.9% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
30 |
2.7% |
0 |
5 |
$34,397,305 |
3.7% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
5 |
0.4% |
0 |
1 |
$4,673,532 |
0.5% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
4 |
0.3% |
0 |
1 |
$3,697,854 |
0.4% |
VANDALISM |
1 |
0.0% |
0 |
0 |
$146,416 |
0.0% |
Sub Total |
40 | 3.6% | 0 | 7 | $42,915,109 | 4.7% |
MISCELLANEOUS |
39 |
3.5% |
0 |
2 |
$18,777,549 |
2.0% |
UNKNOWN |
30 |
2.7% |
0 |
4 |
$29,416,415 |
3.2% |
VARIOUS |
156 |
14.3% |
9 |
88 |
$83,605,928 |
9.2% |
Sub Total |
225 | 20.6% | 9 | 94 | $131,799,892 | 14.5% |
Totals |
1,089 |
100.0% |
59 |
207 |
$907,325,861 |
100.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
11 |
4 |
0 |
12 |
0 |
6 |
6 |
1989 |
13 |
0 |
0 |
15 |
0 |
7 |
5 |
1990 |
8 |
6 |
0 |
14 |
0 |
10 |
8 |
1991 |
6 |
2 |
0 |
12 |
0 |
7 |
2 |
1992 |
14 |
5 |
0 |
12 |
0 |
6 |
5 |
1993 |
19 |
6 |
0 |
6 |
0 |
10 |
9 |
1994 |
9 |
4 |
0 |
12 |
0 |
16 |
4 |
1995 |
9 |
6 |
0 |
8 |
0 |
2 |
7 |
1996 |
9 |
1 |
0 |
19 |
0 |
8 |
6 |
1997 |
6 |
4 |
0 |
11 |
0 |
9 |
3 |
1998 |
12 |
3 |
0 |
12 |
0 |
13 |
11 |
1999 |
10 |
3 |
0 |
11 |
0 |
8 |
6 |
2000 |
16 |
3 |
0 |
11 |
0 |
21 |
3 |
2001 |
14 |
3 |
0 |
15 |
0 |
10 |
8 |
2002 |
5 |
5 |
1 |
7 |
4 |
17 |
17 |
2003 |
8 |
2 |
6 |
11 |
7 |
16 |
19 |
2004 |
4 |
7 |
1 |
13 |
5 |
18 |
14 |
2005 |
11 |
41 |
3 |
10 |
9 |
14 |
21 |
2006 |
19 |
1 |
3 |
9 |
8 |
15 |
24 |
2007 |
12 |
2 |
2 |
10 |
4 |
33 |
13 |
National Gas Transmission Onshore: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
52 |
4.7% |
1 |
2 |
$137,462,244 |
15.1% |
CORROSION, INTERNAL |
19 |
1.7% |
0 |
0 |
$21,572,386 |
2.3% |
VARIOUS |
89 |
8.1% |
12 |
3 |
$33,098,137 |
3.6% |
Sub Total |
160 | 14.6% | 13 | 5 | $192,132,768 | 21.1% |
OPERATOR EXCAVATION DAMAGE |
10 |
0.9% |
0 |
2 |
$1,427,077 |
0.1% |
THIRD PARTY EXCAVATION DAMAGE |
55 |
5.0% |
6 |
4 |
$14,082,583 |
1.5% |
VARIOUS |
136 |
12.4% |
12 |
49 |
$67,184,805 |
7.4% |
Sub Total |
201 | 18.4% | 18 | 55 | $82,694,465 | 9.1% |
INCORRECT OPERATION |
16 |
1.4% |
0 |
5 |
$3,531,692 |
0.3% |
Sub Total |
16 | 1.4% | 0 | 5 | $3,531,692 | 0.3% |
BODY OF PIPE |
17 |
1.5% |
0 |
0 |
$11,629,318 |
1.2% |
BUTT WELD |
19 |
1.7% |
0 |
0 |
$12,676,952 |
1.4% |
COMPONENT |
8 |
0.7% |
0 |
1 |
$2,472,569 |
0.2% |
FILLET WELD |
5 |
0.4% |
0 |
0 |
$2,206,220 |
0.2% |
JOINT |
8 |
0.7% |
0 |
0 |
$1,867,438 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
20 |
1.8% |
0 |
2 |
$4,759,973 |
0.5% |
PIPE SEAM WELD |
14 |
1.2% |
0 |
0 |
$4,022,269 |
0.4% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
4 |
0.3% |
0 |
1 |
$11,455,730 |
1.2% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
7 |
0.6% |
0 |
3 |
$2,816,586 |
0.3% |
VARIOUS |
64 |
5.8% |
1 |
12 |
$39,133,752 |
4.3% |
Sub Total |
166 | 15.2% | 1 | 19 | $93,040,811 | 10.2% |
EARTH MOVEMENT |
7 |
0.6% |
0 |
0 |
$6,545,620 |
0.7% |
HEAVY RAINS/FLOODS |
11 |
1.0% |
0 |
0 |
$7,263,935 |
0.8% |
HIGH WINDS |
4 |
0.3% |
0 |
0 |
$85,464,959 |
9.4% |
LIGHTNING |
3 |
0.2% |
0 |
0 |
$966,664 |
0.1% |
VARIOUS |
40 |
3.6% |
0 |
2 |
$37,936,502 |
4.1% |
Sub Total |
65 | 5.9% | 0 | 2 | $138,177,683 | 15.2% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
16 |
1.4% |
0 |
5 |
$10,841,516 |
1.1% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
5 |
0.4% |
0 |
1 |
$4,673,532 |
0.5% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
3 |
0.2% |
0 |
1 |
$1,979,419 |
0.2% |
VANDALISM |
1 |
0.0% |
0 |
0 |
$146,416 |
0.0% |
Sub Total |
25 | 2.3% | 0 | 7 | $17,640,884 | 1.9% |
MISCELLANEOUS |
31 |
2.8% |
0 |
2 |
$12,325,527 |
1.3% |
UNKNOWN |
23 |
2.1% |
0 |
4 |
$27,683,096 |
3.0% |
VARIOUS |
149 |
13.6% |
7 |
86 |
$82,295,216 |
9.0% |
Sub Total |
203 | 18.6% | 7 | 92 | $122,303,840 | 13.4% |
Totals |
836 |
76.7% |
39 |
185 |
$649,522,145 |
71.5% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
11 |
2 |
0 |
9 |
0 |
4 |
5 |
1989 |
12 |
0 |
0 |
11 |
0 |
3 |
3 |
1990 |
7 |
6 |
0 |
13 |
0 |
5 |
5 |
1991 |
6 |
2 |
0 |
12 |
0 |
5 |
2 |
1992 |
14 |
2 |
0 |
8 |
0 |
5 |
3 |
1993 |
17 |
6 |
0 |
4 |
0 |
10 |
6 |
1994 |
9 |
4 |
0 |
7 |
0 |
10 |
4 |
1995 |
7 |
4 |
0 |
5 |
0 |
1 |
5 |
1996 |
9 |
0 |
0 |
16 |
0 |
6 |
3 |
1997 |
6 |
3 |
0 |
8 |
0 |
6 |
3 |
1998 |
12 |
3 |
0 |
9 |
0 |
8 |
8 |
1999 |
10 |
3 |
0 |
10 |
0 |
5 |
6 |
2000 |
16 |
3 |
0 |
10 |
0 |
13 |
3 |
2001 |
13 |
2 |
0 |
14 |
0 |
8 |
8 |
2002 |
3 |
3 |
1 |
7 |
2 |
9 |
15 |
2003 |
8 |
1 |
6 |
10 |
6 |
11 |
19 |
2004 |
4 |
2 |
1 |
13 |
3 |
6 |
14 |
2005 |
9 |
11 |
2 |
10 |
4 |
10 |
17 |
2006 |
11 |
1 |
3 |
9 |
6 |
11 |
19 |
2007 |
10 |
2 |
2 |
10 |
1 |
20 |
10 |
National Gas Transmission Offshore: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
1 |
0.0% |
0 |
0 |
$182,947 |
0.0% |
CORROSION, INTERNAL |
47 |
4.3% |
0 |
0 |
$20,928,039 |
2.3% |
VARIOUS |
44 |
4.0% |
0 |
0 |
$9,645,077 |
1.0% |
Sub Total |
92 | 8.4% | 0 | 0 | $30,756,064 | 3.3% |
THIRD PARTY EXCAVATION DAMAGE |
1 |
0.0% |
0 |
0 |
$1,561,047 |
0.1% |
VARIOUS |
34 |
3.1% |
18 |
20 |
$34,500,264 |
3.8% |
Sub Total |
35 | 3.2% | 18 | 20 | $36,061,311 | 3.9% |
INCORRECT OPERATION |
1 |
0.0% |
0 |
0 |
$687,098 |
0.0% |
Sub Total |
1 | 0.0% | 0 | 0 | $687,098 | 0.0% |
BODY OF PIPE |
1 |
0.0% |
0 |
0 |
$108,003 |
0.0% |
BUTT WELD |
1 |
0.0% |
0 |
0 |
$214,392 |
0.0% |
COMPONENT |
10 |
0.9% |
0 |
0 |
$5,236,762 |
0.5% |
JOINT |
3 |
0.2% |
0 |
0 |
$759,689 |
0.0% |
VARIOUS |
19 |
1.7% |
0 |
0 |
$6,425,369 |
0.7% |
Sub Total |
34 | 3.1% | 0 | 0 | $12,744,216 | 1.4% |
EARTH MOVEMENT |
1 |
0.0% |
0 |
0 |
$561,234 |
0.0% |
HEAVY RAINS/FLOODS |
39 |
3.5% |
0 |
0 |
$94,990,952 |
10.4% |
HIGH WINDS |
4 |
0.3% |
0 |
0 |
$31,240,528 |
3.4% |
VARIOUS |
10 |
0.9% |
0 |
0 |
$15,992,031 |
1.7% |
Sub Total |
54 | 4.9% | 0 | 0 | $142,784,747 | 15.7% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
14 |
1.2% |
0 |
0 |
$23,555,789 |
2.6% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
1 |
0.0% |
0 |
0 |
$1,718,434 |
0.1% |
Sub Total |
15 | 1.3% | 0 | 0 | $25,274,224 | 2.7% |
MISCELLANEOUS |
8 |
0.7% |
0 |
0 |
$6,452,021 |
0.7% |
UNKNOWN |
7 |
0.6% |
0 |
0 |
$1,733,319 |
0.1% |
VARIOUS |
7 |
0.6% |
2 |
2 |
$1,310,711 |
0.1% |
Sub Total |
22 | 2.0% | 2 | 2 | $9,496,052 | 1.0% |
Totals |
253 |
23.2% |
20 |
22 |
$257,803,716 |
28.4% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
0 |
2 |
0 |
3 |
0 |
2 |
1 |
1989 |
1 |
0 |
0 |
4 |
0 |
4 |
2 |
1990 |
1 |
0 |
0 |
1 |
0 |
5 |
3 |
1991 |
0 |
0 |
0 |
0 |
0 |
2 |
0 |
1992 |
0 |
3 |
0 |
4 |
0 |
1 |
2 |
1993 |
2 |
0 |
0 |
2 |
0 |
0 |
3 |
1994 |
0 |
0 |
0 |
5 |
0 |
6 |
0 |
1995 |
2 |
2 |
0 |
3 |
0 |
1 |
2 |
1996 |
0 |
1 |
0 |
3 |
0 |
2 |
3 |
1997 |
0 |
1 |
0 |
3 |
0 |
3 |
0 |
1998 |
0 |
0 |
0 |
3 |
0 |
5 |
3 |
1999 |
0 |
0 |
0 |
1 |
0 |
3 |
0 |
2000 |
0 |
0 |
0 |
1 |
0 |
8 |
0 |
2001 |
1 |
1 |
0 |
1 |
0 |
2 |
0 |
2002 |
2 |
2 |
0 |
0 |
2 |
8 |
2 |
2003 |
0 |
1 |
0 |
1 |
1 |
5 |
0 |
2004 |
0 |
5 |
0 |
0 |
2 |
12 |
0 |
2005 |
2 |
30 |
1 |
0 |
5 |
4 |
4 |
2006 |
8 |
0 |
0 |
0 |
2 |
4 |
5 |
2007 |
2 |
0 |
0 |
0 |
3 |
13 |
3 |
National Gas Gathering: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
4 |
3.4% |
0 |
0 |
$971,270 |
0.3% |
CORROSION, INTERNAL |
32 |
27.8% |
0 |
0 |
$17,667,231 |
6.3% |
VARIOUS |
23 |
20.0% |
0 |
4 |
$7,812,676 |
2.8% |
Sub Total |
59 | 51.3% | 0 | 4 | $26,451,178 | 9.4% |
THIRD PARTY EXCAVATION DAMAGE |
1 |
0.8% |
0 |
0 |
$109,352 |
0.0% |
VARIOUS |
12 |
10.4% |
0 |
2 |
$11,910,530 |
4.2% |
Sub Total |
13 | 11.3% | 0 | 2 | $12,019,883 | 4.3% |
INCORRECT OPERATION |
2 |
1.7% |
0 |
3 |
$21,870 |
0.0% |
Sub Total |
2 | 1.7% | 0 | 3 | $21,870 | 0.0% |
COMPONENT |
5 |
4.3% |
0 |
1 |
$6,626,254 |
2.3% |
JOINT |
2 |
1.7% |
0 |
0 |
$368,428 |
0.1% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
1 |
0.8% |
0 |
0 |
$89,231 |
0.0% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
2 |
1.7% |
0 |
0 |
$1,680,509 |
0.6% |
VARIOUS |
7 |
6.0% |
0 |
2 |
$2,407,779 |
0.8% |
Sub Total |
17 | 14.7% | 0 | 3 | $11,172,203 | 4.0% |
EARTH MOVEMENT |
6 |
5.2% |
0 |
0 |
$172,921,330 |
61.9% |
HEAVY RAINS/FLOODS |
3 |
2.6% |
0 |
0 |
$838,241 |
0.3% |
HIGH WINDS |
3 |
2.6% |
0 |
0 |
$45,097,342 |
16.1% |
VARIOUS |
1 |
0.8% |
0 |
0 |
$417,330 |
0.1% |
Sub Total |
13 | 11.3% | 0 | 0 | $219,274,245 | 78.5% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
2 |
1.7% |
0 |
1 |
$2,319,187 |
0.8% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
1 |
0.8% |
0 |
0 |
$1,832,941 |
0.6% |
Sub Total |
3 | 2.6% | 0 | 1 | $4,152,128 | 1.4% |
MISCELLANEOUS |
2 |
1.7% |
0 |
0 |
$4,632,941 |
1.6% |
UNKNOWN |
1 |
0.8% |
0 |
0 |
$306,368 |
0.1% |
VARIOUS |
5 |
4.3% |
0 |
2 |
$1,262,676 |
0.4% |
Sub Total |
8 | 6.9% | 0 | 2 | $6,201,985 | 2.2% |
Totals |
115 |
100.0% |
0 |
15 |
$279,293,495 |
100.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
1 |
0 |
0 |
0 |
0 |
2 |
0 |
1989 |
1 |
0 |
0 |
1 |
0 |
2 |
0 |
1990 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
1991 |
0 |
1 |
0 |
3 |
0 |
0 |
0 |
1992 |
1 |
0 |
0 |
3 |
0 |
0 |
2 |
1993 |
0 |
0 |
0 |
0 |
0 |
1 |
0 |
1994 |
0 |
0 |
0 |
1 |
0 |
4 |
0 |
1995 |
1 |
0 |
0 |
0 |
0 |
1 |
1 |
1997 |
0 |
0 |
0 |
1 |
0 |
1 |
1 |
1998 |
0 |
0 |
0 |
1 |
0 |
5 |
1 |
1999 |
1 |
0 |
0 |
0 |
0 |
1 |
0 |
2000 |
0 |
0 |
0 |
0 |
0 |
3 |
0 |
2001 |
0 |
0 |
0 |
2 |
0 |
3 |
1 |
2002 |
0 |
1 |
0 |
0 |
1 |
2 |
0 |
2003 |
0 |
0 |
0 |
0 |
0 |
2 |
1 |
2004 |
0 |
2 |
1 |
1 |
0 |
6 |
2 |
2005 |
0 |
7 |
1 |
0 |
1 |
8 |
1 |
2006 |
2 |
0 |
0 |
0 |
1 |
6 |
3 |
2007 |
1 |
0 |
0 |
0 |
0 |
8 |
1 |
National Gas Distribution: Significant Incident Details: 1988-2008 YTD
Reported Cause of Incident |
Number |
% |
Fatalities |
Injuries |
Property Damage |
% of Property Damage |
CORROSION, EXTERNAL |
12 |
0.6% |
2 |
7 |
$1,427,283 |
0.1% |
CORROSION, INTERNAL |
1 |
0.0% |
0 |
1 |
$437,511 |
0.0% |
VARIOUS |
58 |
3.1% |
14 |
66 |
$9,199,086 |
0.9% |
Sub Total |
71 | 3.9% | 16 | 74 | $11,063,882 | 1.1% |
OPERATOR EXCAVATION DAMAGE |
7 |
0.3% |
1 |
6 |
$958,249 |
0.1% |
THIRD PARTY EXCAVATION DAMAGE |
98 |
5.3% |
7 |
30 |
$32,482,479 |
3.2% |
VARIOUS |
563 |
30.9% |
89 |
419 |
$133,225,136 |
13.3% |
Sub Total |
668 | 36.7% | 97 | 455 | $166,665,865 | 16.6% |
INCORRECT OPERATION |
18 |
0.9% |
4 |
15 |
$3,495,937 |
0.3% |
VARIOUS |
74 |
4.0% |
3 |
97 |
$3,234,327 |
0.3% |
Sub Total |
92 | 5.0% | 7 | 112 | $6,730,265 | 0.6% |
BODY OF PIPE |
5 |
0.2% |
0 |
5 |
$1,475,396 |
0.1% |
COMPONENT |
4 |
0.2% |
0 |
1 |
$956,628 |
0.1% |
JOINT |
7 |
0.3% |
2 |
1 |
$2,271,429 |
0.2% |
MALFUNCTION OF CONTROL/RELIEF EQUIPMENT |
6 |
0.3% |
0 |
0 |
$1,350,162 |
0.1% |
RUPTURED OR LEAKING SEAL/PUMP PACKING |
1 |
0.0% |
0 |
0 |
$150,000 |
0.0% |
THREADS STRIPPED, BROKEN PIPE COUPLING |
1 |
0.0% |
0 |
1 |
$3,344 |
0.0% |
VARIOUS |
93 |
5.1% |
7 |
104 |
$10,585,214 |
1.0% |
Sub Total |
117 | 6.4% | 9 | 112 | $16,792,174 | 1.6% |
EARTH MOVEMENT |
11 |
0.6% |
0 |
5 |
$5,460,263 |
0.5% |
HEAVY RAINS/FLOODS |
17 |
0.9% |
0 |
1 |
$512,161,499 |
51.2% |
HIGH WINDS |
6 |
0.3% |
1 |
3 |
$22,177,104 |
2.2% |
LIGHTNING |
4 |
0.2% |
4 |
1 |
$1,114,149 |
0.1% |
TEMPERATURE |
6 |
0.3% |
3 |
1 |
$1,077,235 |
0.1% |
VARIOUS |
209 |
11.5% |
24 |
106 |
$53,389,669 |
5.3% |
Sub Total |
253 | 13.9% | 32 | 117 | $595,379,922 | 59.5% |
CAR, TRUCK OR OTHER VEHICLE NOT RELATED TO... |
57 |
3.1% |
7 |
22 |
$13,305,128 |
1.3% |
FIRE/EXPLOSION AS PRIMARY CAUSE |
92 |
5.0% |
3 |
10 |
$38,222,496 |
3.8% |
RUPTURE OF PREVIOUSLY DAMAGED PIPE |
2 |
0.1% |
0 |
0 |
$1,487,069 |
0.1% |
VANDALISM |
4 |
0.2% |
3 |
6 |
$384,393 |
0.0% |
Sub Total |
155 | 8.5% | 13 | 38 | $53,399,088 | 5.3% |
MISCELLANEOUS |
28 |
1.5% |
3 |
20 |
$7,112,167 |
0.7% |
UNKNOWN |
55 |
3.0% |
15 |
38 |
$13,327,494 |
1.3% |
VARIOUS |
379 |
20.8% |
129 |
359 |
$129,389,741 |
12.9% |
Sub Total |
462 | 25.4% | 147 | 417 | $149,829,403 | 14.9% |
Totals |
1,818 |
100.0% |
321 |
1,325 |
$999,860,602 |
100.0% |
Source Data
Year |
ALL OTHER CAUSES |
NATURAL FORCE DAMAGE |
HUMAN ERROR |
EXCAVATION DAMAGE |
OTHER OUTSIDE FORCE DAMAGE |
CORROSION |
MATERIAL FAILURE |
1988 |
45 |
13 |
2 |
35 |
0 |
5 |
11 |
1989 |
31 |
16 |
6 |
35 |
0 |
5 |
4 |
1990 |
13 |
12 |
4 |
27 |
0 |
3 |
7 |
1991 |
18 |
12 |
4 |
35 |
0 |
6 |
5 |
1992 |
19 |
10 |
3 |
25 |
0 |
2 |
7 |
1993 |
20 |
13 |
7 |
36 |
0 |
5 |
7 |
1994 |
24 |
23 |
7 |
33 |
0 |
4 |
7 |
1995 |
12 |
10 |
6 |
33 |
0 |
3 |
4 |
1996 |
22 |
12 |
6 |
36 |
0 |
2 |
6 |
1997 |
26 |
10 |
3 |
24 |
0 |
3 |
3 |
1998 |
25 |
15 |
6 |
42 |
0 |
4 |
5 |
1999 |
19 |
9 |
5 |
40 |
0 |
7 |
8 |
2000 |
39 |
9 |
4 |
36 |
0 |
3 |
7 |
2001 |
9 |
8 |
3 |
42 |
0 |
4 |
3 |
2002 |
20 |
10 |
6 |
24 |
0 |
2 |
3 |
2003 |
27 |
19 |
2 |
52 |
1 |
0 |
3 |
2004 |
20 |
21 |
7 |
31 |
28 |
5 |
10 |
2005 |
14 |
12 |
6 |
23 |
39 |
2 |
8 |
2006 |
16 |
5 |
2 |
20 |
26 |
3 |
0 |
2007 |
24 |
6 |
0 |
30 |
25 |
1 |
6 |
Notes
- Significant Incidents are those incidents reported by pipeline operators with any of the following conditions are met: 1) fatality or injury requiring in-patient hospitalization. 2) $50,000 or more in total costs, measured in 1984 dollars. 3) highly volatile liquid releases of 5 barrels or more or other liquid releases of 50 barrels or more. 4) liquid releases resulting in an unintentional fire or explosion. Note: Significant Incidents include all Serious Incidents. Unless otherwise noted, any counts of Significant Incidents also include Serious Incidents.
- Costs in the current year (2008) are nominal (as reported). The costs for incidents prior to 2008 are presented in 2007 dollars. Cost of Gas lost is indexed via the Energy Information Administration, Natural Gas City Gate Prices. All other costs are adjusted via the Bureau of Economic Analysis, Government Printing Office inflation values.
- For years 2002 and later, property damage is estimated as the sum of all public and private costs reported in the 30-day incident report. For years prior to 2002, accident report forms did not include a breakdown of public and private costs so property damage for these years is the reported total property damage field in the report. All costs prior to 2008 are expressed in 2007 dollars. Costs in current year (2008) are nominal.
- Does not include 1,851 injuries that required medical treatment reported for the October, 1994 accidents that were caused by severe flooding near Houston, Texas.
Sources
- PHMSA Hazardous Liquid Filtered Incidents File - October 14, 2008
- PHMSA Gas Transmission Filtered Incidents File - October 14, 2008
- PHMSA Gas Distribution Filtered Incidents File - October 14, 2008
See Pipeline Incidents and Mileage Reports for more pipeline safety reports.