PHMSA Gas Integrity Management
Time: 11/08/2008 04:40 PM

Protocol Area N. Submittal of Program Documents

Protocol:  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P 

N.01 Integrity Management Program Document Submittal

Verify that the operator includes provisions in its program to submit, upon request, the operator's risk analysis or integrity management program to: [§192.911(n)]

[See Details...]

Explanation of Protocol Format

Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]

Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.

Notes on protocols:
Protocol:  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P 
DOT Website | PHMSA Website | Pipeline Safety Website | Feedback | Privacy Policy | FOIA