Protocol Areas | Protocol A as Offline Form |
Protocol A as Offline Document |
Protocol A Outline |
Next » (A.02) |
Last »» (P.01) |
Verify that the methods defined in §192.903 High Consequence Area (1) and/or §192.903 High Consequence Area (2) are applied to each pipeline for the identification of high consequence areas. [§192.905(a)]
Verify the operator's integrity management program includes documented processes on how to implement methods (1) and (2) in order to identify high consequence areas. [§192.905(a)]
Verify that the operator's process requires that the method used for each portion of the pipeline system be documented. [§192.905(a)]
Verify that the operator's integrity management program includes system maps or other suitably detailed means documenting the pipeline segment locations that are located in high consequence areas. [§192.905(a)]
Inspections |
Home Page |
Reference |
FAQ |
Key Documents |
Protocols |
Topical Index |
Glossary |
Rule Outline |
In Context |
Protocol Areas |
Protocol A as Offline Form |
Protocol A as Offline Document |
Protocol A Outline |
Print-Friendly |
My Pages |
Questions and Comments |
Log In... |