A.1 | Name of your facility: |
| John Zink Company LLC
|
A.2 | Name of your parent company: |
| Koch Chemical Technology Group LLC
|
A.3 | Facility contact person for the Performance Track program: |
|   Name: | Mr. Steve A. Clark |
|   Title: | Environmental/Facilities Manager |
|   Phone: | (918) 234-2730 |
|   Fax: | (918) 234-2700 |
|   Email: | steve.clark@johnzink.com |
A.4 | Facility location: |
|   Street Address: | 11920 East Apache |
|   Address Cont: | PO Box 21220 |
|   City: | Tulsa |
|   State: | OK |
|   Zip Code: | 74116 |
| Mailing address (if different from above): |
|   Mailing Address: | |
|   Address Cont: | |
|   City: | |
|   State: | |
|   Zip Code: | |
A.5 | Facility's website address (if any): |
| http://www.johnzink.com |
A.6 | Number of employees (full-time equivalents) who currently work in the facility: |
| 500-1,000 |
A.7 | North American Industrial Classification System (NAICS) Code(s) that is(are) used to classify business at the facility: |
| 332322  332313  332341     |
A.8 | In your application and, perhaps, in previous annual performance reports, you described what your facility does or makes. Have there been any (additional) changes to your facility's list of products and/or activities? If yes, please list them here: |
| No Changes |
|
|
A.9 | Have the environmental requirements applicable to your facility changed during this reporting period? If yes, please describe these changes here. |
| No Changes |
| |
B.1.d | (Optional) If you would like to describe any other audits or inspections that were conducted at your facility, please do so here.
| |
|
City of Tulsa conducted annual site inspection for compliance to stormwater permit and industrial sanitary sewer discharge permit.
| |
B.1.e | Briefly summarize corrective actions taken and other improvements made as a result of your EMS assessments and compliance audits.
| |
|
1. Revised our air emissions data base which we use to calculate daily air emissions from each process area and source unit to correspond with new reporting requirements of ODEQ's revised (RedBud) Annual Air Emissions Reporting data base system.
| |
B.1.f | Has your facility corrected all instances of potential non-compliance and EMS non-conformance identified during your audits and other assessments? | |
| Yes
| |
| If no, please explain your plans to correct these instances. | |
|
| |
B.1.g | When was the last Senior Management review of your EMS completed? | |
| December  2004 | |
| Who was the senior manager present at the review? | |
| Name: Mr. Stephen Pirnat | |
| Title: President CEO
| |
B.2.a | ISO 14001 Certification. Is your facility currently certified to ISO 14001?
| |
| Yes
| |
B.2.b | Is your facility a Responsible Care-certified facility? |
| No
|
B.3 | Environmental Aspects Identification. When did your facility last conduct a systematic identification and/or review of your environmental aspects?
| |
| December  2004
| |
B.4 | Progress Toward Achieving Objectives and Targets. In the table below, please provide a narrative summary of progress made toward EMS objectives and targets other than those reported as Environmental Performance Commitments in Section C. You may limit the summary to environmental aspects that are significant and towards which progress has been made during the reporting year. Do you have additional environmental aspects to report? Yes
| |
|
Environmental Aspect | Progress Made This Year (e.g., quantitative or qualitative improvements, activities conducted) |
Contractor Performance Evaluation | Extended our contractor environmental performance evaluation and approval process to international suppliers requiring participation in environmental compliance surveys and classification of risk impact of goods or services supplied. |
Water Conservation Project at R&D Combustion Test Center | Reduce water consumption by replacing old style steam spargers on test furnace stacks to reduce steam usage when pulling draft on furnace during test monitoring. Install new control equipment on process steam boilers to maintain less steam pressure and lower steam temperature during hours of idle operation, thus reducing the amount of water and fuel usage of steam boilers. |
|
|
|
|
D.1 | Please briefly describe the activities that your facility conducted during the year to interact with the community on environmental issues and to report publicly on environmental performance.
|
| Our John Zink Institute continued offering of educational accredited combustion engineering courses, John Zink also continued to expand new partnerships with customer and their commuities to participate in air emission studies to help determine ways to improve air quality for our customers and their communities. John Zink held an open house celebration at our Tulsa Facility to honor our acheivements such as EPA Performance Track, OSHA VPP Star Site, ISO 14001, OHSAS 18001 and ISO 9001 certifications with community officials and neighbors.
|
D.2 | Please indicate which of the following methods your facility plans to use to make its Performance Track Annual Performance Report available to the public.
|
| Web Site
Open House
Meetings
Press Releases
|
|
| URL: http://www.johnzink.com |