Site Status & Updates

The Environmental Protection Agency on May 25, 2007 announced the deletion of 25,423 acres of the Rocky Flats site in Jefferson and Boulder Counties, CO from the National Priorities List. (NPL). This deletion reflects the completion of all response actions for the offsite and peripheral parcels and will allow the U.S. Department of Energy (DOE) to transfer part of the site to the U.S. Department of the Interior (DOI) for the U.S. Fish and Wildlife Service to manage as a National Wildlife Refuge.

Areas affected by the deletion include the 4,933-acre Peripheral Operable Unit and the 20,480-acre Operable Unit 3. The Peripheral Operable Unit (formerly known as the Buffer Zone) was part of the former DOE Rocky Flats nuclear weapons plant. That parcel will be transferred from DOE to DOI to become the wildlife refuge. Operable Unit 3 (also known as the Offsite Areas) consists of open space, residential development and agricultural lands. A 1997 Record of Decision for Operable Unit 3 and a 2006 Record of Decision for the Peripheral Operable Unit determined that all appropriate response actions under the Comprehensive Environmental Response, Compensation and Liability Act have been implemented in these areas, and that no further response action b responsible parties is appropriate.

The State of Colorado, through the Colorado Department of Public Health and Environment, concurs with the deletion. DOE will be responsible for all future response actions required at the area deleted if future site conditions warrant such actions.

The 1,308-acre Central Operable Unit at Rocky Flats is not being considered for deletion and will remain on the NPL.

About Rocky Flats

Beginning in 1952 and continuing for nearly 40 years, the U.S. government manufactured nuclear weapons components from plutonium, uranium, beryllium and stainless steel at Rocky Flats in Colorado.

Rocky Flats shut its operations in 1989 in response to alleged violations of environmental statutes that were made after a raid by the FBI and the EPA. In 1992, with the end of the "Cold War," the U.S. decided not to resume production of nuclear weapons parts at Rocky Flats.

The Rocky Flats site, which DOE renamed the Rocky Flats Environmental Technology Site, is located on 6,500 acres in Jefferson County, 16 miles northwest of downtown Denver. Approximately 300,000 people live within 10 miles of Rocky Flats.

Operators conducted all manufacturing activities in a 300-acre area at the center of the site, known as the Industrial Area. The surrounding property is referred to as the Buffer Zone.

At one time the site stored more than 14 tons of plutonium, which was the second-largest repository of the element in the U.S. A significant amount of the plutonium was in liquid form, contained in deteriorating piping systems. However, those liquids have been drained from the piping, stabilized, and shipped to a licensed repository.

Leaking storage drums, unlined disposal trenches, surface-water impoundments, leaky pipelines, leaky underground tanks, and two on-site landfills all contributed to the contamination of soils and ground water at the site.

Volatile organic compounds (VOCs) contaminated shallow ground water in the central section of the site. The radioactive elements plutonium, uranium and americium contaminated soil in the central and eastern portions of the site; the most contaminated soils were located on the eastern edge of the industrial area. The potential for radionuclides (radioactive particles) to become airborne during strong winds has been a concern as has the potential for plutonium in soils to be washed into the two streams that flow on either side of the Industrial Area.

DOE Rocky Flats Web site

Colorado Department of Public Health and the Environment Rocky Flats Program Web Site


Site Risk

Media Affected Contaminants Source of Contamination
Soils, surface water, ground water, air Plutonium, americium, uranium, volatile organic compounds Past production of nuclear weapons components left leaking storage drums, unlined disposal trenches, surface water impoundments, leaking pipelines and underground storage tanks, two landfills, and contaminated buildings.

Top of Page


Cleanup Progress

Rocky Flats Environmental Technology Site declared physical construction completion as of October 13, 2005

The site was cleaned up as an accelerated action through federal and state oversight, with DOE as the lead agency. Most of the activities at the site were completed under the terms of the Rocky Flats Cleanup Agreement signed by DOE, EPA and CDPHE in July 1996.

MAJOR ACCOMPLISHMENTS

Transfer to a National Wildlife Refuge

The Record of Decision was signed on September 29, 2006. The Peripheral Operable Unit (OU), which largely consists of the previous Buffer Zone, and OUT 3 (Offsite Areas) will be deleted from the National Priorities List (NPL). The deletion will follow responses to comments received during a 30-day public comment period solicited with a Federal Register notice and public notice of intent to delete those areas. The Central OU, largely the previous Industrial Area, will not be deleted from the NPL and will remain under DOE control for monitoring and maintenance.

After deletion, DOE will transfer the Peripheral OU to the Department of the Interior for management by the U.S. Fish and Wildlife Service as the Rocky Flats National Wildlife Refuge. The Rocky Flats National Wildlife Refuge Act of 2001 authorized the refuge.

The site provides habitat for many wildlife species, including the Preble's Meadow Jumping Mouse which is federally protected as a threatened species.


Community Involvement

EPA, CDPHE and DOE held stakeholder meetings and invited stakeholders to many site technical meetings to present cleanup plans and receive input on major remedial activities. DOE funded two stakeholder groups: the Citizens Advisory Board, a DOE Site Specific Advisory Board, and the Rocky Flats Coalition of Local Governments, A DOE reuse and local government organization. DOE now funds the Rocky Flats Stewardship Council, a local stakeholder organization involved in post-closure oversight.


Site Documents

Five-Year Review Annual Update PDF December 2007 (4 pp, 44K, About PDF )

Rocky Flats Plant 5-Year Review PDF September 2007 (171 pp, 7.4MB, About PDF)


Rocky Flats Plant Contacts

EPA

Mark Aguilar
EPA Rocky Flats Project Coordinator
U.S. EPA Region 8
1595 Wynkoop Street
Denver, Colorado 80202-1129
(303) 312-6251
or 1-800-227-8917 x 6251 (Reg. 8 only)
Email: aguilar.mark@epa.gov

John Dalton
EPA Community Involvement Coordinator
1595 Wynkoop Street
Denver, CO 80202-1129
(303) 312-6633
or 1-800-227-8917 x 6633 (Reg. 8 only)
Email: dalton.john@epa.gov

Colorado

Carl Spring

Rocky Flats Program Manager
Colorado Department of Public Health
and Environment (CDPHE)
4300 Cherry Creek Drive S.
Denver, CO 80246-1530
(303) 692-3358
Email: carl.spreng@state.co.us

Marion Galant
CDPHE Community Relations Specialist
4300 Cherry Creek Drive S.
Denver, CO 80246-1530
(303) 692-3304
email: marion.galant@state.co.us

View Documents at:

EPA Superfund Records Center
1595 Wynkoop Street
Denver, CO 80202-1129
(303) 312-6473
or 1-800-227-8917 ext. 6473

Colorado Department of Public Health
and Environment (CDPHE)
Records Center - Room B-215
4300 Cherry Creek Drive South
Denver, CO 80246-1530
(303) 692-3312

DOE Rocky Flats Web site

Colorado Department of Public Health and the Environment Rocky Flats Web Site


Local Navigation


Jump to main content.