Mid Year 2008 BRAC Program Snapshot



Base Realignment and Closure (BRAC) Information Summary

BRAC Federal Facilities by BRAC Round
Pie chart: BRAC 1 - 18% (19), BRAC 2 - 24% (26), BRAC 3 - 26% (28), BRAC  4 - 32% (34)

Top of page


NPL Status of BRAC Facilities

NPL Status Number of BRAC Facilities
Proposed
3
Final
34
Deleted
1
Soon to be Proposed
1
Non NPL
68
Total
107

Top of page


Current Site Work
Bar Graph Showing Current Site Work: Ongoing Removals – 22, Active TAGs – 6, Ongoing RI/FS Actions – 92, Ongoing RDs – 11, Ongoing RAs – 53, Ongoing O&M – 46

Top of page


Completed Site Work
Bar Graph Showing Completed Site Work: Removed Comps – 482, Decision Documents 664, RD 230, RA 277, OPS 45, 5 Year Reviews 67, Partial Deletions 4

Top of page


BRAC Federal Facility Site Cleanup Pipeline
Federal Facility Cleanup Pipeline: NPL Facilities – 107, Facilities with IAGs – 34, Active RABs/SSABs – 68, Final Remedy Selected – 25, All Construction Completed – 10, Deleted Facilities – 1

Notes: All data from 4/7/2008 CERCLIS 3. BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.

Top of page


Interagency Agreements

% of BRAC Federal Facilities with Completed IAGs
Federal Agencies that have not acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
Navy 9 35 25.7%
Army 11 40 27.5%
Air Force 12 29 41.4%
Dept. of Defense 0 1 0.0%
Federal Agencies that have acheived 100% of their IAGs/FFAs:
Agency # w/ IAG Total # Percent
DLA 2 2 100.0%

Top of page


Institutional Controls at BRAC Facilities

Bar Graph Showing Remedial and Removal Actions with ICs: Remedial Actions – 166, Removals – 8
Note: There are 47 BRAC Federal Facilities with Institutional Controls.

Top of page


Status of 5 Year Review Protectiveness Statements

Bar Graph Showing Post-Construction Completion Activity at BRAC Facilities: Protective – 15, Will be Protective by Remedy Complete – 5, Protective in the Short Term – 11, Not Protective – 1, Protectiveness Deferred – 4, Complete – 3
Note: In the second quarter of FY 2005, EPA implemented a change in the way 5 Year Review data is recorded.

Top of page


Environmental Indicators at Federal Facilities

EI Status for Final NPL BRAC Federal Facilities
(Total Facilities = 35)


Bar Graph Showing the EI Status for Final NPL Federal Facilities: Human Exposure Controlled – 30, Human Exposure Insufficient Data – 4, Human Exposure Not Controlled – 1, Groundwater Controlled – 20, Groundwater Insufficient Data - 7, Groundwater Not Controlled – 7, Groundwater Not a GW Site – 1
Note: 57% of Facilities have both Human Exposure and Groundwater controlled; 3% of Facilities have neither Human Exposure nor Groundwater controlled.

Top of page


SiteWide Ready for Anticipated Use

BRAC NPL Federal Facilities with SiteWide RAUs

Bar Graph Showing BRAC NPL Federal Facilities with SiteWide RAUs: FY 2008 – 8

Top of page


Notes:

  • Notes: All data from 4/7/2008 CERCLIS 3.
  • BRAC cleanup data includes both Superfund and RCRA activity at Superfund Federal Facilities.