PHMSA Gas Integrity Management
Time: 11/08/2008 05:28 PM

Frequently-Asked Question FAQ #152

FAQ-152: Consideration of all Applicable Threats in Prior Assessments

Go To FAQ#:

Question: Must an assessment completed prior to the effective date of the rule have considered all applicable threats in order to be treated as a baseline assessment?

Answer: Yes. The rule requires (192.921(e)) that an assessment conducted prior to December 17, 2002, must meet the baseline requirements in Subpart O if it is to be used as a baseline assessment. A key element of those requirements is that the assessment method be based on the threats faced. Section 192.921(a) requires that an operator must select the method, or methods, that are best suited to address the identified threats.

These Frequently Asked Questions (FAQs) are intended to clarify, explain, and promote better understanding of the pipeline integrity management rules. These FAQs are not substantive rules and do not create rights, assign duties, or impose new obligations not outlined in the existing integrity management regulations and standards. Requests for informal interpretations regarding the applicability of one or more of the pipeline integrity management rules to a specific situation may be submitted to PHMSA in accordance with 49 C.F.R. ยง 190.11.
DOT Website | PHMSA Website | Pipeline Safety Website | Feedback | Privacy Policy | FOIA