PHMSA Gas Integrity Management
Time: 11/08/2008 04:39 PM

Protocol Area D. DA Plan

Protocol:  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P 

D.01 ECDA Programmatic Requirements

If the operator elects to use ECDA, verify that the operator develops and implements an ECDA plan in accordance with §192.925.

[See Details...]

D.02 ECDA Pre-Assessment

Verify that the ECDA Pre-assessment process complies with ASME B31.8S-2004, Section 6.4 and NACE RP0502-2002 to (1) determine if ECDA is feasible for the pipeline to be evaluated, (2) identify ECDA regions and (3) select Indirect Inspection Tools. [§192.925(b)(1)]

[See Details...]

D.03 ECDA Indirect Examination

Verify that the ECDA Indirect Examination process complies with ASME B31.8S-2004, Section 6.4 and NACE RP0502-2002, Section 4 to identify and characterize the severity of coating fault indications, other anomalies, and areas at which corrosion activity may have occurred or may be occurring, and establish priorities for excavation. [�192.925(b)(2)]

[See Details...]

D.04 ECDA Direct Examination

Verify that the ECDA Direct Examination process complies with ASME B31.8S-2004, Section 6.4 and NACE RP0502-2002, Section 5 to collect data to assess corrosion activity and remediate defects discovered. [NACE RP0502-2002, Section 5.1.1 and §192.925(b)(3)]

[See Details...]

D.05 ECDA Post-Assessment

Verify that the ECDA Post assessment process complies with ASME B31.8S-2004, Section 6.4 and NACE RP0502-2002, Section 6, to (1) define reassessment intervals and (2) assess the overall effectiveness of the ECDA process. [§192.925(b)(4) and §192.939]

[See Details...]

D.06 Dry Gas ICDA Programmatic Requirements

If the operator elects to use ICDA, verify that the operator develops and implements an ICDA plan in accordance with §192.927.

[See Details...]

D.07 Dry Gas ICDA Pre-Assessment, Region Identification and Use of Model

For dry gas systems, verify that the operator gathers, integrates and analyzes data and information to accomplish pre-assessment objectives and identify ICDA Regions. [§192.927(c)(1), §192.927(c)(2), ASME B31.8S-2004, Section 6.4.2, ASME B31.8S-2004, Appendix A2 and ASME B31.8S-2004, Appendix B2]

[See Details...]

D.08 Dry Gas ICDA Direct Examination

For dry gas systems, verify that the operator (1) identifies locations where internal corrosion is most likely in each ICDA region and (2) performs direct examinations of those locations. [§192.927(b), 192.927(c)(3), ASME B31.8S-2004, Section 6.4 and ASME B31.8S-2004, Appendix B2]

[See Details...]

D.09 Dry Gas ICDA Post-Assessment

For dry gas systems, verify that the operator performs post-assessment evaluation of ICDA effectiveness and continued monitoring of covered segments where internal corrosion has been identified. [§192.927(c)(4)]

[See Details...]

D.10 Wet Gas ICDA Programmatic Requirements

If the operator elects to use ICDA to assess a covered segment operating with electrolyte present in the gas stream (wet gas), verify that the operator develops and implements an ICDA plan in accordance with §192.927 which addresses the following. [§192.927(b)]

[See Details...]

D.11 SCCDA Data Gathering and Evaluation

If the operator elects to use SCCDA, verify that the operator's SCCDA evaluation process complies with ASME B31.8S-2004, Appendix A3 in order to identify whether conditions for SCC of gas line pipe are present and to prioritize the covered segments for assessment. [§192.929(b)(1)]

[See Details...]

D.12 SCCDA Assessment, Examination and Threat Remediation

Verify that covered segments (for which conditions for SCC are identified) are assessed, examined, and the threat remediated. [§192.929(b)(2)]

[See Details...]

Explanation of Protocol Format

Each protocol element will have top-tier protocols that address the high level requirements. The regulatory requirement upon which the protocol is based is contained in brackets; e.g., [§192.905(a)]

Each top-tier protocol will have detailed "sub-tier" protocols which collectively lead the inspector to draw overall conclusions about compliance with the top-tier protocol. The regulatory requirement, upon which each sub-tier protocol is based, is also contained in brackets.

Notes on protocols:
Protocol:  A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P 