The "Content Last Revised" date represents the more recent
of these two conditions:
- The date of the original source for this CFR Section.
- The date of the Final Rule or Final Notice that revised this CFR
Section.
A blank date field indicates that no date was available on the
source documents used to build the affected CFR Part or Section.
|