EISs With Open Comment/Wait Period (by state)
57 documents were retrieved. These documents can be sorted by comment/wait period, agency or state by clicking on the column headers.
Other EIS listings
< Previous | Next > | ||||
Date | Agency | State | Document | Title | |
---|---|---|---|---|---|
11/26/2008 | AFS | CA | Draft EIS | Info | Tahoe National Forest Motorized Travel Management, Implementation, Sierra Nevada Mountains, Nevada, Placer, Plumas, Sierra and Yuba Counties, CA |
12/08/2008 | FHW | CA | Draft EIS | Info | Mid County Parkway Project, Construct a New Parkway between Interstate 15 (I-15) in the West and State Route 79 (SR-79) in the East, Funding and US Army COE Section 404 Permit, Riverside County, CA |
11/17/2008 | IBR | CA | Draft EIS | Info | South Coast Conduit/Upper Reach Reliability Project, Construction of a Second Water Pipeline for Improving Water Supply, US Army COE Section 10 and 404 Permits, Santa Barbara County, CA |
11/24/2008 | COE | CA | Final EIS | Info | Three Rivers Levee Improvement Authority, proposes construct and maintain the Feather River Levee Repair Project, Segment 2, Issuing 408 Permission and 404 Permit, Yuba County,CA |
12/01/2008 | FHW | CA | Final EIS | Info | Doyle Drive Project, South Access to the Golden Gate Bridge, Propose to Improve Seismic, Structural, and Traffic Safety, Presido of San Francisco, San Francisco County Transportation Authority, Marin and San Francisco Counties, CA |
11/17/2008 | FTA | CA | Second Final Supplement | Info | South Sacramento Corridor Phase 2, Improve Transit Service and Enhance Regional Connectivity, Funding, in the City and County Sacramento, CA |
11/17/2008 | BLM | CA | Final EIS | Info | Sunrise Powerlink Transmission Line Project, Proposed Land Use Plan Amendment, Construction and Operation of a New 91-mile 500 kilovolt (kV) Electric Transmission Line from Imperial Valley Substation (in Imperial Co. near the City of El Centro) to a New Central East Substation (in Central San Diego County) Imperial and San Diego Counties, CA |
12/08/2008 | COE | CA | Draft EIS | Info | San Pedro Waterfront Project, Proposed Specific Development Project and Associated Infrastructure Improvements on Approximately 400 Acres, Currently Operated by Los Angeles Harbor Department (LAHD), Located along the West Side of Los Angeles Harbor's Main Channel, from tthe Vincent Thomas Bridge to Cabrillo Beach, US Army Section 10 and 404 and Section 103 Marine Protection, Research, and Sanctuaries Act Permits, (MPRSA) City of Los Angeles, CA |
11/24/2008 | AFS | CA | Draft EIS | Info | Moonridge Animal Park Relocation Project, Application for a Special-Use-Permit to Construct and Operate a Wild Animal Park and Associated Facilities, Mountaintop Ranger District, San Bernardino National Forest, San Bernardino County, CA |
12/30/2008 | FHW | CO | Draft EIS | Info | North 1-25 Corridor, To Identify and Evaluate Multi-Modal Transportation Improvement along 61 miles from the Fort Collins - Wellington Area, Funding and US Army COE Section 404 Permit, Denver, CO |
11/17/2008 | AFS | CO | Draft EIS | Info | Hermosa Landscape Grazing Analysis Project, Proposes to Continue to Authorize Livestock Grazing Cascade Reservoir, Dutch Creek, Elbert Creek, Hope Creek South Fork, and Upper Hermosa Allotments, Columbine Ranger District, San Juan National Forest, LaPlata and San Juan Counties, CO |
11/24/2008 | IBR | CO | Draft EIS | Info | Southern Delivery System Project, Water Supply Development, Execution of up to 40-year Contracts for Use of Fryingpan-Arkansas Project Facilities, Special Use Permit, El Paso County, CO |
11/24/2008 | COE | CO | Draft EIS | Info | Fort Carson Grow the Army Stationing Decision, Constructing New Facilities to Support Additional Soldiers and their Families, Portions of El Paso, Pueblo and Fremont Counties, CO |
11/24/2008 | FAA | FL | Draft EIS | Info | Palm Beach International Airport Project, Construction and Operation of Proposed Airfield Improvements, Funding, Palm Beach County, FL |
11/17/2008 | UAF | FL | Final EIS | Info | Eglin Air Force Base Program, Base Realignment and Closure (BRAC) 2005 Decisions and Related Action, Implementation, FL |
12/19/2008 | COE | GA | Draft EIS | Info | Fort McPherson Project, Disposal and Reuse, Implementation, in City Limits of Atlanta, Fulton County, GA |
11/25/2008 | AFS | ID | Draft EIS | Info | Salmon-Challis National Forest (SCNF), Proposes Travel Planning and OHV Route Designation, Lemhi, Custer and Butte Counties, ID |
01/02/2009 | AFS | ID | Second Draft Supplement | Info | Southwest Idaho Ecogroup Land and Resource Management Plan, Provide Additional Information to Reanalyzes the Effects of Current and Proposed Management on Rock Mountain Bighorn Sheep Viability in the Payette National Forest 2003 FEIS, Boise National Forest, Payette National Forest and Sawtooth National Forest, Forest Plan Revision, Implementation, Several Counties, ID; Malhaur County, OR and Box Elder County, UT |
12/01/2008 | FHW | ID | Draft EIS | Info | I-90 Post Falls Access Improvements Project, Transportation Improve from Spokane Street Interchange through the State Highway 41 (SH-41) Interchange, Kootenai County, ID |
12/15/2008 | COE | LA | Draft EIS | Info | Mississippi River-Gulf Outlet (MRGO), Louisiana, and Lake Borgne Wetland Creation and Shoreline Protection Project, Proposes to Construct Shoreline Protection Features Along the Lake Borgne Shoreline to Restore and Nourish Wetlands, Lake Borgne, LA |
11/25/2008 | COE | LA | Draft Supplement | Info | Inner Harbor Navigation Canal (IHNC) Lock Replacement Project, Proposal for Relieving Navigation Traffic Congestion Associated with IHNC Lock, Located between the St. Claude Avenue and North Claibone Avenue Bridge, Orleans, LA |
01/02/2009 | FTA | MD | Draft EIS | Info | Red Line Corridor Transit Study, Alternatives Analysis, Implementation of a New East-West Transit Alignment through Baltimore, Baltimore County, MD |
12/01/2008 | NSA | MD | Draft EIS | Info | Fort George G. Meade Utilities Upgrade Project, Proposes to Construct and Operate (1) North Utility Plant (2) South Generator Facility and (3) Central Boiler Plant, Fort George M. Meade, MD |
01/14/2009 | FTA | MD | Draft EIS | Info | Purple Line Transit Project, Proposed 16-Mile Rapid Transit Line Extending from Bethesda in Montgomery County to New Carrollton in Prince George's County, MD |
11/17/2008 | FHW | MN | Draft EIS | Info | Trunk Highway 14 (US 14) Project, Proposed Construction from Interstate 35 to Trunk Highway 56, Funding, NPDES and US Army COE Section 404 Permits, Steele and Doge Counties, MN |
12/16/2008 | FHW | MS | Draft EIS | Info | MS-601 Transportation Project, Extension of MS-601 from I-10 Canal Interchange to Connect with US 49, Funding, Harrison and Stone Counties, MS |
11/17/2008 | AFS | MT | Draft EIS | Info | Ashland Ranger District Travel Management Project, Proposing to Designate Routes for Public Motorized Use, Ashland Ranger District, Custer National Forest, Rosebud and Power River Counties, MT |
12/12/2008 | NIH | MT | Draft EIS | Info | Rocky Mountain Laboratories (RML) Master Plan, Implementation, Hamilton, Ravalli County, MT |
12/08/2008 | NOA | Multi | Final EIS | Info | Amendment 16 to the Fishery Management Plan for the Snapper Grouper Fishery, Address Overfishing, Bycatch, Management Reference Points, and Allocations for Snapper Grouper Species, Implementation, South Atlantic Region |
12/15/2008 | COE | Multi | Draft EIS | Info | PROGRAMMATIC - Oyster Restoration in Chesapeake Bay Including the Use of a Native and/or Nonnative Oyster, Implementation, Chesapeake Bay, Md and VA |
< Previous | Next > | ||||