                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 264_STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, 
STORAGE, AND DISPOSAL FACILITIES--Table of Contents
 
                  Subpart B_General Facility Standards
 
Sec. 264.12  Required notices.

    (a)(1) The owner or operator of a facility that has arranged to 
receive hazardous waste from a foreign source must notify the Regional 
Administrator in writing at least four weeks in advance of the date the 
waste is expected to arrive at the facility. Notice of subsequent 
shipments of the same waste from the same foreign source is not 
required.
    (2) The owner or operator of a recovery facility that has arranged 
to receive hazardous waste subject to 40 CFR part 262, subpart H must 
provide a copy of the tracking document bearing all required signatures 
to the notifier, to the Office of Enforcement and Compliance Assurance, 
Office of Compliance, Enforcement Planning, Targeting and Data Division 
(2222A), Environmental Protection Agency, 1200 Pennsylvania Ave., NW., 
Washington, DC 20460; and to the competent authorities of all other 
concerned countries within three working days of receipt of the 
shipment. The original of the signed tracking document must be 
maintained at the facility for at least three years.
    (b) The owner or operator of a facility that receives hazardous 
waste from an off-site source (except where the owner or operator is 
also the generator) must inform the generator in writing that he has the 
appropriate permit(s) for, and will accept, the waste the generator is 
shipping. The owner or operator must keep a copy of this written notice 
as part of the operating record.
    (c) Before transferring ownership or operation of a facility during 
its operating life, or of a disposal facility during the post-closure 
care period, the owner or operator must notify the new owner or operator 
in writing of the requirements of this part and part 270 of this 
chapter.

[Comment: An owner's or operator's failure to notify the new owner or 
operator of the requirements of this part in no way relieves the new 
owner or operator of his obligation to comply with all applicable 
requirements.]

[45 FR 33221, May 19, 1980, as amended at 48 FR 14294, Apr. 1, 1983; 50 
FR 4514, Jan. 31, 1985; 61 FR 16315, Apr. 12, 1996]