[Code of Federal Regulations]
[Title 40, Volume 3]
[Revised as of July 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR52.679]

[Page 445-448]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 52_APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
--Table of Contents
 
                             Subpart N_Idaho
 
Sec.  52.679  Contents of Idaho State Implementation Plan.

  Implementation Plan for the Control of Air Pollution in the State of 
                                  Idaho

Chapter I--Introduction (submitted 1-15-80)
Chapter II--Administration (submitted 1-15-80)
Chapter III--Emission Inventory (submitted 1-15-80)
Chapter IV--Air Quality Monitoring (submitted 1-15-80, and 2-14-80)
Chapter V--Source Surveillance (submitted 1-15-80)
Chapter VI--Emergency Episode Plan (submitted 1-15-80)
Chapter VIII--Nonattainment Area Plans
    VIII-a--Silver Valley TSP Nonattainment Area Plan (submitted 1-15-
80): EPA effective 7-28-82.
    VIII-b--Lewiston TSP Nonattainment Plan (submitted 1-15-80, 12-4-80, 
and 2-5-81): EPA effective 7-28-82.
    VIII-c--Transportation Control Plan for carbon monoxide, Ada County 
(submitted 5-24-84, 1-3-85, 3-25-85, and 6-29-94): EPA effective 7-28-
82, 8-5-85, and 1-30-95.
    VIII-d--Pocatello TSP Nonattainment Plan (submitted 3-7-80, and 2-5-
81): EPA effective 7-28-82.
    VIII-e--Soda Springs TSP Nonattainment Plan (submitted 1-15-80): EPA 
effective 7-28-82.
    VIII-f--Pinehurst PM-10 Nonattainment Plan (4-14-92): EPA effective 
10-24-94.
    VIII-g--North Ada County PM10 Nonattainment Area Plan (submitted 11-
14-91, 12-30-94, and 7-13-95): EPA effective 7-29-96.
    VIII-h--Fort Hall PM-10 Nonattainment Area Plan (FIP): EPA effective 
9-22-00.
    VIII-i--Sandpoint PM10 Nonattainment Area Plan (submitted 8-16-96): 
EPA effective 8-26-02.
    VIII-j--North Ada County CO Limited Maintenance Plan (submitted 1-
17-02): EPA effective 11-27-02.
Chapter IX--Reserved
Chapter X--Plan for Maintenance of National Ambient Air Quality 
          Standards for Lead (submitted 2-3-84): EPA effective 6-4-84.

[[Page 446]]

Small Business Assistance Program (submitted 1-3-94): EPA effective 11-
          18-94.
Appendix A Legal Authority and other General Administrative Matters 
          (submitted 1-15-80)
Appendix A.2 Idaho Environmental Protection and Health Act, Idaho Code 
          Section 39-101 et seq. (submitted 3-15-01)
Appendix A.3 Idaho Administrative Procedures Act (IDAPA) Chapter 58, 
          Rules for the Control of Air Pollution in Idaho, previously 
          codified at IDAPA Chapter 39 (submitted 5-17-94, 5-11-95, 11-
          21-96, 2-28-97, 12-18-97, 4-9-98, 5-5-99, 12-5-00, and 5-30-
          02)

    EPA-approved rules which are incorporated by reference are listed in 
the table below:

------------------------------------------------------------------------
                                                                State
   Citation                        Title                      effective
                                                                date
------------------------------------------------------------------------
              IDAPA 58--Department of Environmental Quality
------------------------------------------------------------------------
        58.01.01--Rules for the Control of Air Pollution in Idaho
------------------------------------------------------------------------
001.            Title and Scope...........................        5/1/94
004.            Catchlines................................        5/1/94
005.            Definitions...............................        5/1/94
006.            General Definitions.......................        4/5/00
                                                                 3/20/97
                                                                  5/1/95
                                                                  5/1/94
007.            Definitions for the Purposes of Sections          4/5/00
                 200 Through 225 and 400 Through 461.            6/30/95
                                                                  5/1/95
                                                                  5/1/94
106.            Abbreviations.............................        5/1/94
107.            Incorporations by Reference (Except               7/1/97
                 subsection 03.).                                 5/1/94
121.            Compliance Requirements by Department.....        5/1/94
122.            Information Orders by the Department......        4/5/00
                                                                  5/1/94
123.            Certification of Documents................        5/1/94
124.            Truth, Accuracy and Completeness of               5/1/94
                 Documents.
125.            False Statements..........................       3/23/98
126.            Tampering.................................       3/23/98
127.            Format of Responses.......................        5/1/94
130.            Startup, Shutdown, Scheduled Maintenance,         4/5/00
                 Safety Measures, Upset and Breakdown.
131.            Excess Emissions..........................        4/5/00
132.            Correction of Condition...................        4/5/00
133.            Startup, Shutdown and Scheduled                   4/5/00
                 Maintenance Requirements.                       3/20/97
134.            Upset, Breakdown, and Safety Requirements.        4/5/00
                                                                 3/20/97
135.            Excess Emission Reports...................        4/5/00
                                                                 3/20/97
136.            Excess Emission Records...................        4/5/00
                                                                 3/23/98
                                                                 3/20/97
155.            Circumvention.............................        4/5/00
156.            Total Compliance..........................        5/1/94
157.            Test Methods and Procedures...............        4/5/00
160.            Provisions Governing Specific Activities          4/5/00
                 and Conditions.
162.            Modifying Physical Conditions.............        5/1/94
163.            Source Density............................        5/1/94
164.            Polychlorinated Biphenyls (PCBs)..........        5/1/94
200.            Procedures and Requirements for Permits to        4/5/00
                 Construct.
201.            Permit to Construct Required..............       3/30/01
202.            Application Procedures....................        4/5/00
                                                                  5/1/94
203.            Permit Requirements for New and Modified          5/1/94
                 Stationary Sources (Except subsection
                 203.03).
204.            Permit Requirements for New Major                3/30/01
                 Facilities or Major Modifications in             4/5/00
                 Nonattainment Areas.                             5/1/94
205.            Permit Requirements for New Major                 4/5/00
                 Facilities or Major Modifications in             5/1/94
                 Attainment or Unclassifiable Areas.
206.            Optional Offsets for Permits to Construct.       6/30/95
207.            Requirements for Emission Reduction Credit        5/1/94
208.            Demonstration of Net Air Quality Benefit..        4/5/00
                                                                  5/1/94

[[Page 447]]


209.            Procedures for Issuing Permits............        4/5/00
                                                                 3/19/99
                                                                 3/23/98
                                                                  5/1/94
211.            Conditions for Permits to Construct.......        5/1/94
212.            Obligation to Comply......................        5/1/94
213.            Pre-permit Construction...................        4/5/00
                                                                 3/23/98
220.            General Exemption Criteria for Permit to          4/5/00
                 Construct Exemptions.
221.            Category I Exemption......................        4/5/00
222.            Category II Exemption (Except subsection          4/5/00
                 222.03.).                                        7/1/97
                                                                  5/1/94
400.            Procedures and Requirements for Tier II           5/1/94
                 Operating Permits.
401.            Tier II Operating Permit (Except                  4/5/00
                 subsections 401.01.a and 401.04).               3/19/99
                                                                  5/1/94
402.            Application Procedures....................        4/5/00
                                                                  5/1/94
403.            Permit Requirements for Tier II Sources...        5/1/94
404.            Procedures for Issuing Permits............        4/5/00
                                                                  5/1/94
405.            Conditions for Tier II Operating Permits..        5/1/94
406.            Obligation to Comply......................        5/1/94
460.            Requirements for Emission Reduction Credit        4/5/00
                                                                  5/1/94
461.            Requirements for Banking Emission                 4/5/00
                 Reduction Credits (ERC's).                       5/1/94
470.            Permit Application Fees for Tier II               3/7/95
                 Permits.
500.            Registration Procedures and Requirements          5/1/94
                 for Portable Equipment.
510.            Stack Heights and Dispersion Techniques...        5/1/94
511.            Applicability.............................        4/5/00
512.            Definitions...............................        4/5/00
                                                                  5/1/94
513.            Requirements..............................        4/5/00
514.            Opportunity for Public Hearing............        5/1/94
515.            Approval of Field Studies and Fluid Models        5/1/94
516.            No Restriction on Actual Stack Height.....        5/1/94
550.            Air Pollution Emergency Rule..............        5/1/94
551.            Episode Criteria..........................        5/1/94
552.            Stages....................................       3/15/02
                                                                  5/1/94
553.            Effect of Stages..........................       3/15/02
556.            Criteria for Defining Levels Within Stages       3/15/02
                                                                  4/5/00
557.            Public Notification.......................        5/1/94
558.            Information to Be Given...................       3/15/02
                                                                  5/1/94
559.            Manner and Frequency of Notification......        5/1/94
560.            Notification to Sources...................        4/5/00
561.            General Rules.............................       3/15/02
                                                                  4/5/00
                                                                  5/1/94
562.            Specific Emergency Episode Abatement Plans        5/1/94
                 for Point Sources.
563.            Transportation Conformity.................       3/30/01
564.            Incorporation by Reference................       3/30/01
565.            Abbreviations.............................       3/30/01
566.            Definitions for the Purpose of Sections          3/30/01
                 563 Through 574 and 582.
567.            Agencies Affected by Consultation.........       3/30/01
568.            ICC Member Roles in Consultation..........       3/30/01
569.            ICC Member Responsibilities in                   3/30/01
                 Consultation.
570.            General Consultation Process..............       3/30/01
571.            Consultation Procedures...................       3/30/01
572.            Final Conformity Determinations by USDOT..       3/30/01
573.            Resolving Conflicts.......................       3/30/01
574.            Public Consultation Procedures............       3/30/01
575.            Air Quality Standards and Area                    4/5/00
                 Classification.
576.            General Provisions for Ambient Air Quality        5/1/94
                 Standards.
577.            Ambient Air Quality Standards for Specific        5/1/94
                 Air Pollutants (Except subsection 577.06).
578.            Designation of Attainment, Unclassifiable,        5/1/94
                 and Nonattainment Areas.
579.            Baselines for Prevention of Significant           4/5/00
                 Deterioration.                                   5/1/94

[[Page 448]]


580.            Classification of Prevention of                   4/5/00
                 Significant Deterioration Areas.                 5/1/94
581.            Prevention of Significant Deterioration           4/5/00
                 (PSD) Increments.                                7/1/97
                                                                  5/1/94
582.            Interim Conformity Provisions for Northern       3/30/01
                 Ada County Former Nonattainment Area for
                 PM-10.
600.            Rules for Control of Open Burning.........       3/19/99
601.            Fire Permits, Hazardous Materials and             5/1/94
                 Liability.
602.            Nonpreemption of Other Jurisdictions......        5/1/94
603.            General Restrictions......................        5/1/94
604.            Alternatives to Open Burning..............        5/1/94
606.            Categories of Allowable Burning...........        5/1/94
607.            Recreational and Warming Fires............        5/1/94
608.            Weed Control Fires........................        5/1/94
609.            Training Fires............................        5/1/94
610.            Industrial Flares.........................        5/1/94
611.            Residential Solid Waste Disposal Fires....        5/1/94
612.            Landfill Disposal Site Fires..............       3/19/99
613.            Orchard Fires.............................        4/5/00
                                                                  5/1/94
614.            Prescribed Burning........................        5/1/94
615.            Dangerous Material Fires..................        5/1/94
616.            Infectious Waste Burning..................        5/1/94
625.            Visible Emissions.........................        4/5/00
                                                                  5/1/94
626.            General Restrictions on Visible Emissions         4/5/00
                 from Wigwam Burners.
650.            Rules for Control of Fugitive Dust........        5/1/94
651.            General Rules.............................        5/1/94
675.            Fuel Burning Equipment--Particulate Matter        4/5/00
676.            Standards for New Sources.................        5/1/94
677.            Standards for Minor and Existing Sources..        5/1/94
678.            Combinations of Fuels.....................        5/1/94
679.            Averaging Period..........................        4/5/00
                                                                  5/1/94
680.            Altitude Correction.......................        5/1/94
681.            Test Methods and Procedures...............        4/5/00
700.            Particulate Matter--Process Weight                4/5/00
                 Limitations.
701.            Particulate Matter--New Equipment Process         4/5/00
                 Weight Limitations.
702.            Particulate Matter--Existing Equipment            4/5/00
                 Process Weight Limitations.                      5/1/94
703.            Particulate Matter--Other Processes.......        4/5/00
725.            Rules for Sulfur Content of Fuels.........        4/5/00
726.            Definitions as Used in Sections 727               5/1/94
                 Through 729.
727.            Residual Fuel Oils........................        5/1/94
728.            Distillate Fuel Oil.......................        5/1/94
729.            Coal......................................        5/1/94
785.            Rules for Control of Incinerators.........        5/1/94
786.            Emission Limits...........................        4/5/00
787.            Exceptions................................       3/23/98
805.            Rules for Control of Hot-mix Asphalt              5/1/94
                 Plants.
806.            Emission Limits...........................        5/1/94
807.            Multiple Stacks...........................        5/1/94
808.            Fugitive Dust Control.....................        5/1/94
815.            Rules for Control of Kraft Pulping Mills..        5/1/94
816.            Statement of Policy.......................        5/1/94
817.            General Rules.............................        5/1/94
821.            Recovery Furnace Particulate Standards....        5/1/94
822.            Lime Kiln Standards.......................        5/1/94
823.            Smelt Tank Standards......................        5/1/94
824.            Monitoring and Reporting (Except                  4/5/00
                 subsection 824.01).                              5/1/94
825.            Special Studies...........................        5/1/94
826.            Exceptions................................        5/1/94
845.            Rules for Control of Sulfur Oxide                 5/1/94
                 Emissions from Sulfuric Acid Plants.
846.            Emission Limits...........................        4/5/00
847.            Monitoring and Testing....................        4/5/00
848.            Compliance Schedule.......................        5/1/94
------------------------------------------------------------------------


[68 FR 2222, Jan. 16, 2003]

[[Page 449]]