Sec. 292.67  Operating plan approval--outstanding mineral rights.

    (a) Upon receipt of an operating plan, the authorized officer must 
review the information related to the ownership of the outstanding 
mineral rights and notify the operator that:
    (1) Sufficient information on ownership of the outstanding mineral 
rights has been provided; or
    (2) Sufficient information on ownership of outstanding mineral 
rights has not been provided, including an explanation of the specific 
information that still needs to be provided, and that no further action 
on the plan of operations will be taken until the authorized officer's 
receipt of the specified information.
    (b) If the review shows outstanding mineral rights have not been 
verified, the authorized officer must notify the operator in writing 
that outstanding mineral rights have not been verified, explain the 
reasons for such a finding, and that the proposed mineral operation 
cannot be conducted.
    (c) If the review shows that outstanding mineral rights have been 
verified, the authorized officer must notify the operator in writing 
that outstanding mineral rights have been verified and that review of 
the proposed operating plan will proceed.
    (d) The authorized officer shall review the operating plan to 
determine if all of the following criteria are met:
    (1) The operating plan is consistent with the rights granted by the 
deed;
    (2) The operating plan is consistent with the Six Rivers National 
Forest Land and Resource Management Plan; and
    (3) The operating plan uses only so much of the surface as is 
necessary for the proposed mineral operations.
    (e) Upon completion of the review of the operating plan, the 
authorized officer shall notify the operator in writing of one of the 
following:
    (1) The operating plan meets all of the criteria of paragraphs 
(d)(1) through (d)(3) of this section and, therefore, is approved;
    (2) The operating plan does not meet one or more of the criteria in 
paragraphs (d)(1) through (d)(3) of this section. Where feasible, the 
authorized officer may indicate changes to the operating plan that would 
satisfy the criteria in paragraphs (d)(1) through (d)(3) of this section 
and, thus, if accepted by the operator, would result in approval of the 
operating plan.
    (f) To conduct mineral operations beyond those described in an 
approved operating plan, the owner or lessee must submit, in writing, an 
amended operating plan to the authorized officer at the earliest 
practicable date. New operations covered by the proposed amendment may 
not begin until the authorized officer has reviewed and responded in 
writing to the proposed amendment. The authorized officer shall review a 
proposed amendment of an approved operating plan to determine that the 
criteria in paragraphs (d)(1) through (d)(3) of this section are met.