Jump to main content.


Federal Register Notice

40247 - 40252 Federal Register / Vol. 63, No. 144 / Tuesday, July 28, 1998 / Proposed Rules

horizontal navy line

40247 - 40252 Federal Register / Vol. 63, No. 144 / Tuesday, July 28, 1998 / Proposed Rules

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 300
[FRL-6131-1]

National Priorities List for Uncontrolled Hazardous Waste Sites, Proposed Rule No. 25

AGENCY: Environmental Protection Agency.
ACTION:  Proposed rule.

SUMMARY:

The Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA" or "the Act"), requires that the National Oil and Hazardous Substances Pollution Contingency Plan ("NCP") include a list of national priorities among the known releases or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The National Priorities List ("NPL") constitutes this list. The NPL is intended primarily to guide the Environmental Protection Agency ("EPA" or "the Agency") in determining which sites warrant further investigation to assess the nature and extent of public health and environmental risks associated with the site and to determine what CERCLA-financed remedial action(s), if any, may be appropriate.

This rule proposes to add 14 new sites to the NPL, 11 to the General Superfund section and 3 to the Federal facilities section.

DATES

Comments regarding any of these proposed listings must be submitted (postmarked) on or before September 28, 1998, EPA has changed its policy and will normally no longer respond to late comments.

[Return to Table of Contents]

ADDRESSES:

By Postal Mail: Mail original and three copies of comments (no facsimiles or tapes) to:

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office (Mail Code 5201G)
401 M Street, SW
Washington, DC 20460
703/603-9232

By Express Mail: Send original and three copies of comments (no facsimiles or tapes) to:

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office
1235 Jefferson Davis Highway
Crystal Gateway #1, First Floor
Arlington, VA 22202

By E-Mail: Comments in ASCII format only may be mailed directly to:

superfund.docket@epa.gov.

E-mailed comments must be followed up by an original and three copies sent by mail or Federal Express.

For additional Docket addresses and further details on their contents, see Section II, "Public Review/Public Comment", of the "SUPPLEMENTARY INFORMATION" portion of this preamble.

FOR FURTHER INFORMATION CONTACT:

Terry Keidan
phone (703) 603-8852
State, Tribal and Site Identification Center
Office of Superfund Remediation Technology Innovation (Mail Code 5204G)
U.S. Environmental Protection Agency
401 M Street, SW
Washington, DC 20460
or the Superfund Hotline, Phone (800) 424-9346 or (703) 412-9810 in the Washington, DC, metropolitan area.

SUPPLEMENTARY INFORMATION:

Contents

I. Background
What are CERCLA and SARA?
What is the NCP?
What is the National Priorities List (NPL)?
How are sites listed on the NPL?
What happens to sites on the NPL?
How are site boundaries defined?
How are sites removed from the NPL?
Can portions of sites be deleted from the NPL as they are cleaned up?
What is the Construction Completion List (CCL)?
II. Public Review/Public Comment
Can I review the documents relevant to this proposed rule?
How do I access the documents?
What documents are available for public review at the Headquarters docket?
What documents are available for public review at the Regional dockets?
How do I submit my comments?
What happens to my comments?
What should I consider when preparing my comments?
Can I submit comments after the public comment period is over?
Can I view public comments submitted by others?
Can I submit comments regarding sites not currently proposed to the NPL?
III. Contents of This Proposed Rule
Proposed Additions to the NPL
Status of the NPL
Withdrawal of 3 Sites from Proposal to the NPL
IV. Executive Order 12866
What is Executive Order 12866?
Is this proposed rule subject to Executive Order 12866 review?
V. Unfunded Mandates
What is the Unfunded Mandates Reform Act (UMRA)?
Does UMRA apply to this proposed rule?
VI. Effect on Small Businesses
What is the Regulatory Flexibility Act?
Does the Regulatory Flexibility Act apply to this proposed rule?
VII. National Technology and Advancement Act
What is the National Technology and Advancement Act?
Does the National Technology and Advancement Act apply to this proposed rule?
VIII. Executive Order 13045
What is Executive Order 13045?
Does Executive Order 13045 apply to this proposed rule?
IX. Paperwork Reduction Act
What is the Paperwork Reduction Act?
Does the Paperwork Reduction Act apply to this proposed rule?
X. Executive Order 12875
What is Executive Order 12875 and is it applicable to this proposed rule?

[Return to Table of Contents]

I. Background

What Are CERCLA and SARA?

In 1980, Congress enacted the Comprehensive Environmental Response, Compensation, and Liability Act, 42 U.S.C. 9601-9675 ("CERCLA" or "the Act"), in response to the dangers of uncontrolled releases of hazardous substances. CERCLA was amended on October 17, 1986, by the Superfund Amendments and Reauthorization Act ("SARA"), Public Law 99-499, 100 Stat. 1613 et seq.

What Is the NCP?

To implement CERCLA, EPA promulgated the revised National Oil and Hazardous Substances Pollution Contingency Plan ("NCP"), 40 CFR Part 300, on July 16, 1982 (47 FR 31180), pursuant to CERCLA section 105 and Executive Order 12316 (46 FR 42237, August 20, 1981). The NCP sets guidelines and procedures for responding to releases and threatened releases of hazardous substances, pollutants, or contaminants under CERCLA. EPA has revised the NCP on several occasions. The most recent comprehensive revision was on March 8, 1990 (55 FR 8666).

As required under Section 105(a)(8)(A) of CERCLA, the NCP also includes "criteria for determining priorities among releases or threatened releases throughout the United States for the purpose of taking remedial action and, to the extent practicable, taking into account the potential urgency of such action for the purpose of taking removal action." ("Removal" actions are defined broadly and include a wide range of actions taken to study, clean up, prevent or otherwise address releases and threatened releases 42 USC 9601(23).)

What Is the National Priorities List (NPL)?

The NPL is a list of national priorities among the known or threatened releases of hazardous substances, pollutants, or contaminants throughout the United States. The list, which is Appendix B of the NCP (40 CFR part 300), was required under section 105(a)(8)(B) of CERCLA, as amended by SARA. Section 105(a)(8)(B) defines the NPL as a list of "releases" and the highest priority "facilities" and requires that the NPL be revised at least annually. The NPL is intended primarily to guide EPA in determining which sites warrant further investigation to assess the nature and extent of public health and environmental risks associated with a release of hazardous substances. However, the NPL is only of limited significance, as it does not assign liability to any party or to the owner of any specific property. Neither does placing a site on the NPL mean that any remedial or removal action necessarily need be taken. See Report of the Senate Committee on Environment and Public Works, Senate Rep. No. 96-848, 96th Cong., 2d Sess. 60 (1980), 48 FR 40659 (September 8, 1983).

The NPL includes two sections, one of sites that are evaluated and cleaned up by EPA (the "General Superfund Section"), and one of sites being addressed generally by other Federal agencies (the "Federal Facilities Section"). Under Executive Order 12580 (52 FR 2923, January 29, 1987) and CERCLA section 120, each Federal agency is responsible for carrying out most response actions at facilities under its own jurisdiction, custody, or control, although EPA is responsible for preparing an HRS score and determining whether the facility is placed on the NPL. EPA generally is not the lead agency at Federal Facilities Section sites, and its role at such sites is accordingly less extensive than at other sites.

How Are Sites Listed on the NPL?

There are three mechanisms for placing sites on the NPL for possible remedial action (see 40 CFR 300.425(c) of the NCP):

  1. A site may be included on the NPL if it scores sufficiently high on the Hazard Ranking System ("HRS"), which EPA promulgated as Appendix A of the NCP (40 CFR part 300). The HRS serves as a screening device to evaluate the relative potential of uncontrolled hazardous substances to pose a threat to human health or the environment. On December 14, 1990 (55 FR 51532), EPA promulgated revisions to the HRS partly in response to CERCLA section 105(c), added by SARA. The revised HRS evaluates four pathways: Ground water, surface water, soil exposure, and air. As a matter of Agency policy, those sites that score 28.50 or greater on the HRS are eligible for the NPL.

  2. Each State may designate a single site as its top priority to be listed on the NPL, regardless of the HRS score. This mechanism, provided by the NCP at 40 CFR 300.425(c)(2) requires that, to the extent practicable, the NPL include within the 100 highest priorities, one facility designated by each State representing the greatest danger to public health, welfare, or the environment among known facilities in the State (see 42 U.S.C. 9605(a)(8)(B)).

  3. The third mechanism for listing, included in the NCP at 40 CFR 300.425(c)(3), allows certain sites to be listed regardless of their HRS score, if all of the following conditions are met:

    • The Agency for Toxic Substances and Disease Registry (ATSDR) of the U.S. Public Health Service has issued a health advisory that recommends dissociation of individuals from the release.

    • EPA determines that the release poses a significant threat to public health.

    • EPA anticipates that it will be more cost-effective to use its remedial authority than to use its removal authority to respond to the release.

EPA promulgated an original NPL of 406 sites on September 8, 1983 (48 FR 40658). The NPL has been expanded since then, most recently on March 6, 1998 (63 FR 11331).

What Happens to Sites on the NPL?

A site may undergo remedial action financed by the Trust Fund established under CERCLA (commonly referred to as the "Superfund") only after it is placed on the NPL, as provided in the NCP at 40 CFR 300.425(b)(1). ("Remedial actions" are those "consistent with permanent remedy, taken instead of or in addition to removal actions. * * * 42 U.S.C. 9601(24).) However, under 40 CFR 300.425(b)(2) placing a site on the NPL "does not imply that monies will be expended." EPA may pursue other appropriate authorities to remedy the releases, including enforcement action under CERCLA and other laws.

How Are Site Boundaries Defined?

The NPL does not describe releases in precise geographical terms; it would be neither feasible nor consistent with the limited purpose of the NPL (to identify releases that are priorities for further evaluation), for it to do so.

Although a CERCLA "facility"is broadly defined to include any area where a hazardous substance release has "come to be located" (CERCLA section 101(9)), the listing process itself is not intended to define or reflect the boundaries of such facilities or releases. Of course, HRS data (if the HRS is used to list a site) upon which the NPL placement was based will, to some extent, describe the release(s) at issue. That is, the NPL site would include all releases evaluated as part of that HRS analysis.

When a site is listed, to describe the relevant release(s) the approach generally used is to delineate a geographical area (usually the area within an installation or plant boundaries) and identify the site by reference to that area. As a legal matter, the site is not coextensive with that area, and the boundaries of the installation or plant are not the "boundaries" of the site. Rather, the site consists of all contaminated areas within the area used to identify the site, as well as any other location to which contamination from that area has come to be located, or from which that contamination came.

In other words, while geographic terms are often used to designate the site (e.g., the "Jones Co. plant site") in terms of the property owned by a particular party, the site properly understood is not limited to that property (e.g., it may extend beyond the property due to contaminant migration), and conversely may not occupy the full extent of the property (e.g., where there are uncontaminated parts of the identified property, they may not be, strictly speaking, part of the "site"). The "site" is thus neither equal to nor confined by the boundaries of any specific property that may give the site its name, and the name itself should not be read to imply that this site is coextensive with the entire area within the property boundary of the installation or plant. The precise nature and extent of the site are typically not known at the time of listing. Also, the site name is merely used to help identify the geographic location of the contamination. For example, the "Jones Co. plant site," does not imply that the Jones company is responsible for the contamination located on the plant site.

EPA regulations provide that the "nature and extent of the threat presented by a release" will be determined by a Remedial Investigation/Feasibility Study ("RI/FS") as more information is developed on site contamination (40 CFR 300.430(d)). During the RI/FS process, the release may be found to be larger or smaller than was originally thought, as more is learned about the source(s) and the migration of the contamination. However, this inquiry focuses on an evaluation of the threat posed; the boundaries of the release need not be exactly defined. Moreover, it generally is impossible to discover the full extent of where the contamination "has come to be located" before all necessary studies and remedial work are completed at a site. Indeed, the boundaries of the contamination can be expected to change over time. Thus, in most cases, it may be impossible to describe the boundaries of a release with absolute certainty.

Further, as noted above, NPL listing does not assign liability to any party or to the owner of any specific property. Thus, if a party does not believe it is liable for releases on discrete parcels of property, supporting information can be submitted to the Agency at any time after a party receives notice it is a potentially responsible party.

For these reasons, the NPL need not be amended as further research reveals more information about the location of the contamination or release.

How Are Sites Removed From the NPL?

EPA may delete sites from the NPL where no further response is appropriate under Superfund, as explained in the NCP at 40 CFR 300.425(e). This section also provides that EPA shall consult with states on proposed deletions and shall consider whether any of the following criteria have been met:

  1. Responsible parties or other persons have implemented all appropriate response actions required;

  2. All appropriate Superfund-financed response has been implemented and no further response action is required; or

  3. The remedial investigation has shown the release poses no significant threat to public health or the environment, and taking of remedial measures is not appropriate.

To date, the Agency has deleted 175 sites from the NPL.

Can Portions of Sites Be Deleted From the NPL as They Are Cleaned Up?

In November 1995, EPA initiated a new policy to delete portions of NPL sites where cleanup is complete (60 FR 55465, November 1, 1995). Total site cleanup may take many years, while portions of the site may have been cleaned up and available for productive use. As of July 1998, EPA has deleted portions of 11 sites.

What Is the Construction Completion List (CCL)?

EPA also has developed an NPL construction completion list ("CCL") to simplify its system of categorizing sites and to better communicate the successful completion of cleanup activities (58 FR 12142, March 2, 1993). Inclusion of a site on the CCL has no legal significance.

Sites qualify for the CCL when:

  1. Any necessary physical construction is complete, whether or not final cleanup levels or other requirements have been achieved;

  2. EPA has determined that the response action should be limited to measures that do not involve construction (e.g., institutional controls); or

  3. The site qualifies for deletion from the NPL.

In addition to the 166 sites that have been deleted from the NPL because they have been cleaned up (9 sites have been deleted based on deferral to other authorities and are not considered cleaned up), an additional 350 sites are also on the NPL CCL. Thus, as of July 1998, the CCL consists of 516 sites.

[Return to Table of Contents]

II. Public Review/Public Comment

Can I Review the Documents Relevant to This Proposed Rule?

Yes, the documents that form the basis for EPA's evaluation and scoring of sites in this rule are contained in dockets located both at EPA Headquarters in Washington, D.C. and in the appropriate Regional offices.

How Do I Access the Documents?

You may view the documents, by appointment only, in the Headquarters or the appropriate Regional docket after the appearance of this proposed rule. The hours of operation for the Headquarters docket are from 9:00 a.m. to 4:00 p.m., Monday through Friday excluding Federal holidays. Please contact individual Regional dockets for hours.

You may also request copies from EPA Headquarters or the appropriate Regional docket. An informal request, rather than a formal written request under the Freedom of Information Act, should be the ordinary procedure for obtaining copies of any of these documents.

Following is the contact information for the EPA Headquarters docket (see "How do I submit my comments?" section below for Regional contacts):

Docket Coordinator
Headquarters, U.S. EPA
CERCLA Docket Office
Crystal Gateway #1, 1st Floor
1235 Jefferson Davis Highway
Arlington, VA 22202
703/603-9232

(Please note this is a visiting address only. Mail comments to EPA Headquarters as detailed at the beginning of this preamble, or contact Regional offices as detailed in the "How do I submit my comments?" section below.)

What Documents Are Available for Public Review at the Headquarters Docket?

The Headquarters docket for this rule contains: HRS score sheets for each proposed site; a Documentation Record for each site describing the information used to compute the score; information for any site affected by particular statutory requirements or EPA listing policies; and a list of documents referenced in the Documentation Record.

The Headquarters docket also contains an "Additional Information" document which provides a general discussion of the statutory requirements affecting NPL listing, the purpose and implementation of the NPL, and the economic impacts of NPL listing.

What Documents Are Available for Public Review at Regional Dockets?

Each Regional docket for this rule contains all of the information in the Headquarters docket for sites in that Region, plus, the actual reference documents containing the data principally relied upon and cited by EPA in calculating or evaluating the HRS scores for sites in that Region. These reference documents are available only in the Regional dockets.

How Do I Submit My Comments?

Comments must be submitted to EPA Headquarters as detailed at the beginning of this preamble. Regional offices may be reached at the following:

Jim Kyed
Region 1 (CT, ME, MA, NH, RI, VT)
U.S. EPA Waste Management Records Center, HRC-CAN-7
J.F. Kennedy Federal Building
Boston, MA 02203-2211
617/573-9656

Ben Conetta
Region 2 (NJ, NY, PR, VI)
U.S. EPA
290 Broadway
New York, NY 10007-1866
212/637-4435

Dawn Shellenberger
Region 3 (DE, DC, MD, PA, VA, WV)
U.S. EPA Library, 3rd Floor, Mail Code: 3PM52
841 Chestnut Building
9th & Chestnut Streets
Philadelphia, PA 19107
215/566-5364

after July 30 contact:

Kevin Wood
U.S. EPA Region 3
1650 Arch Street, Mail Code: 3HS33
Philadelphpia, PA 19103
215/814-3303

Sherrly Decker
Region 4 (AL, FL, GA, KY, MS, NC, SC, TN)
U.S. EPA
100 Alabama Street, SW
Atlanta, GA 30303
404/562-8190

Region 5 (IL, IN, MI, MN, OH, WI)
U.S. EPA, Records Center, Waste Management Division 7-J
Metcalfe Federal Building
77 West Jackson Boulevard
Chicago, IL 60604
312/886-7570

Brenda Cook
Region 6 (AR, LA, NM, OK, TX)
U.S. EPA, Mail Code 6SF-RA
1445 Ross Avenue
Dallas, TX 75202-2733
214/655-7436

Carole Long
Region 7 (IA, KS, MO, NE)
U.S. EPA
726 Minnesota Avenue
Kansas City, KS 66101
913/551-7224

David Williams,
Region 8 (CO, MT, ND, SD, UT, WY)
U.S. EPA
999 18th Street, Suite 500
Denver, CO 80202-2466
303/312-6757

Carolyn Douglas
Region 9 (AZ, CA, HI, NV, AS, GU)
U.S. EPA
75 Hawthorne Street
San Francisco, CA 94105
415/744-2343

David Bennett
Region 10 (AK, ID, OR, WA)
U.S. EPA, 11th Floor, Mail Stop ECL-115
1200 6th Avenue
Seattle, WA 98101
206/553-2103

What Happens to My Comments?

EPA considers all comments received during the comment period. Significant comments will be addressed in a support document that EPA will publish concurrently with the Federal Register document if, and when, the site is listed on the NPL.

What Should I Consider When Preparing My Comments?

Comments that include complex or voluminous reports, or materials prepared for purposes other than HRS scoring, should point out the specific information that EPA should consider and how it affects individual HRS factor values or other listing criteria (Northside Sanitary Landfill v. Thomas, 849 F.2d 1516 (D.C. Cir. 1988)). EPA will not address voluminous comments that are not specifically cited by page number and referenced to the HRS or other listing criteria. EPA will not address comments unless they indicate which component of the HRS documentation record or what particular point in EPA's stated eligibility criteria is at issue.

Can I Submit Comments After the Public Comment Period Is Over?

EPA has changed its policy and will normally no longer respond to late comments. EPA can only guarantee that it will consider those comments postmarked by the close of the formal comment period. EPA has a policy of not delaying a final listing decision solely to accommodate consideration of late comments.

Can I View Public Comments Submitted by Others?

During the comment period, comments are placed in the Headquarters docket and are available to the public on an " as received" basis. A complete set of comments will be available for viewing in the Regional docket approximately one week after the formal comment period closes.

Can I Submit Comments Regarding Sites Not Currently Proposed to the NPL?

In certain instances, interested parties have written to EPA concerning sites which were not at that time proposed to the NPL. If those sites are later proposed to the NPL, parties should review their earlier concerns and, if still appropriate, resubmit those concerns for consideration during the formal comment period. Site-specific correspondence received prior to the period of formal proposal and comment will not generally be included in the docket.

[Return to Table of Contents]

III. Contents of This Proposed Rule

Proposed Additions to the NPL

Table 1 identifies the 11 sites in the General Superfund section being proposed to the NPL in this rule. Table 2 identifies the 3 sites in the Federal Facilities section being proposed to the NPL in this rule. These tables follow this preamble. All sites are proposed based on HRS scores of 28.50 or above. The sites in Table 1 and Table 2 are listed alphabetically by State, for ease of identification, with group number identified to provide an indication of relative ranking. To determine group number, sites on the NPL are placed in groups of 50; for example, a site in Group 4 of this proposal has an HRS score that falls within the range of scores covered by the fourth group of 50 sites on the NPL.

Status of NPL

A final rule published elsewhere in today's Federal Register, results in an NPL of 1,193 sites, 1,040 in the General Superfund Section and 153 in the Federal Facilities Section. With this proposal of 14 new sites, there are now 56 sites proposed and awaiting final agency action, 47 in the General Superfund Section and 9 in the Federal Facilities Section. Final and proposed sites now total 1,249.

Withdrawal of 3 Sites From Proposal to the NPL

EPA is withdrawing the following three sites from proposal to the NPL: Cross County Sanitation Landfill in Patterson, New York; Lincoln Creosote in Bossier City, Louisiana; and Monarch Tile Manufacturing, Inc. in Florence, Alabama.

[Return to Table of Contents]

IV. Executive Order 12866

What Is Executive Order 12866?

Executive Order 12866 requires certain regulatory assessments for any "economically significant regulatory action," defined as one which would result in an annual effect on the economy of $100 million or more, or have other substantial impacts.

Is This Proposed Rule Subject to Executive Order 12866 Review?

No, this is not an economically significant regulatory action; therefore, the Office of Management and Budget (OMB) has exempted this regulatory action from Executive Order 12866 review.

[Return to Table of Contents]

V. Unfunded Mandates

What Is the Unfunded Mandates Reform Act (UMRA)?

Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public Law 104-4, establishes requirements for Federal Agencies to assess the effects of their regulatory actions on State, local, and tribal governments and the private sector. Under Section 202 of the UMRA, EPA generally must prepare a written statement, including a cost-benefit analysis, for proposed and final rules with "Federal mandates" that may result in expenditures by State, local, and tribal governments, in the aggregate, or by the private sector, of $100 million or more in any one year. Before EPA promulgates a rule for which a written statement is needed, section 205 of the UMRA generally requires EPA to identify and consider a reasonable number of regulatory alternatives and adopt the least costly, most cost-effective, or least burdensome alternative that achieves the objectives of the rule. The provisions of section 205 do not apply when they are inconsistent with applicable law. Moreover, section 205 allows EPA to adopt an alternative other than the least costly, most cost-effective, or least burdensome alternative if the Administrator publishes with the final rule an explanation why that alternative was not adopted. Before EPA establishes any regulatory requirements that may significantly or uniquely affect small governments, including tribal governments, it must have developed under section 203 of the UMRA a small government agency plan. The plan must provide for notifying potentially affected small governments, enabling officials of affected small governments to have meaningful and timely input in the development of EPA regulatory proposals with significant Federal intergovernmental mandates, and informing, educating, and advising small governments on compliance with the regulatory requirements.

Does UMRA Apply to This Proposed Rule?

No, EPA has determined that this rule does not include a Federal mandate that may result in estimated costs of $100 million or more to either State, local, or tribal governments in the aggregate. This rule will not impose any federal intergovernmental mandate because it imposes no enforceable duty upon State, tribal or local governments. Listing a site on the NPL does not itself impose any costs. Listing does not mean that EPA necessarily will undertake remedial action. Nor does listing require any action by a private party or determine liability for response costs. Costs that arise out of site reponses result from site-specific decisions regarding what actions to take, not directly from the act of listing a site on the NPL.

For the same reasons, EPA also has determined that this rule contains no regulatory requirements that might significantly or uniquely affect small governments. In addition, as discussed above, the private sector is not expected to incur costs exceeding $100 million. EPA has fulfilled the requirement for analysis under the Unfunded Mandates Reform Act.

[Return to Table of Contents]

VI. Effect on Small Businesses

What Is the Regulatory Flexibility Act?

The Regulatory Flexibility Act of 1980 requires EPA to review the impacts of this action on small entities, or certify that the action will not have a significant impact on a substantial number of small entities. By small entities, the Act refers to small businesses, small government jurisdictions, and nonprofit organizations.

Does the Regulatory Flexibility Act Apply to This Proposed Rule?

While this rule proposes to revise the NPL, an NPL revision is not a typical regulatory change since it does not automatically impose costs. As stated above, adding sites to the NPL does not in itself require any action by any party, nor does it determine the liability of any party for the cost of cleanup at the site. Further, no identifiable groups are affected as a whole. As a consequence, impacts on any group are hard to predict. A site's inclusion on the NPL could increase the likelihood of adverse impacts on responsible parties (in the form of cleanup costs), but at this time EPA cannot identify the potentially affected businesses or estimate the number of small businesses that might also be affected.

The Agency does expect that placing the sites in this proposed rule on the NPL could significantly affect certain industries, or firms within industries, that have caused a proportionately high percentage of waste site problems. However, EPA does not expect the listing of these sites to have a significant economic impact on a substantial number of small businesses.

In any case, economic impacts would occur only through enforcement and cost-recovery actions, which EPA takes at its discretion on a site-by-site basis. EPA considers many factors when determining enforcement actions, including not only a firm's contribution to the problem, but also its ability to pay. The impacts (from cost recovery) on small governments and nonprofit organizations would be determined on a similar case-by-case basis.

For the foregoing reasons, I hereby certify that this proposed rule, if promulgated, will not have a significant economic impact on a substantial number of small entities. Therefore, this proposed regulation does not require a regulatory flexibility analysis.

[Return to Table of Contents]

VII. National Technology and Advancement Act

What Is the National Technology and Advancement Act?

Section 12(d) of the National Technology and Advancement Act of 1995 (NTTAA), Public Law 104-113, section 12(d)(15 U.S.C. 272 note), directs EPA to use voluntary consensus standards in its regulatory activities unless to do so would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., materials specifications, test methods, sampling procedures, business practices, etc.) that are developed or adopted by voluntary consensus standards bodies. The NTTAA requires EPA to provide Congress, through OMB explanations when the Agency decides not to use available and applicable voluntary consensus standards.

Does the National Technology and Advancement Act Apply to This Proposed Rule?

EPA is not proposing any new test methods or other technical standards as part of today's rule, which proposes to add sites to the NPL. Thus, the Agency does not need to consider the use of voluntary consensus standards in developing this proposed rule. EPA invites public comment on this analysis.

[Return to Table of Contents]

VIII. Executive Order 13045

What Is Executive Order 13045?

On April 21, 1997, the President issued Executive Order 13045 entitled Protection of Children From Environmental Health Risks and Safety Risks (62 FR 19883). Under section 5 of the Order, a federal agency submitting a "covered regulatory action" to OMB for review under Executive Order 12866 must provide information regarding the environmental health or safety affects of the planned regulation on children. A "covered regulatory action" is defined in section 2-202 as a substantive action in a rulemaking, initiated after the date of this order or for which a Notice of Proposed Rulemaking is published 1 year after the date of this order, that is likely to result in a rule that may be "economically significant" under Executive Order 12866 and concern an environmental health risk or safety risk that an agency has reason to believe may disproportionately affect children.

Does Executive Order 13045 Apply to This Proposed Rule?

This proposed rule is not a "covered regulatory action" as defined in the Order and accordingly is not subject to section 5 of the Order. As discussed above this proposed rule does not constitute economically significant action (i.e., it is not expected to have an annual adverse impact of $100 million or more) under Executive Order 12866. Further, this rule does not concern an environmental health risk or safety risk that disproportionately affects children.

[Return to Table of Contents]

IX. Paperwork Reduction Act

What Is the Paperwork Reduction Act?

According to the Paperwork Reduction Act (PRA), 44 U.S.C. 3501 et seq., an agency may not conduct or sponsor, and a person is not required to respond to a collection of information that requires OMB approval under the PRA, unless it has been approved by OMB and displays a currently valid OMB control number. The OMB control numbers for EPA's regulations, after initial display in the preamble of the final rules, are listed in 40 CFR part 9. The information collection requirements related to this action have already been approved by OMB pursuant to the PRA under OMB control number 2070-0012 (EPA ICR No. 574).

Does the Paperwork Reduction Act Apply to This Proposed Rule?

This action does not impose any burden requiring OMB approval under the Paperwork Reduction Act.

[Return to Table of Contents]

X. Executive Order 12875

What is Executive Order 12875 and is it Applicable to This Proposed Rule?

Enhancing the Intergovernmental Partnership - This proposed rule does not impose any enforceable duty or contain any unfunded mandate that would require any prior consultation with State, local or tribal officials under Executive Order 12875.

Table 1
National Priorities List - Proposed Rule No. 25 - General Superfund Section

State Site name City/county Group
CA Pemaco Maywood Maywood 12
IL Evergreen Manor Ground Water Contamination Winnebago County 5/6
IL Indian Refinery-Texaco Lawrenceville Lawrenceville 2
LA Delatte Metals Ponchatoula 5/6
NC Davis Park Road TCE Gastonia 20
NJ Federal Creosote Manville Borough 5/6
NJ Route 561 Dump Gibbsboro 5/6
NM North Railroad Avenue Plume Espanola 5/6
NY Computer Circuits Hauppauge 5/6
NY Lehigh Valley Railroad Le Roy 5/6
WI Fox River NRDA/PCB Releases Green Bay 5/6
Number of Sites Proposed to General Superfund Section: 11.

Table 2
National Priorities List - Proposed Rule No. 25 - Federal Facilities Section

MD Andrews Air Force Base Camp Springs 5/6
MD Brandywine DRMO Brandywine 5
VA Little Creek Naval Amphibious Base Virginia Beach 5/6
Number of Sites Proposed to Federal Facilities Section: 3.


List of Subjects in 40 CFR Part 300

Environmental protection, Air pollution control, Chemicals, Hazardous materials, Intergovernmental relations, Natural resources, Oil pollution, Reporting and recordkeeping requirements, Superfund, Waste treatment and disposal, Water pollution control, Water supply.

Authority: 33 U.S.C. 1321(c)(2); 42 U.S.C. 9601-9657; E.O. 12777, 56 FR 54757, 3 CFR, 1991 Comp., p. 351; E.O. 12580, 52 FR 2923, 3 CFR, 1987 Comp., p. 193.

Dated: July 20, 1998.

Timothy Fields, Jr.,
Acting Assistant Administrator, Office of Solid Waste and Emergency Response.

FR Doc. 98-20155 Filed 7-27-98; 8:45 am

BILLING CODE 6560-50-U

Top of page

OSWER Home | Superfund Home | Innovative Technologies Home


Local Navigation


Jump to main content.