There are many stages of cleanup including site study, remedy selection, remedy design,
remedy construction, and post-construction. Activities undertaken early in the cleanup
process focus on understanding problems at the site while those taken later in the cleanup
process focus on physically addressing those problems identified. This tab provides a
detailed list of cleanup activities at this site. Sometimes, these cleanup activities are
called “actions”.
|
|
|
|
Activities Underway
|
|
|
Activity |
Leading Organization |
Area of Site Addressed (OU) |
Start Date |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL ACTION (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
05/10/2006 |
|
|
see glossary for definitions of activities,
leading organization,
operable units (OUs) or
start dates >>
|
|
|
|
Activities Completed
|
|
|
Activity |
Leading Organization |
Area of Site Addressed (OU) |
Start Date |
Completion Date |
|
|
|
CONSENT DECREE (see glossary)
|
Federal Enforcement |
FINAL GROUNDWATER (02) |
09/26/2007 |
09/11/2008 |
|
|
|
FIVE-YEAR REVIEW (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
Not Available |
07/21/2008 |
|
|
|
|
|
|
|
Lodged By DOJ (see glossary)
|
Federal Enforcement |
FINAL GROUNDWATER (02) |
Not Available |
01/25/2008 |
|
|
|
REMEDIAL DESIGN/REMEDIAL ACTION NEGOTIATIONS (see glossary)
|
Federal Enforcement |
FINAL GROUNDWATER (02) |
Not Available |
09/26/2007 |
|
|
|
PRELIMINARY CLOSE-OUT REPORT PREPARED (see glossary)
|
EPA Fund-Financed |
FINAL GROUNDWATER (02) |
Not Available |
09/29/2006 |
|
|
|
RECORD OF DECISION (see glossary)
|
Federal Enforcement |
FINAL GROUNDWATER (02) |
Not Available |
09/29/2006 |
|
|
|
|
Outcome:
Final Remedy Selected at Site
Technologies Used:
Covenant;
Easement;
Flocculation;
Impermeable Barrier;
Monitoring;
and Operations & Maintenance (O&M).
|
|
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL INVESTIGATION/FEASIBILITY STUDY (see glossary)
|
Responsible Party |
FINAL GROUNDWATER (02) |
09/29/1995 |
09/29/2006 |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL DESIGN (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
08/05/2005 |
05/10/2006 |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL ACTION (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
08/04/2003 |
02/28/2006 |
|
|
|
|
Outcome:
Final Remedial Action Report
Technologies Used:
Building, demolition, or excavation regulation;
Cap;
Disposal;
Excavation;
and Extraction.
|
|
|
|
|
Notice of Intent by All Parties (see glossary)
|
|
SOURCE AREAS (01) |
Not Available |
08/22/2005 |
|
|
|
UNILATERAL ADMIN ORDER (see glossary)
|
Federal Enforcement |
SOURCE AREAS (01) |
Not Available |
08/05/2005 |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL DESIGN (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
07/31/2003 |
08/04/2003 |
|
|
|
Notice of Intent by All Parties (see glossary)
|
|
SOURCE AREAS (01) |
Not Available |
07/31/2003 |
|
|
|
UNILATERAL ADMIN ORDER (see glossary)
|
Federal Enforcement |
SOURCE AREAS (01) |
Not Available |
07/17/2003 |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMOVAL (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
10/01/2001 |
10/21/2002 |
|
|
|
|
|
|
|
RECORD OF DECISION (see glossary)
|
Federal Enforcement |
SOURCE AREAS (01) |
Not Available |
09/30/2002 |
|
|
|
|
Technologies Used:
Cap;
Covenant;
Discharge;
Disposal;
Excavation;
Extraction;
and Monitoring.
View
Documentation
[70KB]
|
|
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMEDIAL INVESTIGATION/FEASIBILITY STUDY (see glossary)
|
Responsible Party |
SOURCE AREAS (01) |
09/29/1995 |
09/30/2002 |
|
|
|
POTENTIALLY RESPONSIBLE PARTY REMOVAL (see glossary)
|
Responsible Party |
SITEWIDE (00) |
09/29/1995 |
05/30/1999 |
|
|
|
|
|
|
|
STATE SUPPORT AGENCY COOPERATIVE AGREEMENT (see glossary)
|
Federal Enforcement |
SOURCE AREAS (01) |
04/11/1995 |
06/30/1996 |
|
|
|
ADMINISTRATIVE ORDER ON CONSENT (see glossary)
|
Federal Enforcement |
SITEWIDE (00) |
Not Available |
09/29/1995 |
|
|
|
NEGOTIATION (GENERIC) (see glossary)
|
Federal Enforcement |
SITEWIDE (00) |
06/14/1995 |
09/29/1995 |
|
|
|
Special Notice Issued (see glossary)
|
Federal Enforcement |
SITEWIDE (00) |
Not Available |
06/14/1995 |
|
|
|
FINAL LISTING ON NATIONAL PRIORITIES LIST (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
Not Available |
12/16/1994 |
|
|
|
PROPOSAL TO NATIONAL PRIORITIES LIST (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
Not Available |
08/23/1994 |
|
|
|
HAZARD RANKING SYSTEM PACKAGE (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
Not Available |
08/16/1994 |
|
|
|
PRELIMINARY ASSESSMENT (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
11/01/1983 |
09/28/1984 |
|
|
|
|
|
|
|
SITE INSPECTION (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
02/01/1980 |
02/01/1980 |
|
|
|
|
|
|
|
DISCOVERY (see glossary)
|
EPA Fund-Financed |
SITEWIDE (00) |
Not Available |
07/01/1979 |
|
|
see glossary for definitions of activities,
leading organization,
operable units (OUs),
start dates,
completion dates,
outcome and
remedial technology >>
|
|
|
|
|
The majority of these documents are in PDF format. To download a document,
right click on the respective link and select Save Target As. Please note that
download time may be extended given the size of the document. File size is noted
in kilobytes (KB) or megabytes (MB) next to each download link. If file size
exceeds 15MB, the link will be
inactive. Please submit a request for the
document instead, as files of this size are not available for download. This page may not
list all documents available for this site.
|
|
|
|