Skip common site navigation and headers
United States Environmental Protection Agency
National Pollutant Discharge Elimination System (NPDES)
Begin Hierarchical Links EPA Home > OW Home > OWM Home > NPDES Home > NPDES Permit Program Basics > Overview of the Water Quality Standards-to-Permits Process End Hierarchical Links
Statutes and Regulations
 
Water Quality and Technology-Based Permitting
 
Applications
 
Tools for Permit Writers
 
State Program Information
 
Permitted Universe and Backlog Reduction
 
 
 
NPDES Permit Program Basics Home

 

NPDES Topics Alphabetical Index Glossary About NPDES

Overview of the Water Quality Standards-to-Permits Process

  1. The process begins when a state or Indian tribe establishes water quality standards for a water body within its jurisdiction, as required by the Clean Water Act. Water quality standards include designated uses for a water body (e.g., public water supply, propagation of fish and wildlife, recreation); water quality criteria necessary to support the designated uses; and a policy for preventing degradation of the quality of water bodies. Water quality criteria include numeric criteria for specific parameters (e.g., copper, chlorine, temperature, pH); toxicity criteria to protect against the aggregate effects of toxic pollutants; and narrative criteria that describe the desired condition of the water body (e.g., free from visible oil sheen).
  2. States and tribes assess water bodies to determine whether they are attaining the established standards.
  3. After identifying potential water quality problems, the state or tribe sets priorities for which water bodies to target first for further evaluation.
  4. The state or tribe may then evaluate the appropriateness of the established water quality standards for specific waters and reaffirm or refine the standards as appropriate.
  5. Next, the state or tribe defines what controls on point and nonpoint sources are necessary either through an analysis of the entire water body or by assessing the impact of individual sources of pollution (e.g., a single industrial process wastewater discharge). When assessing point source discharges to determine whether controls based on water quality standards are necessary, an NPDES permitting authority should conduct an analysis to determine whether the discharge causes, has the "reasonable potential" to cause, or contributes to an excursion of any water quality criteria in the receiving water. Where effluent limits based on water quality standards are necessary, the permitting authority allocates responsibility for controls through wasteload allocations and then effluent limits in NPDES permits consistent with those wasteload allocations.
  6. Controls on individual sources are established through nonpoint source programs or NPDES permits.
  7. Point source effluent monitoring allows the NPDES authority to assess compliance with the required controls and take enforcement actions where necessary.
  8. Finally, the state or tribe uses the information gathered from monitoring sources of pollution and the quality of the water body itself to measure progress in attaining water quality standards.
National Pollutant Discharge Elimination System Home

NPDES Permit Program Basics Information
Recent Additions

FAQs

Publications

Regulations

Training & Meetings

Links

Contacts

 
 Register to Receive NPDES News Alerts!  
Adobe Acrobat Reader Icon
The documents on this site are best viewed
with Acrobat 8.0

 

Office of Water | Office of Wastewater Management | Disclaimer | Search EPA

Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us

Last updated on June 25, 2002 12:55 PM
URL:http://cfpub.epa.gov/npdes/wqbasedpermitting/wqoverview.cfm