Part 60-4  

Construction Contractors--Affirmative Action Requirements


41 CFR 60-4.6 - Goals and timetables.

  • Section Number: 60-4.6
  • Section Name: Goals and timetables.

    The Director, from time to time, shall issue goals and timetables 
for minority and female utilization which shall be based on appropriate 
workforce, demographic or other relevant data and which shall cover 
construction projects or construction contracts performed in specific 
geographical areas. The goals, which shall be applicable to each 
construction trade in a covered contractor's or subcontractor's entire 
workforce which is working in the area covered by the goals and 
timetables, shall be published as notices in the Federal Register, and 
shall be inserted by the contracting officers and applicants, as 
applicable, in the Notice required by 41 CFR 60-4.2. Covered 
construction contractors performing construction work in geographical 
areas where they do not have a Federal or federally assisted 
construction contract shall apply the minority and female goals 
established for the geographical area where the work is being performed.
[45 FR 65978, Oct. 3, 1980]