Mark Wales
|
October 28, 2002 |
In the
issues dealing with "Changes in Level" Concrete flatwork will crack, and once
the concrete cracks, there exists a level change that is automatically a
violation of the requirements as they are proposed. This then becomes a
maintenance nightmare, and a potential source for litigation that is not
reasonable.
Please consider this comment along with the rest.
Thanks Scott!
Mark