Closure and Post-Closure Care for Hazardous Waste Treatment, Storage, and Disposal Facilities (TSDFs)

Hazardous waste storage area

When a hazardous waste management unit stops receiving waste at the end of its active life, it must be cleaned up, closed, and monitored and maintained in accordance with the RCRA closure and post-closure care requirements. All hazardous waste management units and the treatment, storage, and disposal facilities (TSDFs) at which they are located are subject to the closure and post-closure care requirements found at 40 CFR Part 264/265, Subpart G Closure and Post-Closure (Part 264 applies to permitted facilities and Part 265 applies to facilities in operation before these rules became effective, referred to as “interim status facilities”). The various types of hazardous waste management units (e.g., containers, tanks, landfills, waste piles) are also subject to unit specific closure requirements found in Subparts I through X.

For more information, see:

Closure

At treatment, storage, and disposal facilities (TSDFs) were multiple hazardous waste management units are in operation, one unit may cease operation while the remaining units continue operating. This is known as partial closure. The closed units, or inactive portion of the facility are subject to all applicable closure standards. Final closure occurs when all hazardous waste management units cease operation and close according to the regulations.

When closing units or facilities, two approaches are possible — clean closure or closure with the waste in place:

Closure Plans

All TSDFs are required to prepare and submit written closure plans. A permitted facility submits this plan as part of its permit application. Once the plan is approved by the permitting agency, it becomes part of the facility’s operating permit. Interim status facilities must have written closure plans within six months of becoming subject to the closure regulations.

All closure plans must include:

Closure Timetables

The regulations specify a strict time line for completing closure. This process actually begins before the final shipment of waste is received by a unit or facility with a notification of intent to close. Facilities with landfills, surface impoundments, land treatment units, and waste piles are required to notify the EPA Regional Administrator 60 days prior to the date on which they intend to begin partial or final closure. Facilities with containers, tanks, incinerators, and/or boilers and industrial furnaces must make the notification 45 days in advance.

After a unit receives its last shipment of hazardous waste, it has 30 days to commence closure operations. Within 90 days of receipt of the last shipment, all waste must be removed (if clean closing) or disposed on site (if closing with waste in place). All closure operations must be completed within 180 days of receiving the final waste shipment. In some cases, it may be possible for the facility to receive extensions on the 90- and 180-day deadlines from the EPA Regional Administrator.

After closure operations are complete, the facility has 60 days to certify closure completion by submitting a written certification via registered mail to the EPA Regional Administrator. This certification must be signed by an independent, registered, professional engineer. At the same time (i.e., within 60 days of completing closure), a survey plat indicating the location and dimensions of the closed hazardous waste management unit(s) or facility must be submitted to the EPA Regional Administrator or local zoning authority.

Delay of Closure

Some facilities may be able to delay final closure and continue to receive nonhazardous waste after receipt of the final shipment of hazardous waste. This option is only available to landfills, surface impoundments, and land treatment units. Only units with sufficient excess capacity that receive permission from the EPA Regional Administrator may delay closure.

Top of Page

Post-Closure Care

Post-closure care is required for land disposal units that leave waste in place upon closure (i.e., landfills, land treatment units, surface impoundments, any other hazardous waste management unit that cannot achieve the clean closure standards). These sites must monitor and maintain liners, final covers, leachate collection and removal systems, leak detection systems, and gas collection systems to protect the surrounding environment and population from releases of hazardous constituents. The standard post-closure care period is 30 years, but this can be shortened or extended on a case-by-case basis by the permitting authority (i.e., the EPA Region or the authorized state regulatory agency).

All units and facilities required to provide post-closure care are subject to the general post-closure requirements found at 40 CFR Parts 264/265.116 through 120. Each unit is also subject to unit specific post-closure care requirements found in 40 CFR Part 264/265, Subparts K (Surface Impoundments), L (Waste Piles), M (Land Treatment), N (Landfills), and X (Miscellaneous Units).

All facilities required to provide post-closure care need to obtain a post-closure care permit. In applying for a permit, the facility must complete and submit a post-closure care plan. This plan includes:

Once the post-closure care period ends, the facility owner/operator must provide (via registered mail) a certification of post-closure care completion to the EPA Regional Administrator. This certification is due within 60 days of completing post-closure care and must be signed by the facility owner/operator and an independent, registered professional engineer.

Top of Page

Resources

RCRA Training Module Introduction to Closure/PostClosure (PDF) (16 pp, 142 K, about PDF) Provides an introduction to the closure and post-closure care requirements for hazardous waste treatment, storage, and disposal units and facilities.

RCRA Orientation Manual: Chapter 5. Regulations Governing Treatment, Storage, and Disposal Facilities (PDF) (36 pp, 681 K, about PDF) Provides introductory information on the closure and post-closure care requirements for hazardous waste treatment, storage, and disposal facilities.

Standards Applicable to Owners and Operators of Closed and Closing Hazardous Waste Management Facilities: Post-Closure Permit Requirement and Closure Process (Final Rule, October 22, 1998).

RCRA Online Database Indexes thousands of letters, memoranda, publications, and questions and answers issued by EPA's Office of Resource Conservation and Recovery (ORCR). These documents represent EPA Headquarters interpretations of the RCRA regulations governing the management of solid, hazardous, and medical waste.

RCRA FAQ Database Enables users to search frequently asked questions, or submit their own question/comment on a variety of RCRA issues and topics.

Top of Page


Local Navigation




Jump to main content.