PART 194--CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S COMPLIANCE WITH THE 40 CFR PART 191 DISPOSAL REGULATIONS
194.1
Purpose, scope, and applicability.
194.2
Definitions.
194.3
Communications.
194.4
Conditions of compliance certification.
194.5
Publications incorporated by reference.
194.6
Alternative provisions.
194.7
Effective date.
194.8
Approval process for waste shipment from waste generator sites for disposal at the WIPP.
194.11
Completeness and accuracy of compliance applications.
194.12
Submission of compliance applications.
194.13
Submission of reference materials.
194.14
Content of compliance certification application.
194.15
Content of compliance re-certification application(s).
194.21
Inspections.
194.22
Quality assurance.
194.23
Models and computer codes.
194.24
Waste characterization.
194.25
Future state assumptions.
194.26
Expert judgment.
194.27
Peer review.
194.31
Application of release limits.
194.32
Scope of performance assessments.
194.33
Consideration of drilling events in performance assessments.
194.34
Results of performance assessments.
194.41
Active institutional controls.
194.42
Monitoring.
194.43
Passive institutional controls.
194.44
Engineered barriers.
194.45
Consideration of the presence of resources.
194.46
Removal of waste.
194.51
Consideration of protected individual.
194.52
Consideration of exposure pathways.
194.53
Consideration of underground sources of drinking water.
194.54
Scope of compliance assessments.
194.55
Results of compliance assessments.
194.61
Advance notice of proposed rulemaking for certification.
194.62
Notice of proposed rulemaking for certification.
194.63
Final rule for certification.
194.64
Documentation of continued compliance.
194.65
Notice of proposed rulemaking for modification or revocation.