Title 30--Mineral Resources

CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR

PART 7--TESTING BY APPLICANT OR THIRD PARTY


TEXT PDF7.1 Purpose and scope.
TEXT PDF7.2 Definitions.
TEXT PDF7.3 Application procedures and requirements.
TEXT PDF7.4 Product testing.
TEXT PDF7.5 Issuance of approval.
TEXT PDF7.6 Approval marking and distribution record.
TEXT PDF7.7 Quality assurance.
TEXT PDF7.8 Post-approval product audit.
TEXT PDF7.9 Revocation.
TEXT PDF7.10 MSHA acceptance of equivalent non-MSHA product safety standards.
TEXT PDF7.21 Purpose and effective date.
TEXT PDF7.22 Definitions.
TEXT PDF7.23 Application requirements.
TEXT PDF7.24 Technical requirements.
TEXT PDF7.25 Critical characteristics.
TEXT PDF7.26 Flame test apparatus.
TEXT PDF7.27 Test for flame resistance of brattice cloth.
TEXT PDF7.28 Test for flame resistance of rigid ventilation tubing.
TEXT PDF7.29 Approval marking.
TEXT PDF7.30 Post-approval product audit.
TEXT PDF7.31 New technology.
TEXT PDF7.41 Purpose and effective date.
TEXT PDF7.42 Definitions.
TEXT PDF7.43 Application requirements.
TEXT PDF7.44 Technical requirements.
TEXT PDF7.45 Critical characteristics
TEXT PDF7.46 Impact test.
TEXT PDF7.47 Deflection temperature test.
TEXT PDF7.48 Acid resistance test.
TEXT PDF7.49 Approval marking.
TEXT PDF7.50 Post-approval product audit.
TEXT PDF7.51 Approval checklist.
TEXT PDF7.52 New technology.
TEXT PDF7.61 Purpose and effective date.
TEXT PDF7.62 Definitions.
TEXT PDF7.63 Application requirements.
TEXT PDF7.64 Technical requirements.
TEXT PDF7.65 Critical characteristics.
TEXT PDF7.66 Output energy test.
TEXT PDF7.67 Construction test.
TEXT PDF7.68 Firing line terminals test.
TEXT PDF7.69 Approval marking.
TEXT PDF7.70 Post-approval product audit.
TEXT PDF7.71 Approval checklist.
TEXT PDF7.72 New technology.
TEXT PDF7.81 Purpose and effective date.
TEXT PDF7.82 Definitions.
TEXT PDF7.83 Application requirements.
TEXT PDF7.84 Technical requirements.
TEXT PDF7.85 Critical characteristics.
TEXT PDF7.86 Test equipment and specifications.
TEXT PDF7.87 Test to determine the maximum fuel-air ratio.
TEXT PDF7.88 Test to determine the gaseous ventilation rate.
TEXT PDF7.89 Test to determine the particulate index.
TEXT PDF7.90 Approval marking.
TEXT PDF7.91 Post-approval product audit.
TEXT PDF7.92 New technology.
TEXT PDF7.95 Purpose and effective date.
TEXT PDF7.96 Definitions.
TEXT PDF7.97 Application requirements.
TEXT PDF7.98 Technical requirements.
TEXT PDF7.99 Critical characteristics.
TEXT PDF7.100 Explosion tests.
TEXT PDF7.101 Surface temperature tests.
TEXT PDF7.102 Exhaust gas cooling efficiency test.
TEXT PDF7.103 Safety system control test.
TEXT PDF7.104 Internal static pressure test.
TEXT PDF7.105 Approval marking.
TEXT PDF7.106 Post-approval product audit.
TEXT PDF7.107 New technology.
TEXT PDF7.108 Power package checklist.
TEXT PDF7.301 Purpose and effective date.
TEXT PDF7.302 Definitions.
TEXT PDF7.303 Application requirements.
TEXT PDF7.304 Technical requirements.
TEXT PDF7.305 Critical characteristics.
TEXT PDF7.306 Explosion tests.
TEXT PDF7.307 Static pressure test.
TEXT PDF7.308 Lockwasher equivalency test.
TEXT PDF7.309 Approval marking.
TEXT PDF7.310 Post-approval product audit.
TEXT PDF7.311 Approval checklist.
TEXT PDF7.401 Purpose and effective date.
TEXT PDF7.402 Definitions.
TEXT PDF7.403 Application requirements.
TEXT PDF7.404 Technical requirements.
TEXT PDF7.405 Critical characteristics.
TEXT PDF7.406 Flame test apparatus.
TEXT PDF7.407 Test for flame resistance of electric cables and cable splices.
TEXT PDF7.408 Test for flame resistance of signaling cables.
TEXT PDF7.409 Approval marking.
TEXT PDF7.410 Post-approval product audit.
TEXT PDF7.411 New technology.


---------------------------------------------------------------------
-----------

[BACK ][BACK ]