Title 30--Mineral Resources

CHAPTER II--MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR

PART 250--OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF


TEXT PDF250.101 Authority and applicability.
TEXT PDF250.102 What does this part do?
TEXT PDF250.103 Where can I find more information about the requirements in this part?
TEXT PDF250.104 How may I appeal a decision made under MMS regulations?
TEXT PDF250.105 Definitions.
TEXT PDF250.106 What standards will the Director use to regulate lease operations?
TEXT PDF250.107 What must I do to protect health, safety, property, and the environment?
TEXT PDF250.108 What requirements must I follow for cranes and other material-handling equipment?
TEXT PDF250.109 What documents must I prepare and maintain related to welding?
TEXT PDF250.110 What must I include in my welding plan?
TEXT PDF250.111 Who oversees operations under my welding plan?
TEXT PDF250.112 What standards must my welding equipment meet?
TEXT PDF250.113 What procedures must I follow when welding?
TEXT PDF250.114 How must I install and operate electrical equipment?
TEXT PDF250.115 How do I determine well producibility?
TEXT PDF250.116 How do I determine producibility if my well is in the Gulf of Mexico?
TEXT PDF250.117 How does a determination of well producibility affect royalty status?
TEXT PDF250.118 Will MMS approve gas injection?
TEXT PDF250.119 Will MMS approve subsurface gas storage?
TEXT PDF250.120 How does injecting, storing, or treating gas affect my royalty payments?
TEXT PDF250.121 What happens when the reservoir contains both original gas in place and injected gas?
TEXT PDF250.122 What effect does subsurface storage have on the lease term?
TEXT PDF250.123 Will MMS allow gas storage on unleased lands?
TEXT PDF250.124 Will MMS approve gas injection into the cap rock containing a sulphur deposit?
TEXT PDF250.125 Service fees.
TEXT PDF250.130 Why does MMS conduct inspections?
TEXT PDF250.131 Will MMS notify me before conducting an inspection?
TEXT PDF250.132 What must I do when MMS conducts an inspection?
TEXT PDF250.133 Will MMS reimburse me for my expenses related to inspections?
TEXT PDF250.135 What will MMS do if my operating performance is unacceptable?
TEXT PDF250.136 How will MMS determine if my operating performance is unacceptable?
TEXT PDF250.140 When will I receive an oral approval?
TEXT PDF250.141 May I ever use alternate procedures or equipment?
TEXT PDF250.142 How do I receive approval for departures?
TEXT PDF250.143 How do I designate an operator?
TEXT PDF250.144 How do I designate a new operator when a designation of operator terminates?
TEXT PDF250.145 How do I designate an agent or a local agent?
TEXT PDF250.146 Who is responsible for fulfilling leasehold obligations?
TEXT PDF250.150 How do I name facilities and wells in the Gulf of Mexico Region?
TEXT PDF250.151 How do I name facilities in the Pacific Region?
TEXT PDF250.152 How do I name facilities in the Alaska Region?
TEXT PDF250.153 Do I have to rename an existing facility or well?
TEXT PDF250.154 What identification signs must I display?
TEXT PDF250.160 When will MMS grant me a right-of-use and easement, and what requirements must I meet?
TEXT PDF250.161 What else must I submit with my application?
TEXT PDF250.162 May I continue my right-of-use and easement after the termination of any lease on which it is situated?
TEXT PDF250.163 If I have a State lease, will MMS grant me a right-of-use and easement?
TEXT PDF250.164 If I have a State lease, what conditions apply for a right-of-use and easement?
TEXT PDF250.165 If I have a State lease, what fees do I have to pay for a right-of-use and easement?
TEXT PDF250.166 If I have a State lease, what surety bond must I have for a right-of-use and easement?
TEXT PDF250.168 May operations or production be suspended?
TEXT PDF250.169 What effect does suspension have on my lease?
TEXT PDF250.170 How long does a suspension last?
TEXT PDF250.171 How do I request a suspension?
TEXT PDF250.172 When may the Regional Supervisor grant or direct an SOO or SOP?
TEXT PDF250.173 When may the Regional Supervisor direct an SOO or SOP?
TEXT PDF250.174 When may the Regional Supervisor grant or direct an SOP?
TEXT PDF250.175 When may the Regional Supervisor grant an SOO?
TEXT PDF250.176 Does a suspension affect my royalty payment?
TEXT PDF250.177 What additional requirements may the Regional Supervisor order for a suspension?
TEXT PDF250.180 What am I required to do to keep my lease term in effect?
TEXT PDF250.181 When may the Secretary cancel my lease and when am I compensated for cancellation?
TEXT PDF250.182 When may the Secretary cancel a lease at the exploration stage?
TEXT PDF250.183 When may MMS or the Secretary extend or cancel a lease at the development and production stage?
TEXT PDF250.184 What is the amount of compensation for lease cancellation?
TEXT PDF250.185 When is there no compensation for a lease cancellation?
TEXT PDF250.187 What are MMS' incident reporting requirements?
TEXT PDF250.188 What incidents must I report to MMS and when must I report them?
TEXT PDF250.189 Reporting requirements for incidents requiring immediate notification.
TEXT PDF250.190 What reporting information and report forms must I submit?
TEXT PDF250.190 Reporting requirements for incidents requiring written notification.
TEXT PDF250.191 What accident reports must I submit?
TEXT PDF250.191 How does MMS conduct incident investigations?
TEXT PDF250.192 What evacuation statistics must I submit?
TEXT PDF250.193 Reports and investigations of apparent violations.
TEXT PDF250.194 How must I protect archaeological resources?
TEXT PDF250.195 What notification does MMS require on the production status of wells?
TEXT PDF250.196 Reimbursements for reproduction and processing costs.
TEXT PDF250.197 Data and information to be made available to the public or for limited inspection.
TEXT PDF250.198 Documents incorporated by reference.
TEXT PDF250.199 Paperwork Reduction Act statements--information collection.
TEXT PDF250.200 Definitions.
TEXT PDF250.201 What plans and information must I submit before I conduct any activities on my lease or unit?
TEXT PDF250.202 What criteria must the Exploration Plan (EP), Development and Production Plan (DPP), or Development Operations Coordination Document (DOCD) meet?
TEXT PDF250.203 Where can wells be located under an EP, DPP, or DOCD?
TEXT PDF250.204 How must I protect the rights of the Federal government?
TEXT PDF250.205 Are there special requirements if my well affects an adjacent property?
TEXT PDF250.206 How do I submit the EP, DPP, or DOCD?
TEXT PDF250.207 What ancillary activities may I conduct?
TEXT PDF250.208 If I conduct ancillary activities, what notices must I provide?
TEXT PDF250.209 What is the MMS review process for the notice?
TEXT PDF250.210 If I conduct ancillary activities, what reporting and data/information retention requirements must I satisfy?
TEXT PDF250.211 What must the EP include?
TEXT PDF250.212 What information must accompany the EP?
TEXT PDF250.213 What general information must accompany the EP?
TEXT PDF250.214 What geological and geophysical (G&G) information must accompany the EP?
TEXT PDF250.215 What hydrogen sulfide (H2S) information must accompany the EP?
TEXT PDF250.216 What biological, physical, and socioeconomic information must accompany the EP?
TEXT PDF250.217 What solid and liquid wastes and discharges information and cooling water intake information must accompany the EP?
TEXT PDF250.218 What air emissions information must accompany the EP?
TEXT PDF250.219 What oil and hazardous substance spills information must accompany the EP?
TEXT PDF250.220 If I propose activities in the Alaska OCS Region, what planning information must accompany the EP?
TEXT PDF250.221 What environmental monitoring information must accompany the EP?
TEXT PDF250.222 What lease stipulations information must accompany the EP?
TEXT PDF250.223 What mitigation measures information must accompany the EP?
TEXT PDF250.224 What information on support vessels, offshore vehicles, and aircraft you will use must accompany the EP?
TEXT PDF250.225 What information on the onshore support facilities you will use must accompany the EP?
TEXT PDF250.226 What Coastal Zone Management Act (CZMA) information must accompany the EP?
TEXT PDF250.227 What environmental impact analysis (EIA) information must accompany the EP?
TEXT PDF250.228 What administrative information must accompany the EP?
TEXT PDF250.231 After receiving the EP, what will MMS do?
TEXT PDF250.232 What actions will MMS take after the EP is deemed submitted?
TEXT PDF250.233 What decisions will MMS make on the EP and within what timeframe?
TEXT PDF250.234 How do I submit a modified EP or resubmit a disapproved EP, and when will MMS make a decision?
TEXT PDF250.235 If a State objects to the EP's coastal zone consistency certification, what can I do?
TEXT PDF250.241 What must the DPP or DOCD include?
TEXT PDF250.242 What information must accompany the DPP or DOCD?
TEXT PDF250.243 What general information must accompany the DPP or DOCD?
TEXT PDF250.244 What geological and geophysical (G&G) information must accompany the DPP or DOCD?
TEXT PDF250.245 What hydrogen sulfide (H2S) information must accompany the DPP or DOCD?
TEXT PDF250.246 What mineral resource conservation information must accompany the DPP or DOCD?
TEXT PDF250.247 What biological, physical, and socioeconomic information must accompany the DPP or DOCD?
TEXT PDF250.248 What solid and liquid wastes and discharges information and cooling water intake information must accompany the DPP or DOCD?
TEXT PDF250.249 What air emissions information must accompany the DPP or DOCD?
TEXT PDF250.250 What oil and hazardous substance spills information must accompany the DPP or DOCD?
TEXT PDF250.251 If I propose activities in the Alaska OCS Region, what planning information must accompany the DPP?
TEXT PDF250.252 What environmental monitoring information must accompany the DPP or DOCD?
TEXT PDF250.253 What lease stipulations information must accompany the DPP or DOCD?
TEXT PDF250.254 What mitigation measures information must accompany the DPP or DOCD?
TEXT PDF250.255 What decommissioning information must accompany the DPP or DOCD?
TEXT PDF250.256 What related facilities and operations information must accompany the DPP or DOCD?
TEXT PDF250.257 What information on the support vessels, offshore vehicles, and aircraft you will use must accompany the DPP or DOCD?
TEXT PDF250.258 What information on the onshore support facilities you will use must accompany the DPP or DOCD?
TEXT PDF250.259 What sulphur operations information must accompany the DPP or DOCD?
TEXT PDF250.260 What Coastal Zone Management Act (CZMA) information must accompany the DPP or DOCD?
TEXT PDF250.261 What environmental impact analysis (EIA) information must accompany the DPP or DOCD?
TEXT PDF250.262 What administrative information must accompany the DPP or DOCD?
TEXT PDF250.266 After receiving the DPP or DOCD, what will MMS do?
TEXT PDF250.267 What actions will MMS take after the DPP or DOCD is deemed submitted?
TEXT PDF250.268 How does MMS respond to recommendations?
TEXT PDF250.269 How will MMS evaluate the environmental impacts of the DPP or DOCD?
TEXT PDF250.270 What decisions will MMS make on the DPP or DOCD and within what timeframe?
TEXT PDF250.271 For what reasons will MMS disapprove the DPP or DOCD?
TEXT PDF250.272 If a State objects to the DPP's or DOCD's coastal zone consistency certification, what can I do?
TEXT PDF250.273 How do I submit a modified DPP or DOCD or resubmit a disapproved DPP or DOCD?
TEXT PDF250.280 How must I conduct activities under the approved EP, DPP, or DOCD?
TEXT PDF250.281 What must I do to conduct activities under the approved EP, DPP, or DOCD?
TEXT PDF250.282 Do I have to conduct post-approval monitoring?
TEXT PDF250.283 When must I revise or supplement the approved EP, DPP, or DOCD?
TEXT PDF250.284 How will MMS require revisions to the approved EP, DPP, or DOCD?
TEXT PDF250.285 How do I submit revised and supplemental EPs, DPPs, and DOCDs?
TEXT PDF250.286 What is a DWOP?
TEXT PDF250.287 For what development projects must I submit a DWOP?
TEXT PDF250.288 When and how must I submit the Conceptual Plan?
TEXT PDF250.289 What must the Conceptual Plan contain?
TEXT PDF250.290 What operations require approval of the Conceptual Plan?
TEXT PDF250.291 When and how must I submit the DWOP?
TEXT PDF250.292 What must the DWOP contain?
TEXT PDF250.293 What operations require approval of the DWOP?
TEXT PDF250.294 May I combine the Conceptual Plan and the DWOP?
TEXT PDF250.295 When must I revise my DWOP?
TEXT PDF250.296 When and how must I submit a CID or a revision to a CID?
TEXT PDF250.297 What information must a CID contain?
TEXT PDF250.298 How long will MMS take to evaluate and make a decision on the CID?
TEXT PDF250.299 What operations require approval of the CID?
TEXT PDF250.300 Pollution prevention.
TEXT PDF250.301 Inspection of facilities.
TEXT PDF250.302 Definitions concerning air quality.
TEXT PDF250.303 Facilities described in a new or revised Exploration Plan or Development and Production Plan.
TEXT PDF250.304 Existing facilities.
TEXT PDF250.400 Who is subject to the requirements of this subpart?
TEXT PDF250.401 What must I do to keep wells under control?
TEXT PDF250.402 When and how must I secure a well?
TEXT PDF250.403 What drilling unit movements must I report?
TEXT PDF250.404 What are the requirements for the crown block?
TEXT PDF250.405 What are the safety requirements for diesel engines used on a drilling rig?
TEXT PDF250.406 What additional safety measures must I take when I conduct drilling operations on a platform that has producing wells or has other hydrocarbon flow?
TEXT PDF250.407 What tests must I conduct to determine reservoir characteristics?
TEXT PDF250.408 May I use alternative procedures or equipment during drilling operations?
TEXT PDF250.409 May I obtain departures from these drilling requirements?
TEXT PDF250.410 How do I obtain approval to drill a well?
TEXT PDF250.411 What information must I submit with my application?
TEXT PDF250.412 What requirements must the location plat meet?
TEXT PDF250.413 What must my description of well drilling design criteria address?
TEXT PDF250.414 What must my drilling prognosis include?
TEXT PDF250.415 What must my casing and cementing programs include?
TEXT PDF250.416 What must I include in the diverter and BOP descriptions?
TEXT PDF250.417 What must I provide if I plan to use a mobile offshore drilling unit (MODU)?
TEXT PDF250.418 What additional information must I submit with my APD?
TEXT PDF250.420 What well casing and cementing requirements must I meet?
TEXT PDF250.421 What are the casing and cementing requirements by type of casing string?
TEXT PDF250.422 When may I resume drilling after cementing?
TEXT PDF250.423 What are the requirements for pressure testing casing?
TEXT PDF250.424 What are the requirements for prolonged drilling operations?
TEXT PDF250.425 What are the requirements for pressure testing liners?
TEXT PDF250.426 What are the recordkeeping requirements for casing and liner pressure tests?
TEXT PDF250.427 What are the requirements for pressure integrity tests?
TEXT PDF250.428 What must I do in certain cementing and casing situations?
TEXT PDF250.430 When must I install a diverter system?
TEXT PDF250.431 What are the diverter design and installation requirements?
TEXT PDF250.432 How do I obtain a departure to diverter design and installation requirements?
TEXT PDF250.433 What are the diverter actuation and testing requirements?
TEXT PDF250.434 What are the recordkeeping requirements for diverter actuations and tests?
TEXT PDF250.440 What are the general requirements for BOP systems and system components?
TEXT PDF250.441 What are the requirements for a surface BOP stack?
TEXT PDF250.442 What are the requirements for a subsea BOP stack?
TEXT PDF250.443 What associated systems and related equipment must all BOP systems include?
TEXT PDF250.444 What are the choke manifold requirements?
TEXT PDF250.445 What are the requirements for kelly valves, inside BOPs, and drill-string safety valves?
TEXT PDF250.446 What are the BOP maintenance and inspection requirements?
TEXT PDF250.447 When must I pressure test the BOP system?
TEXT PDF250.448 What are the BOP pressure tests requirements?
TEXT PDF250.449 What additional BOP testing requirements must I meet?
TEXT PDF250.450 What are the recordkeeping requirements for BOP tests?
TEXT PDF250.451 What must I do in certain situations involving BOP equipment or systems?
TEXT PDF250.455 What are the general requirements for a drilling fluid program?
TEXT PDF250.456 What safe practices must the drilling fluid program follow?
TEXT PDF250.457 What equipment is required to monitor drilling fluids?
TEXT PDF250.458 What quantities of drilling fluids are required?
TEXT PDF250.459 What are the safety requirements for drilling fluid-handling areas?
TEXT PDF250.460 What are the requirements for conducting a well test?
TEXT PDF250.461 What are the requirements for directional and inclination surveys?
TEXT PDF250.462 What are the requirements for well-control drills?
TEXT PDF250.463 Who establishes field drilling rules?
TEXT PDF250.465 When must I submit an Application for Permit to Modify (APM) or an End of Operations Report to MMS?
TEXT PDF250.466 What records must I keep?
TEXT PDF250.467 How long must I keep records?
TEXT PDF250.468 What well records am I required to submit?
TEXT PDF250.469 What other well records could I be required to submit?
TEXT PDF250.490 Hydrogen sulfide.
TEXT PDF250.490 Hydrogen sulfide
TEXT PDF250.500 General requirements.
TEXT PDF250.501 Definition.
TEXT PDF250.502 Equipment movement.
TEXT PDF250.503 Emergency shutdown system.
TEXT PDF250.504 Hydrogen sulfide.
TEXT PDF250.505 Subsea completions.
TEXT PDF250.506 Crew instructions.
TEXT PDF250.509 Well-completion structures on fixed platforms.
TEXT PDF250.510 Diesel engine air intakes.
TEXT PDF250.511 Traveling-block safety device.
TEXT PDF250.512 Field well-completion rules.
TEXT PDF250.513 Approval and reporting of well-completion operations.
TEXT PDF250.514 Well-control fluids, equipment, and operations.
TEXT PDF250.515 Blowout prevention equipment.
TEXT PDF250.516 Blowout preventer system tests, inspections, and maintenance.
TEXT PDF250.517 Tubing and wellhead equipment.
TEXT PDF250.600 General requirements.
TEXT PDF250.601 Definitions.
TEXT PDF250.602 Equipment movement.
TEXT PDF250.603 Emergency shutdown system.
TEXT PDF250.604 Hydrogen sulfide.
TEXT PDF250.605 Subsea workovers.
TEXT PDF250.606 Crew instructions.
TEXT PDF250.609 Well-workover structures on fixed platforms.
TEXT PDF250.610 Diesel engine air intakes.
TEXT PDF250.611 Traveling-block safety device.
TEXT PDF250.612 Field well-workover rules.
TEXT PDF250.613 Approval and reporting for well-workover operations.
TEXT PDF250.614 Well-control fluids, equipment, and operations.
TEXT PDF250.615 Blowout prevention equipment.
TEXT PDF250.616 Blowout preventer system testing, records, and drills.
TEXT PDF250.617 Tubing and wellhead equipment.
TEXT PDF250.618 Wireline operations.
TEXT PDF250.800 General requirements.
TEXT PDF250.801 Subsurface safety devices.
TEXT PDF250.802 Design, installation, and operation of surface production-safety systems.
TEXT PDF250.803 Additional production system requirements.
TEXT PDF250.804 Production safety-system testing and records.
TEXT PDF250.805 Safety device training.
TEXT PDF250.806 Safety and pollution prevention equipment quality assurance requirements.
TEXT PDF250.807 Hydrogen sulfide.
TEXT PDF250.900 What general requirements apply to all platforms?
TEXT PDF250.901 What industry standards must your platform meet?
TEXT PDF250.902 What are the requirements for platform removal and location clearance?
TEXT PDF250.903 What records must I keep?
TEXT PDF250.904 What is the Platform Approval Program?
TEXT PDF250.905 How do I get approval for the installation, modification, or repair of my platform?
TEXT PDF250.906 What must I do to obtain approval for the proposed site of my platform?
TEXT PDF250.907 Where must I locate foundation boreholes?
TEXT PDF250.908 What are the minimum structural fatigue design requirements?
TEXT PDF250.909 What is the Platform Verification Program?
TEXT PDF250.910 Which of my facilities are subject to the Platform Verification Program?
TEXT PDF250.911 If my platform is subject to the Platform Verification Program, what must I do?
TEXT PDF250.912 What plans must I submit under the Platform Verification Program?
TEXT PDF250.913 When must I resubmit Platform Verification Program plans?
TEXT PDF250.914 How do I nominate a CVA?
TEXT PDF250.915 What are the CVA's primary responsibilities?
TEXT PDF250.916 What are the CVA's primary duties during the design phase?
TEXT PDF250.917 What are the CVA's primary duties during the fabrication phase?
TEXT PDF250.918 What are the CVA's primary duties during the installation phase?
TEXT PDF250.919 What in-service inspection requirements must I meet?
TEXT PDF250.920 What are the MMS requirements for assessment of platforms?
TEXT PDF250.921 How do I analyze my platform for cumulative fatigue?
TEXT PDF250.1000 General requirements.
TEXT PDF250.1001 Definitions.
TEXT PDF250.1002 Design requirements for DOI pipelines.
TEXT PDF250.1003 Installation, testing, and repair requirements for DOI pipelines.
TEXT PDF250.1004 Safety equipment requirements for DOI pipelines.
TEXT PDF250.1005 Inspection requirements for DOI pipelines.
TEXT PDF250.1006 How must I decommission and take out of service a DOI pipeline?
TEXT PDF250.1007 What to include in applications.
TEXT PDF250.1008 Reports.
TEXT PDF250.1009 Requirements to obtain pipeline right-of-way grants.
TEXT PDF250.1010 General requirements for pipeline right-of-way holders.
TEXT PDF250.1011 Bond requirements for pipeline right-of-way holders.
TEXT PDF250.1012 Required payments for pipeline right-of-way holders.
TEXT PDF250.1013 Grounds for forfeiture of pipeline right-of-way grants.
TEXT PDF250.1014 When pipeline right-of-way grants expire.
TEXT PDF250.1015 Applications for pipeline right-of-way grants.
TEXT PDF250.1016 Granting pipeline rights-of-way.
TEXT PDF250.1017 Requirements for construction under pipeline right-of-way grants.
TEXT PDF250.1018 Assignment of pipeline right-of-way grants.
TEXT PDF250.1019 Relinquishment of pipeline right-of-way grants.
TEXT PDF250.1100 Definitions for production rates.
TEXT PDF250.1101 General requirements and classification of reservoirs.
TEXT PDF250.1102 Oil and gas production rates.
TEXT PDF250.1103 Well production testing.
TEXT PDF250.1104 Bottomhole pressure survey.
TEXT PDF250.1105 Flaring or venting gas and burning liquid hydrocarbons.
TEXT PDF250.1106 Downhole commingling.
TEXT PDF250.1107 Enhanced oil and gas recovery operations.
TEXT PDF250.1200 Question index table.
TEXT PDF250.1201 Definitions.
TEXT PDF250.1202 Liquid hydrocarbon measurement.
TEXT PDF250.1203 Gas measurement.
TEXT PDF250.1204 Surface commingling.
TEXT PDF250.1205 Site security.
TEXT PDF250.1300 What is the purpose of this subpart?
TEXT PDF250.1301 What are the requirements for unitization?
TEXT PDF250.1302 What if I have a competitive reservoir on a lease?
TEXT PDF250.1303 How do I apply for voluntary unitization?
TEXT PDF250.1304 How will MMS require unitization?
TEXT PDF250.1400 How does MMS begin the civil penalty process?
TEXT PDF250.1401 Index table.
TEXT PDF250.1402 Definitions.
TEXT PDF250.1403 What is the maximum civil penalty?
TEXT PDF250.1404 Which violations will MMS review for potential civil penalties?
TEXT PDF250.1405 When is a case file developed?
TEXT PDF250.1406 When will MMS notify me and provide penalty information?
TEXT PDF250.1407 How do I respond to the letter of notification?
TEXT PDF250.1408 When will I be notified of the Reviewing Officer's decision?
TEXT PDF250.1409 What are my appeal rights?
TEXT PDF250.1500 Definitions.
TEXT PDF250.1501 What is the goal of my training program?
TEXT PDF250.1502 Is there a transition period for complying with the regulations in this subpart?
TEXT PDF250.1503 What are my general responsibilities for training?
TEXT PDF250.1504 May I use alternative training methods?
TEXT PDF250.1505 Where may I get training for my employees?
TEXT PDF250.1506 How often must I train my employees?
TEXT PDF250.1507 How will MMS measure training results?
TEXT PDF250.1508 What must I do when MMS administers written or oral tests?
TEXT PDF250.1509 What must I do when MMS administers or requires hands-on, simulator, or other types of testing?
TEXT PDF250.1510 What will MMS do if my training program does not comply with this subpart?
TEXT PDF250.1600 Performance standard.
TEXT PDF250.1601 Definitions.
TEXT PDF250.1602 Applicability.
TEXT PDF250.1603 Determination of sulphur deposit.
TEXT PDF250.1604 General requirements.
TEXT PDF250.1605 Drilling requirements.
TEXT PDF250.1606 Control of wells.
TEXT PDF250.1607 Field rules.
TEXT PDF250.1608 Well casing and cementing.
TEXT PDF250.1609 Pressure testing of casing.
TEXT PDF250.1610 Blowout preventer systems and system components.
TEXT PDF250.1611 Blowout preventer systems tests, actuations, inspections, and maintenance.
TEXT PDF250.1612 Well-control drills.
TEXT PDF250.1613 Diverter systems.
TEXT PDF250.1614 Mud program.
TEXT PDF250.1615 Securing of wells.
TEXT PDF250.1616 Supervision, surveillance, and training.
TEXT PDF250.1617 Application for permit to drill.
TEXT PDF250.1618 Sundry notices and reports on wells.
TEXT PDF250.1619 Well records.
TEXT PDF250.1620 Well-completion and well-workover requirements.
TEXT PDF250.1621 Crew instructions.
TEXT PDF250.1622 Approvals and reporting of well-completion and well-workover operations.
TEXT PDF250.1623 Well-control fluids, equipment, and operations.
TEXT PDF250.1624 Blowout prevention equipment.
TEXT PDF250.1625 Blowout preventer system testing, records, and drills.
TEXT PDF250.1626 Tubing and wellhead equipment.
TEXT PDF250.1627 Production requirements.
TEXT PDF250.1628 Design, installation, and operation of production systems.
TEXT PDF250.1629 Additional production and fuel gas system requirements.
TEXT PDF250.1630 Safety-system testing and records.
TEXT PDF250.1631 Safety device training.
TEXT PDF250.1632 Production rates.
TEXT PDF250.1633 Production measurement.
TEXT PDF250.1634 Site security.
TEXT PDF250.1700 What do the terms ``decommissioning'', ``obstructions'', and ``facility'' mean?
TEXT PDF250.1701 Who must meet the decommissioning obligations in this subpart?
TEXT PDF250.1702 When do I accrue decommissioning obligations?
TEXT PDF250.1703 What are the general requirements for decommissioning?
TEXT PDF250.1704 When must I submit decommissioning applications and reports?
TEXT PDF250.1710 When must I permanently plug all wells on a lease?
TEXT PDF250.1711 When will MMS order me to permanently plug a well?
TEXT PDF250.1712 What information must I submit before I permanently plug a well or zone?
TEXT PDF250.1713 Must I notify MMS before I begin well plugging operations?
TEXT PDF250.1714 What must I accomplish with well plugs?
TEXT PDF250.1715 How must I permanently plug a well?
TEXT PDF250.1716 To what depth must I remove wellheads and casings?
TEXT PDF250.1717 After I permanently plug a well, what information must I submit?
TEXT PDF250.1721 If I temporarily abandon a well that I plan to re-enter, what must I do?
TEXT PDF250.1722 If I install a subsea protective device, what requirements must I meet?
TEXT PDF250.1723 What must I do when it is no longer necessary to maintain a well in temporary abandoned status?
TEXT PDF250.1725 When do I have to remove platforms and other facilities?
TEXT PDF250.1726 When must I submit an initial platform removal application and what must it include?
TEXT PDF250.1727 What information must I include in my final application to remove a platform or other facility?
TEXT PDF250.1728 To what depth must I remove a platform or other facility?
TEXT PDF250.1729 After I remove a platform or other facility, what information must I submit?
TEXT PDF250.1730 When might MMS approve partial structure removal or toppling in place?
TEXT PDF250.1740 How must I verify that the site of a permanently plugged well, removed platform, or other removed facility is clear of obstructions?
TEXT PDF250.1741 If I drag a trawl across a site, what requirements must I meet?
TEXT PDF250.1742 What other methods can I use to verify that a site is clear?
TEXT PDF250.1743 How do I certify that a site is clear of obstructions?
TEXT PDF250.1750 When may I decommission a pipeline in place?
TEXT PDF250.1751 How do I decommission a pipeline in place?
TEXT PDF250.1752 How do I remove a pipeline?
TEXT PDF250.1753 After I decommission a pipeline, what information must I submit?
TEXT PDF250.1754 When must I remove a pipeline decommissioned in place?


---------------------------------------------------------------------
-----------

[BACK ][BACK ]