[Header] PHMSA - U.S. Department of Transportation - Pipeline and Hazardous materials Safety Adminis
spacer
For the Public
 
Hazmat Safety Community Pipeline Safety Community Media | Congress
 
Doing Business with PHMSA
 
PHMSA Home

PHMSA Interpretation #07-0166

Feb 25, 2008

PHMSA Response Letter

February 25, 2008

Mr. Darrel K. Garton
CTC Certified Training Co.
62537 North Star Drive
Montrose, CO 81401

Ref. No. 07-0166

Dear Mr. Garton:

This responds to your letter requesting clarification of the cylinder requalification requirements under the Hazardous Materials Regulations (HMR; 49 CFR Parts 171-180). Specifically, you ask three questions pertaining to the requalification requirements applicable to DOT specification 3AL cylinders manufactured from 6351-T6 aluminum alloy, as follows:

Q1. Is it permissible for a retester to subcontract with an outside company who does not hold a current approval (RIN) to provide the eddy current examination service, as prescribed by § 180.209(m)?

A1. No.

Q2. Is it permissible for a retester to subcontract with an outside company who does hold a current approval (RIN) to provide the eddy current examination service, as prescribed by § 180.209(m)?

A2. Yes.

Q3. If the answer to Q2 is yes, is it possible for a company who is not a retester to obtain a “V” number RIN for the purposes of eddy current examination and visual inspection only and then be authorized as a subcontractor in accordance with Q2?

A2. Yes.

I trust this satisfies your inquiry. Please contact us if we can be of further assistance.

Sincerely,

Hattie L. Mitchell
Chief, Regulatory Review and Reinvention
Office of Hazardous Materials Standards

180.209(m)

Careers  |  Contact Us  |  No Fear  |  Privacy Policy  |  FOIA  |  Accessibility  |  FAQs  |  Web Policies  |  Site Map  |  Download Acrobat