Table 10.1 – Costs of Final Revised Guidelines: Facility: Office Buildings Costs as Percentage of Total Construction Costs Compared to: Current Guidelines (Upper Bound) 0.02 to 0.10 % IBC (Lower Bound) 0.01 to 0.08 % Facility: Hotels Costs as Percentage of Total Construction Costs Compared to: Current Guidelines (Upper Bound) 0.06 to 0.50 % IBC (Lower Bound) 0.04 to 0.30 % Facility: Hospitals and Nursing Homes Costs as Percentage of Total Construction Costs Compared to: Current Guidelines (Upper Bound) 0.02 % IBC (Lower Bound) 0.00 % Facility: Federal, State, and Local Government Housing Costs as Percentage of Total Construction Costs Compared to: Current Guidelines (Upper Bound) 0.01 % IBC (Lower Bound) 0.01 %