Skip to contentUnited States Department of Transportation - Federal Highway AdministrationSearch FHWAFeedback

Asset Management

Printable Version of this case study (0.5 mb)

Transportation Asset Management Case Studies
Life-Cycle Cost Analysis: The Georgia Experience

Table of Contents

Workshop report cover: Aerial photograph showing the crisscrossing ramps and lanes of the I-285/I-85 Interchange.

FRONT COVER PHOTO: The I-285/I-85 Interchange in Atlanta, better known as 'Spaghetti Junction.'

Photo courtesy of the Georgia Department of Industry, Trade and Tourism.

Presented by

U.S. Department of Transportation Federal Highway Administration

FHWA-IF-07-009

PDF files can be viewed with the Acrobat® Reader®
    Next >>

Events

More Information

Contact

Nathaniel Coley
Office of Asset Management
202-366-2171
E-mail Nathaniel

 
 
This page last modified on 10/14/08
 

FHWA
United States Department of Transportation - Federal Highway Administration