[Federal Register: April 12, 2002 (Volume 67, Number 71)]
[Notices]               
[Page 17979-17980]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr12ap02-39]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP02-128-000]

 
Destin Pipeline Company, L.L.C.; Notice of Application

April 5, 2001.
    Take notice that on March 29, 2002, Destin Pipeline Company, L.L.C. 
(Destin), 501 WestLake Park Boulevard, Houston, Texas 77079-2696, filed 
in Docket No. CP02-128-000 an application pursuant to section 7(c) of 
the Natural Gas Act (NGA) and part 157 of the Federal Energy Regulatory 
Commission' s (Commission) regulations for a certificate of public 
convenience and necessity authorizing Destin to make modifications at 
its Pascagoula Gas Plant, located in Jackson County, Mississippi, all 
as more fully set forth in the application which is on file with the 
Commission and open to public inspection. The filing may be viewed on 
the Web at http://www.ferc.gov using the ``RIMS'' link, select ``Docket 
#'' from the RIMS Menu and follow the instructions (call (202) 208-222 
for assistance).
    Specifically, Destin requests authorization to add an additional 
gas scrubber and 16-inch ultrasonic gas meters at the inlet and outlet 
of the gas plant. The additional facilities will have the same design 
features as the current facilities. These modifications will

[[Page 17980]]

increase Destin's current design capacity from the current 1.0 Billion 
cubic feet (Bcf) per day to 1.2 Bcf per day.
    The estimated cost of the project is approximately $1.2 million. 
All costs of the project will be borne by Destin Pipeline Company. 
Destin requests that a final certificate order be issued no later than 
June 1, 2002, in order to complete the project by October 1, 2002.
    Any questions regarding this application should be directed to Mr. 
Bruce G. Reed, Director, Regulatory Affairs, Destin Pipeline Company, 
L.L.C., 501 WestLake Park Boulevard, Houston, Texas 77079-2696 or call 
(281) 366-5062.
    There are two ways to become involved in the Commission's review of 
this project. First, any person wishing to obtain legal status by 
becoming a party to the proceedings for this project should, on or 
before April 15, 2002, file with the Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426, a motion to 
intervene in accordance with the requirements of the Commission's Rules 
of Practice and Procedure (18 CFR 385.214 or 385.211) and the 
Regulations under the NGA (18 CFR 157.10). A person obtaining party 
status will be placed on the service list maintained by the Secretary 
of the Commission and will receive copies of all documents filed by the 
applicant and by all other parties. A party must submit 14 copies of 
filings made with the Commission and must mail a copy to the applicant 
and to every other party in the proceeding. Only parties to the 
proceeding can ask for court review of Commission orders in the 
proceeding.
    However, a person does not have to intervene in order to have 
comments considered. The second way to participate is by filing with 
the Secretary of the Commission, as soon as possible, an original and 
two copies of comments in support of or in opposition to this project. 
The Commission will consider these comments in determining the 
appropriate action to be taken, but the filing of a comment alone will 
not serve to make the filer a party to the proceeding. The Commission's 
rules require that persons filing comments in opposition to the project 
provide copies of their protests only to the party or parties directly 
involved in the protest.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission may issue a preliminary determination on non-
environmental issues prior to the completion of its review of the 
environmental aspects of the project. This preliminary determination 
typically considers such issues as the need for the project and its 
economic effect on existing customers of the applicant, on other 
pipelines in the area, and on landowners and communities. For example, 
the Commission considers the extent to which the applicant may need to 
exercise eminent domain to obtain rights-of-way for the proposed 
project and balances that against the non-environmental benefits to be 
provided by the project. Therefore, if a person has comments on 
community and landowner impacts from this proposal, it is important 
either to file comments or to intervene as early in the process as 
possible.
    Comments and protests may be filed electronically via the internet 
in lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions 
on the Commission's Web site under the ``e-Filing'' link.
    If the Commission decides to set the application for a formal 
hearing before an Administrative Law Judge, the Commission will issue 
another notice describing that process. At the end of the Commission's 
review process, a final Commission order approving or denying a 
certificate will be issued.

Linwood A. Watson, Jr.,
Deputy Secretary.
[FR Doc. 02-8899 Filed 4-11-02; 8:45 am]
BILLING CODE 6717-01-P