DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EG02-136.000, et al.]

 
Waterside Power, L.L.C., et al.; Electric Rate and Corporate 
Regulation Filings

May 31, 2002.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Waterside Power, L.L.C.

[Docket No. EG02-136-000]

    Take notice that on May 28, 2002, Waterside Power, L.L.C. filed 
with the Federal Energy Regulatory Commission an application for 
determination of exempt wholesale generator status pursuant to section 
32(a)(1) of the Public Utility Holding Company Act of 1935. The 
applicant is a limited liability company organized under the laws of 
the State of Delaware that is engaged directly and exclusively in 
developing, owning, and operating a 69.25 MW (net) gas turbine electric 
generating facility, which will be an eligible facility.
    Comment Date: June 21, 2002.

2. Deseret Generation & Transmission Co-operative, Inc.

[Docket No. ER99-2506-001]

    Take notice that on May 28, 2002, Deseret Generation & Transmission 
Co-operative, Inc. (Deseret) tendered for filing a triennial updated 
market analysis as required by the Federal Energy Regulatory Commission 
in approval of Deseret's market-based rate schedule. Copies of this 
filing were served upon Deseret's member cooperatives.
    Comment Date: June 18, 2002.

3. Minnesota Power

[Docket No. ER01-2636-001]

    Take notice that on May 28, 2002, Minnesota Power tendered for 
filing its triennial market power update.
    Comment Date: June 18, 2002.

4. Entergy Arkansas, Inc.

[Docket No. ER02-1151-002]

    Take notice that on May 28, 2002, Entergy Services, Inc., on behalf 
of Entergy Arkansas, Inc., tendered for filing with the Federal Energy 
Regulatory Commission (Commission), a compliance Interconnection and 
Operating Agreement with Plum Point Energy Associates, LLC, in response 
to the Commission's April 25, 2002, order in Entergy Arkansas, Inc., 99 
FERC [para] 61,097 (2002).
    Comment Date: June 18, 2002.

5. PPL University Park, LLC

[Docket No. ER02-1327-001]

    Take notice that on May 28, 2002, PPL University Park, LLC filed a 
compliance filing pursuant to the Federal Energy Regulatory 
Commission's Letter Order issued May 9, 2002 in this docket.
    PPL University Park states that a copy of this filing has been 
served upon each person designated on the official service list 
compiled by the Secretary in this proceeding.
    Comment Date: June 18, 2002.

6. Wisconsin Electric Power Company

[Docket No. ER02-1886-000]

    Take notice that on May 22, 2002, Wisconsin Electric Power Company 
(Wisconsin Electric) tendered for filing changes to Exhibit B of the 
Second Revised Power Sales Agreement, Second Revised Rate Schedule FERC 
No. 90, between Wisconsin Electric and Wisconsin Public Power, Inc.
    Wisconsin Electric respectfully requests an effective date of 
February 1, 2002.
    Comment Date: June 12, 2002.

7. Wisconsin Electric Power Company

[Docket No. ER02-1887-000]

    Take notice that on May 22, 2002, Wisconsin Electric Power Company 
(Wisconsin Electric) tendered for filing changes to the Wholesale 
Distribution Delivery Service Agreement, Rate Schedule FERC No. 97, 
between Wisconsin Electric and Wisconsin Public Power, Inc.
    Wisconsin Electric respectfully requests an effective date of 
February 1, 2002.
    Comment Date: June 12, 2002.

8. Entergy Services, Inc.

[Docket No. ER02-1888-000] Take notice that on May 22, 2002, Entergy 
Services, Inc., on behalf of Entergy Gulf States, Inc. (Entergy Gulf 
States), tendered for filing six copies of a Notice of Termination of 
the Interconnection and Operating Agreement and Generator Imbalance 
Agreement between Entergy Gulf States and Hartburg Power, LP.

    Comment Date: June 12, 2002.

9. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1889-000]

    Take notice that on May 23, 2002, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO), the Administrator of 
the Mid-Continent Area Power Pool (MAPP) Tariff filed with the Federal 
Energy Regulatory Commission (Commission) pursuant to section 205 of 
the Federal Power Act and Section 35.13 of the Commission's 
regulations, 18 CFR 35.13 (2001), a Long-Term Firm Service Agreement 
for transmission service for Utilities Plus under MAPP Schedule F.
    A copy of this filing was sent to Utilities Plus.
    Comment Date: June 13, 2002.

10. Edison Source

[Docket No. ER02-1891-000]

    Take notice that on May 23, 2002, Edison Source filed to cancel its 
Market-Based Rate Tariff.
    Comment Date: June 13, 2002.

11. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1892-000]

    Take notice that on May 23, 2002, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO), the Administrator of 
the Mid-Continent Area Power Pool (MAPP) Tariff filed with the Federal 
Energy Regulatory Commission (Commission) pursuant to section 205 of 
the Federal Power Act and Section 35.13 of the Commission's 
regulations, 18 CFR 35.13 (2001), a Long-Term Firm Service Agreement 
No. 276 for transmission service for OTP Wholesale Marketing under MAP 
Schedule F.
    A copy of this filing was sent to OTP Wholesale Marketing.
    Comment Date: June 13, 2002.

12. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1893-000]

    Take notice that on May 23, 2002, the Midwest Independent 
Transmission System Operator, Inc. (Midwest ISO), the Administrator of 
the Mid-Continent Area Power Pool (MAPP) Tariff filed with the Federal 
Energy Regulatory Commission (Commission) pursuant to section 205 of 
the Federal Power Act and Section 35.13 of the Commission's 
regulations, 18 CFR 35.13 (2001), a Long-Term Firm Service Agreement 
No. 277 for transmission service for OTP Wholesale Marketing under MAP 
Schedule F.
    A copy of this filing was sent to OTP Wholesale Marketing.
    Comment Date: June 13, 2002.

Standard Paragraph

    E. Any person desiring to intervene or to protest this filing 
should file with the Federal Energy Regulatory Commission, 888 First 
Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214 
of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be

[[Page 39710]]

taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a motion to 
intervene. All such motions or protests should be filed on or before 
the comment date, and, to the extent applicable, must be served on the 
applicant and on any other person designated on the official service 
list. This filing is available for review at the Commission or may be 
viewed on the Commission's Web site at http://www.ferc.gov using the 
``RIMS'' link, select ``Docket '' and follow the instructions 
(call 202-208-2222 for assistance). Protests and interventions may be 
filed electronically via the Internet in lieu of paper; see 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's Web site 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. 02-14413 Filed 6-7-02; 8:45 am]